Professional Documents
Culture Documents
Well Summary (01-01) - English 1
Well Summary (01-01) - English 1
04-28-2014
0.00
TD Date
06-12-2014
0.00
0.00
Project
0.00
From Date
06-10-2014
0.00
To Date
06-10-2014
0.00
0.00
Equipment Cost
0.00
Days on Well
Drilling Days
Rotating / Drilling Hours
0.0 / 0.0
Transport/Packaging
0.00
ppg
8.40
Other Cost
2,977.54
ft
7,227
2,977.54
Planned Cost
0.00
$/bbl
0.00
ft/hr
Average ROP
Maximum Density
Total Measured Depth
True Vertical Depth
ft
7,227
Distance Drilled
ft
Maximum Deviation
$/ft
0.00
ft
$/bbl
0.00
bbl/bbl
0.00
ft
bbl/ft
0.00
120
Casing Design
Description
Top MD
Top TVD
End MD
End TVD
CSG OD
CSG ID
Max. Hole
Hole MD
Hole TVD
in
Size
in
ft
ft
Time
ft
06-09-2014 00:00
Llanos Orientales
ft
ft
ft
7,222
in
7,222
7.000
6.276
9.000
7,222
7,222
PASTINACA_4 ECOPETROL TOP DRILLING CORP TOP DRILLING 1001 WSE API(Copy)
01
Fluid Name
Fresh Water*
Interval
Days
Llanos Orientales
BHT
Max.
Dens
ppg
120
8.30
Fluid Cost
Total
Material
Charges
Not in
Fluid
Total
Charges
Not in
Fluid
Plan
Actual
2,977.54
2,977.54
2,977.54
2,977.54
Variance