Labour Composite Rate (RS.) Sr. No. Description Unit: Updated For 1st Semi-Annual (July - Dec) 2015

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Government of AJ&K

CSR-2015,Volume-1
Neelum

Updated for 1st Semi-annual (July - Dec) 2015

Sr. No.

Description

Unit

Rate (Rs.)
Labour

Composite

Ref. Tech.
Specs.

22-1

Cutting Ransome or Larson or similar piles.

Per cut

244.00

244.00

22.4 (c )

22-2

Cutting universal piles.

Per cut

366.00

366.00

22.4 (c )

22-3

Driving steel piles above 7.5 m. to 9 m.

Sq.m.

552.15

552.15

22.4 (c )

Sq.ft.

51.30

51.30

Sq.m.

529.00

529.00

Sq.ft.

49.15

49.15

Sq.m.

389.90

389.90

Sq.ft.

36.25

36.25

22-4

22-5

Driving steel piles above 4.50 m. to 7.50 m.

Driving steel piles upto 4.5 m.

22.4 (c )

22.4 (c )

22-6

Dolleying piles.

Each

322.10

322.10

22.4 (c )

22-7

Drilling holes in piles by hand.

Each

33.55

33.55

22.4 (c )

22-8

Raising and lowering machine.

R.M.
R.ft.

9,983.88
3,043.10

9,983.88
3,043.10

22.4 (c )

22-9

Turning machine 90 degrees

Each Job

5,342.52

5,342.52

22.4(c )

22-10

Turning machine 135 degrees

Each Job

6,832.00

6,832.00

22.4(c )

22-11

Turning machine 180 degrees

Each Job

9,198.79

9,198.79

22.4(c )

22-12

Travelling machine (light) in working area.

Per 30 m

10,646.79

10,646.79

22.3

22-13

Loading and/or unloading piles.

Tonne
Ton

296.45
301.20

296.45
301.20

22.3

22-14

Dismantling piling machine.

Each Job

21,315.83

21,315.83

22.4(c )

22-15

Erecting piling machine

Each Job

24,919.48

24,919.48

22.4(c )

22-16

Carriage of piling machine under different conditions in Per 30 m


working area.

4,426.56

4,426.56

22.4(c )

22-17

Hire charges of piling plant with accessories including fuel,


pay of operator and other mechanical staff, mobilization,
demobilization and idle time.

12,810.00

12,810.00

7.3.6.2

22 - 1 (SHEET PILING)

Per day