Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

FOOTING SCHEDULE

MARK

REINFORCEMENT

DIMENSION
Length Width Thickness Depth
(mm) (mm) (mm)
(mm)

Bar Along "X"


Top

Bot

Bar Along "X"


Top

Bot

F-1

3000

2000

300

2000

@150mm

@150mm

@150mm

@150mm

F-2

2000

2000

300

2000

@150mm

@150mm

@150mm

@150mm

COLUMN DETAIL
DESIGNATION DIMENSION

REBARS

DESIGNATION B (mm) L (mm) VERT. STIRRUPS

C-1

175

700

C-2

175

700

C-3

175

600

PC-1

175

500

PC-2

175

450

PC-3

175

450

8-

8-

6-

6-

spaced @
2-50mm,
4-100mm,
6-150mm, rest
200mm

6-

6-

SLAB DETAIL

SHORT DIRECTION
DESIGNATION

THICKNESS

LEFT SUP.
TOP

S-1

100mm

S-1

100mm

BOT

LONG DIRECTION

MID.
TOP

LEFT SUP.
BOT

TOP

BOT

MID.
TOP

BOT

space @ space @ space @ space @ space @ space @ space @ space @


100mm 150mm 150mm 100mm 100mm 150mm 150mm 100mm

space @
150mm

space @
150mm

space @
150mm

space @
150mm

You might also like