5ED27E001

ReportNo
Date
ELECTRICAL DEPARTMENT

Erection of Steel Structure Buildings and Material Handling Equipment with Instrumentation and Electrical Works, Onne Port Complex, Port Harcourt, Nigeria

Q.C.INSPECTION REPORT
INSTALLATION AND TESTING OF MOTORS
Package No.

Tag No.

Area / Building

Service

MHE / Granulated Urea

Cable / Dwg. No.

Description

General Report

Model No.

Project Nr. 120.456 / 14.02.2014

Supplied By

FAM

Test Equipment:

MEGGER TESTER

Model or Type

UNI - T UT513

Accuracy
E.I.Motor Data

No.

E.I.Motor Data

No.

Vendor

Full load (R.P.M.)

Serial No.

Frequency (Hz)

Kind of Motor

Rated (kW)

Frame

Full load current (Amps)

Voltage(V)

10

Number of poles

21

Connected

22

12

Cos()

13

16

U1 (W)

18

19

17

Insulation class

RESISTANCE

15

14

24

V2 (W)
W3 (W)
U1 to earth (W)

25

V2 to earth (W)

26

- 100% load

No load current (Amps)


Drive End No.

PROTECT LUBRICANT BEARINGS

11

Non Drive End No.

Type of Grease

Fuse Ratio (Amps)


O/C Setting (Amps)

W3 to earth (W)
BRAKE

20
27
28

Brake Type
Rectifier

Sr. No.

Checked/Inspected Points

Installed/Aligned in correct position

Terminal box, Cables terminals and insulation inspected

Bearing condition inspected (SPM / Vibration monitoring)

Winding resistance and insulation to earth tested

Rotor, Shaft, Winding fan and Covers Inspected

Brakes / Brake parts inspected

Rectifier Inspected

Thermostat operation tested

Idle-runing and/or Full-run test

10

Tag Name plate Correct

11

Paint condition inspected

Sr. No.

Parts Replaced

Yes

No

Remarks

Yes

No

Remarks

Inspection brief:

MWA

LES

OIPL

Sign:

Sign:

Sign:

Name:

Name:

Name:

Date:

Date:

Date: