New K-12 School Facility: April 14, 2010

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 18

New K-12 School Facility

April 14, 2010


Parallel Tracks of Study

• Transformer

• Site

• K-12 Building
K-12 Building Status
• Core Team
• Trimmed Wish List
• ECO – Charrette
• Sustainable Features
• Core Team Design Meetings
• Site Plans
• Floor Plans
• Exterior Elevations

• Public Presentation – 3.24.10


Sustainable Features
Noteworthy Sustainable Features
• Day
Day-lighting
lighting / Lighting Quality
•Daylight responsive lighting, light
shelves,, etc.
• Air Quality
• Dedicated outside air
• Energy Efficiency
• Indivdual classroom heating / cooling
• Occupancy Sensors
• Intelligent
g Building
g Automation Systems
y
• Exceeds Energy Code up to 30%
Sustainable Features
Noteworthy Sustainable Features
• Plumbing Systems
• Low Consumption Water Fixtures
•Up
Up to 30% savings
• Automatic Sensor Operated Fixtures
• High-efficiency water heaters
• Solar-assist hot water pre-heating
• Building Envelope
• High performance walls
• High performance glazing
Sustainable Features
High performance Features Being Considered
• Ground Source Heat Pumps
• Displacement Ventilation System
Sustainable Features
High performance Features Being Considered
• Exterior / Interior Light shelves
Site Overview
Site Overview

• K-12 Building
•Buss / Parent Loops
•Visitor / Staff / Event / Student
P ki
Parking
•Fire Lane
•K-6 Play
a aa
•7-12 Plaza areas
eas
•Sports field
Schematic Site
K-12 Building
Building Overview

• Separate Entries (K-6 & 7-12)


• Building Layout
•Wings (K-6, 7-12)
•Core
Core
•Student Capacity
•Wish
Wish List Prioriti
Prioritized
ed
• Work Sessions Results
1st Floor Plan
2nd Floor Plan
Sports Complex Plan
Modernization Existing
Modernization Existing
Exterior Image
Exterior Image
Thank You!

Thanks!