Professional Documents
Culture Documents
Balance Material (Rebar)
Balance Material (Rebar)
PROJECT
CLIENT
WORK PACKAGE
PROJECT NO.
:
PROJECT "X"
:
OWNER
: BALANCE MATERIAL
: 5712
0001
STOCK
NO.
I
1.00
2.00
3.00
4.00
5.00
6.00
DESCRIPTION
Tulangan
8
10
D13
D16
D19
D22
SPEC
BJTP-24
BJTP-24
BJTD-40
BJTD-40
BJTD-40
BJTD-40
VOL
172.00
1,289.00
1,246.00
576.00
204.00
157.00
UNIT
Batang
Batang
Batang
Batang
Batang
Batang
VOL
1,583.00
604.00
665.00
1,131.00
-
UNIT
Batang
Batang
Batang
Batang
Batang
Batang
VOL
14.00
83.00
83.00
24.00
-
UNIT
Batang
Batang
Batang
Batang
Batang
Batang
VOL
6.00
8.00
-
UNIT
Batang
Batang
Batang
Batang
Batang
Batang
VOL
UNIT
2.00
3.00
-
Batang
Batang
Batang
Batang
Batang
Batang
VOL
25.00
59.00
146.00
-
UNIT
Batang
Batang
Batang
Batang
Batang
Batang
PER 24-Jan-2015
6
VOL
UNIT
7.00
9.00
-
Batang
Batang
Batang
Batang
Batang
Batang
VOL
PLUS / MINUS
UNIT
23.00
7.00
-
Batang
Batang
Batang
Batang
Batang
Batang
VOL
172.00
(371.00)
473.00
(318.00)
(951.00)
157.00
UNIT
Batang
Batang
Batang
Batang
Batang
Batang
KETERANGAN :
DALAM KURUNG = KURANG
11,304.0
3,636.4
3,360.0
623.0
993.3