Professional Documents
Culture Documents
Electrical Department: Q.C.Inspection Report Installation and Testing of Motors
Electrical Department: Q.C.Inspection Report Installation and Testing of Motors
ReportNo
Date
ELECTRICAL DEPARTMENT
Erection of Steel Structure Buildings and Material Handling Equipment with Instrumentation and Electrical Works, Onne Port Complex, Port Harcourt, Nigeria
Q.C.INSPECTION REPORT
INSTALLATION AND TESTING OF MOTORS
Package No.
Tag No.
Area / Building
Service
Description
General Report
Model No.
Supplied By
FAM
Test Equipment:
MEGGER TESTER
Model or Type
UNI - T UT513
Accuracy
E.I.Motor Data
No.
E.I.Motor Data
No.
Vendor
Serial No.
Frequency (Hz)
Kind of Motor
Rated (kW)
Frame
Voltage(V)
10
Number of poles
21
Connected
22
12
Cos()
13
16
U1 (W)
18
19
17
Insulation class
RESISTANCE
15
14
24
V2 (W)
W3 (W)
U1 to earth (W)
25
V2 to earth (W)
26
- 100% load
11
Type of Grease
W3 to earth (W)
BRAKE
20
27
28
Brake Type
Rectifier
Sr. No.
Checked/Inspected Points
Rectifier Inspected
10
11
Sr. No.
Parts Replaced
Yes
No
Remarks
Yes
No
Remarks
Inspection brief:
MWA
LES
OIPL
Sign:
Sign:
Sign:
Name:
Name:
Name:
Date:
Date:
Date: