Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

Reference:

Contractor:

[LOGO]

[COMPANY NAME]

COMPANY STANDARD
PROCEDURES

Document Title:

Document no:

DRAIN & SEWER INSPECTION PROCEDURE

Revision:

[CSP - 00]
00

DRAIN & SEWER INSPECTION


PROCEDURE
TEMPLATES ASSOCIATED WITH
THIS PROCEDURE IS EXCLUDED
AS IT FORMS PART OF THE
QUALITY CONTROL PACKAGE

REVISION RECORD
These procedures are issued under the authority of the Managing Director and apply when carrying out these activities
described. Revisions may be issued from time to time, as necessary, under the authority of the Quality Control department.
Revisions will be recorded on the revision schedule, which will be issued with the revised pages.
Rev.
00

Date
22-May-13

Description
Initial Issue

Prepared by
XXXX

Checked
XXX

Approved
XXX

UNCONTROLLED COPY
This Document is the property of [Company Name].
This document is for internal use only. Its reproduction is prohibited unless authorized by [Company Name]

Page 1 of 7

[LOGO]

Reference:

Contractor:

[COMPANY NAME]

COMPANY STANDARD
PROCEDURES

Document Title:

Document no:

DRAIN & SEWER INSPECTION PROCEDURE

Revision:

[CSP - 00]
00

CONTENTS
1.

SCOPE ....................................................................................................................................................... 3

2.

GENERAL .................................................................................................................................................. 3
2.1
2.2
2.3

3.

PROCEDURE.............................................................................................................................................. 3
3.1
3.2
3.3
3.4
3.5
3.6
3.7
3.8
3.9
3.10
3.11
3.12

4.

PROCEDURE RESPONSIBILITY........................................................................................................................ 3
IMPORTANCE OF THE WORK........................................................................................................................ 3
WORK RESPONSIBILITY ................................................................................................................................ 3
SURVEY AND SETTING OUT .......................................................................................................................... 3
MANHOLE EXCAVATION............................................................................................................................. 3
MANHOLE CONSTRUCTION ........................................................................................................................ 3
PIPELINE EXCAVATION ................................................................................................................................ 4
TRENCH BOTTOM PREPARATION .................................................................................................................. 4
PIPE INSPECTION ........................................................................................................................................ 4
PIPE LAYING .............................................................................................................................................. 4
BACKFILLING .............................................................................................................................................. 4
MAIN BACKFILL .......................................................................................................................................... 4
DRAINS & SEWER LINE INSPECTION REPORT .................................................................................................. 5
SEWER TESTING........................................................................................................................................... 5
NON-CONFORMANCES .............................................................................................................................. 6

DOCUMENTATION ................................................................................................................................... 6
TEMPLATE 1 DRAINS & SEWER LINE INSPECTION REPORT ....................................................................................... 7

UNCONTROLLED COPY
This Document is the property of [Company Name].
This document is for internal use only. Its reproduction is prohibited unless authorized by [Company Name]

Page 2 of 7

You might also like