ALAYDNOD GADYOANIAY LSVOAYdFEATURES OF SPEED CONCRETE PILES
‘Safe Working Load of Speed Concrete P!
accordance with BS 8004:198¢
Safe Working Load = fcu/3.65*Ac + fectAsc
|e calculated in
Speed Concrete Piles are designed in compliance with
BSB0O4:1986 and BS8110:1997 and JKR 20709-0182-91 and
JKR 20709-0359-95 with the approval from institut Latihan and Where
Penyeidikan Jabatan Kerja Raya Malaysia (IKRAM). fou = Characteristo Cube Strength of
Concrete at 28 days
‘The detall design of high strength concrete plies is manufactured Ac =Area of Concrete (mm?)
Lnder stringent controled conditions, We provide a full range of fsc = 175 Nimm for High Yield Reinforcement
pile sizes ranging from 150mm to 400mm of square plle with Asc =Area of Steel (mm)
‘vertous Workng loan sapacity for different ype of 96 eondmions miso compresiv sos for onglucnarbiorsemart Le. 0.58ty
and demands of diferent project nature, freteonnt
DESIGN & SPECIFICATIONS
‘The safe loads are tabulated:
NOMINAL SiZE|
60% 150 5
T7175 s
200 %200 a =
zoxae0 | 7 %
a0oxs00 | 12 s ed 75 2706
30x60 | 12 5 1267 173 3442
aoox 00 42 5 7964 Ba 5176
Nole : These working loads are only the structural ca
bul shall not exceed the maximum working |
QUALITY CONTROL,
‘The quality of products Is achieved by carrying out schedule testing In accordance with the specifications. This isto
‘oncure that the products are of high quality standard and In compliance with the Code of Practice for safety usage In
the construction work.
ie of piles. The actual working capacities depend on the soil conditions
‘Among the test to be carried out from time to time are:
+ Grading test and relevant test for aggregate
+ Slump tost on frosh concrete
+ Compressive strenath test for concrete cube
+ Stringent inspection on reinforcement cage to ensure strict compliance to the drawing
+ Post-casting checks on finished piles for straightness, cross-section, allgnmont of joints and fitings
STACKING
Piles should be stored on firm and stable ground not llable to settlement under the weight of piles. The piles should be
placed on strong support (hard wood) which are truly level and spaced s0 as to avoid undue bending stress in the pi
‘The supports should be placed vertically In line with timber bearers placed at 0.2L from both ends of the plies within
bottom layer well above the ground.
HANDLING
For unioading/traneterring of piles within the construction site, use the 2 liting hooks provides (2 points pick up).
‘When pitching a pile, please use a wire rope to go round the pile at 0.3L form the upper end,SADSOUNEADANON vaoncnan on
DIMENSION AND DETAILS OF PILES
srmsuns pure
| opm, |MOMNAL] aw | sree. fooncReTEL = ANCHORAGE | OcrumAL| WORKS |
we. | NOUN Tver fearon) a [aes PET on | asoov_|nm|mm| ants (STUUR) ORS,
(mm) (my | (nos) {size) (As mm] (Ac men’) |(mm)| (nos) |(c.c mm) |(nos)| (cc mm)|joint| shoe |nos|dialtength| Ptons | tons
Fan] anc [e063] 8 woe | is [ss] 8] @ [x] ww [2] 4 [sla oo] ae |e
‘A360| 360x350 [12.963] 4 vast | 121243 | 55| 2 | 40 |x| 120 | 12| 4 | [20] 600| 173 145
xo] worata [eee 3| 4 wows [ss] ] [xp [ola [afl eo] as]
rate encase [26a] 8 7%
‘A200[ 200x200 [63 4 452 | soe [45[ | 60 | x | 100 [6 | 3 [4 [12] 380 ‘a7 “a
Aas] 175x475 6.3 4 314 moat [45] 3 80 x 86 [6 | 3 [4 [tf 330 a 6
Aisi taociso [43 [4 au ewe asp fx] 6 as] 3 awl e
NOSTRDMROPLE
Rag] 2000200 | 63 [4 7 34_| 30688 145] 0 | 60 | x] 100 ]6]3]4|w] 0] 55 &
am wes [a3 [ete | me [om fasts] mw [x] [els [elm] ae 3%
Re wore [a3 | eto] om | eee [asp Lee fas] 3 [ew a | ae B
16 cotrayesr smoot won mot
Peeper tn cet ee a ry a Se
SRESESST ct amncesawes | Meaesoece oes fem BEE.Headquaters Office:
ROR SCE
era Meee ts
ORE edo ecu
Eee UR
Seeger
BOERS RCE)
a eC Ra
nunc)
NCTC oR Coe
LLY
RR Ue ene
Pre uue eeN
44200 Rasa, Hulu Selangor,
econ ie
SO Me CIPLC EPA
OSI CCRC Ad
ra Aad
SQPLEDETALS
SARTERUNT-ELEATON
Fea Re lie
Lie PR
Ou
Cee
Johor Darul Takzim
aN EEE OK ALT
Mobile No : +6016 331 8475
va CME ACR Ia
au
TS A ON tke cd
26080'Kuantan,
ea at
A Ey Ey
I er RELIC!
a CEES
Lm Ty
24 KM, Jalan Paloh
Eee
Rance
SO ASL Tg
NOS Renee creer)
a Ce LAST}