1 Pembangunan Rumah Sakit Universitas Sebelas Maret Surakarta

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

ID

Task Name
1
2
3
4

1 PEMBANGUNAN RUMAH SAKIT UNIVERSITAS SEBELAS MARET


SURAKARTA
1.1 PRELIMINARY WORKS
1.2 EARTH WORKS & SUNDRIES ITEM - INFRASTRUCTURE &
CONCRETE
WORKS
AND TUNNEL WORKS FOR CABLE TRAY
1.3 STRUCTURAL
WORKS

1.3.1 BUILDING A (MAIN BUILDING)

1.3.2 BUILDING B (BUILDING MERC)

1.3.3 BUILDING C (BUILDING UTILITY)

1.4 ARCHITECTURAL WORKS

1.5 BUILDING A (MAIN BUILDING)

10

1.5.1 BASEMENT FLOOR

11

1.5.2 FLOOR LEVEL 1

12

1.5.3 FLOOR LEVEL 2

13

1.5.4 FLOOR LEVEL 3

14

1.5.5 FLOOR LEVEL 4

15

1.5.6 FLOOR LEVEL 5

16

1.5.7 FLOOR LEVEL 6

17

1.5.8 FLOOR LEVEL 7

18

1.5.9 FLOOR LEVEL ATAP

19

1.5.10 BRIDGE FINISH

20

1.6 BUILDING B (BUILDING MERC)

21

1.6.1 FLOOR LEVEL 1

22

1.6.2 FLOOR LEVEL 2

23

1.6.3 FLOOR LEVEL 3

24
25
26

1.7 BUILDING C (BUILDING UTILITY)


1.7.1 FLOOR LEVEL 1
1.8 MECHANICAL WORKS

27

1.8.1 BUILDING A (MAIN BUILDING)

28

1.8.2 BUILDING B (BUILDING MERC)

29

1.8.3 BUILDING C (BUILDING UTILITY)

30

1.8.4 SITE

31

1.9 ELECTRICAL WORKS

32

1.9.1 BUILDING A (MAIN BUILDING)

33

1.9.2 BUILDING B (BUILDING MERC)

34

1.9.3 BUILDING C (BUILDING UTILITY)

35

1.9.4 SITE

36

1.10 FIXED FURNITURE WORKS

37

1.11 CONNECTION PERMITS