BALANCE MATERIAL

PROJECT
CLIENT
WORK PACKAGE
PROJECT NO.

:
PROJECT "X"
:
OWNER
: BALANCE MATERIAL
: 5712
0001

(UTK KEBUTUHAN PEKERJAAN PONDASI)

STOCK
NO.

I
1.00
2.00
3.00
4.00
5.00
6.00

DESCRIPTION

Tulangan
8
10
D13
D16
D19
D22

SPEC

BJTP-24
BJTP-24
BJTD-40
BJTD-40
BJTD-40
BJTD-40

VOL

172.00
1,289.00
1,246.00
576.00
204.00
157.00

UNIT

Batang
Batang
Batang
Batang
Batang
Batang

VOL

1,583.00
604.00
665.00
1,131.00
-

UNIT

Batang
Batang
Batang
Batang
Batang
Batang

VOL

14.00
83.00
83.00
24.00
-

UNIT

Batang
Batang
Batang
Batang
Batang
Batang

VOL

6.00
8.00
-

UNIT

Batang
Batang
Batang
Batang
Batang
Batang

VOL

UNIT

2.00
3.00
-

Batang
Batang
Batang
Batang
Batang
Batang

VOL

25.00
59.00
146.00
-

UNIT

Batang
Batang
Batang
Batang
Batang
Batang

PER 24-Jan-2015
6

VOL

UNIT

7.00
9.00
-

Batang
Batang
Batang
Batang
Batang
Batang

VOL

PLUS / MINUS
UNIT

23.00
7.00
-

Batang
Batang
Batang
Batang
Batang
Batang

VOL

172.00
(371.00)
473.00
(318.00)
(951.00)
157.00

UNIT

Batang
Batang
Batang
Batang
Batang
Batang

KETERANGAN :
DALAM KURUNG = KURANG

11,304.0
3,636.4
3,360.0
623.0

993.3