a CIVIL WORKS UNITRATES [De Number 16110-co-nncn-00
| ~ Dragades Ge ia DESCRIPTIONS AND METHODS OF
Gouden MEASUREMENT z on foes [35 Jor [10
sag gLS or sei0 KOWCI: WASIE WATER IREATMENT UPUKADE SYSIEM
[cLIENT: SAUDI KAYAN, LOCATION : JUBAIL, KINGDOM OF SAUDI ARABIA,
The unit of measurement will be cubic meter (m’) based on IFC drawings.
These items can be executed as in-situ or precast concrete.
Included in the Unit rate shall be labour, material, equipment for installation of concrete
culverts, according to detail drawings including, but not limited to, the followin:
+ Setting out with suitable survey instruments
+ Pouring the concrete (Grade C35 [35 MPa], min. 400 kgim3 cement, 0,4 max.
ratio wie) up to the required thickness including concrete mix proportioning,
testing, concrete additives & admixtures, placing, compaction and vibration.
‘+ Cement type |, type +6% silica fume (as noted in drawings) according to ASTM
C150.
* Curing
+ Removing surplus and waste material
3.13 Drilling pile
The unit of measurement will be meter (m) based on IFC drawings.
Included in the Unit rate shall be labour, material & equipments required for the installation of
bored cast in situ piles per detail drawings and Geotechnical Report recommendations,
including, but not limited to, the following
+ Setting out with suitable survey instruments
* Casing of bentonite (if required)
* Reinforcement supply and installation including cutting, bending, placing them
in position & protection of rebar projection
* Concrete (Grade C35 [35 MPa], min. 400 kg/m3 cement, 0,4 max. ratio w/c)
mix proportioning, testing, concrete additives & admixtures, placing,
‘compaction and vibration.
+ Cement type I, type 1+6% silica fume (as noted in drawings) according to ASTM
C150.
* Dewatering (if required)peers CIVILWORKS UNITRATES [oe Number servo-conmecv-o0
; DESCRIPTIONS AND METHODS OF
Coentnetoa Ca Lil MEASUREMENT ls 01 foueer [36 for [10
aap frovecr: WASTEWATER TREATMENT UPGRADE SYSTEM
[CLIENT: SAUDI KAYAN ILOCATION : JUBAIL, KINGDOM OF SAUDI ARABIA
* Conducting required tests:
= 1 pile compression load test per pile size and depth prior to the
‘commencement of piling works (they will be executed over testing pies).
= Low-Strain pile integrity tests (according to ASTM D5882) for the 30% of
the working piles.
* Ultrasonic crosshole pile integrity test (according to ASTM 06760) for the
10% of the working piles.
+ Cutoff of piles head
+ Removing surplus and waste material
3.14 Formwork for foundations, sleepers & culverts.
The unit of measurement will be square meter (m?) based net on IFC drawings
Included in the Unit Rate shall be labour, material, equipment for supply and installation of
formwork for single and continuous footings, foundation beams and slabs, pile caps, grade
beams, sleepers, culverts etc... as per detail drawing including the following, but not limited to:
+ Setting out with suitable survey instruments
+ Formwork supply, transportation, placing, protection, spacers, stiffeners, holes,
pockets
+ All mould oil, chamfered edges, etc.
+ Removal of formwork (removal of forms and shores at required date)
+ Removing surplus and waste material
The items for formworks (3.14 through 3.23) shall include:
- _ Falsework, fabrication, erection, centering, levelling and fixing in position, and
taking all measures necessary to produce the required shapes of concrete.
- Scaffolding, and all kind of supporting structures for the formwork, specifically
those for the pedestals and pillars of engines/pumps foundations
- Forming cambers and chamfers.
- Ties an¢ components.
- Linings, release agents, surface retarders or other measures necessayy to
produce the required finish to the surfaces of the concrete.
a
\\n