Donja Ploča Šahta / Manhole Lower Slab Gornja Ploča Šahta / Manhole Upper Slab

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1

3 4R12

3 10R12/15

2 2R12/15

3 4R12

8 6U 6/20

Design was performed by CAD software and hand modifications are not allowed.

ipke - specifikacija
ozn.

oblik i mere
[cm]

vrsta
arm.

lg
[m]

n
[kom]

NAPOMENE / NOTES :

lgn
[m]

9 4U 6/20

AHT S-1 (1 .)

3 13R12/15

RA2

12

2.45

102

249.90

RA2

12

2.05

116

237.80

RA2

12

1.15

108

124.20

RA2

12

2.75

88

242.00

RA2

12

2.25

20

45.00

RA2

12

1.30

7.80

10

10

65
50

9 5U 6/20
1 8R12/15

1. OBAVEZNO PREDVIDETI MESTA PRODORA CEVI KAKO BI SE


IZBEGLA NAKNADNA TEMANJA. / ANTICIPATION OF LOCATIONS OF
PIPING BREAKTROUGHS IS MANDATORY, IN ORDER TO AVOID
SUBSEQUENT DRILLING.

185

2. OBLIK I PRENIK SAME NAVLAKE, KAO I NAIN ZAPTIVANJA


USVOJITI PREMA UPUTSTVU PROIZVOAA (PRENIK JE ZA
CEVOVOD 250mm). / SHAPE AND DIAMETER OF THE PIPE WALL
SLEEVE AS WELL AS SEALING TYPE, SELECT ACCORDING TO THE
MANUFACTURER 'S MANUAL (FOR PIPING DIAMETER 250mm).

225
50
225

INVESTITOR / OWNER:

NAFTNA INDUSTRIJA SRBIJE

110

10

2 11R12/15

10

2 17R12/15

1 2R12/15

7 3R12/15

1 13R12/15

10

10

225

8 5U 6/20

6 3R12/15

3 13R12/15

This document and all technical details contained are exclusive


property of the IMG -engineering&construction and must not be used nor
published without the owner 's written permission.

GORNJA PLOA AHTA / MANHOLE UPPER SLAB

DONJA PLOA AHTA / MANHOLE LOWER SLAB

Ugovor Br. / Job No.: 1692/NP

150

12

1.70

10.20

GA

0.76

11

8.36

GA

0.84

7.56

10

RA2

10

PETROL

PROJECT: PANCEVO OIL REFINERY MODERNIZATION PROJECT


77,000 Nm3/h HYDROGEN GENERATION UNIT

3 4R12
1

3 10R12/15
3 4R12

Pit Manhole MH-3


Formwork & Reinforcement Plan

PRESEK 1-1
R=1:25

8 6/20

7 R12/15

IZVOA / CONTRACTOR:

ipke - rekapitulacija

[mm]

9 6/20
2 4R12

PRESEK 2-2
R=1:25
SECTION 2-2
Sc=1:25

2 4R12

SECTION 1-1
Sc=1:25

lgn
[m]

Jedinina teina
[kg/m']

Teina
[kg]

4 4R12

4 6R12/15

5 4R12/15

5 4R12

2 7R12/15
2 4R12

0.22

3.53

DK-2800 LYNGBY, DENMARK

3.53
Ugovor Br. / Job No.: S-02374

1 R12/15

5 4R12/15

2 R12/15

4 13R12/15

RA2
12
Ukupno

916.90

0.91

835.30
835.30

REV. BR
REV. NO

DATUM
DATE

OPIS
DESCRIPTION

CRT
DRN

OVERIO ODOBRIO
APPD

CHKD

PROJEKTANT DETALJNOG PROJEKTA /


DETAIL ENG. COMPANY:

4 9R12/15

5 R12/15

2 14R12/15

4 R12/15

3 R12/15

Ugovor Br. / Job No.: 2161

PROJEKAT: MODERNIZACIJA RAFINERIJE NAFTE PANEVO


77,000 Nm3/h POSTROJENJE ZA PROIZVODNJU VODONIKA

1 R12/15

2 13R12/15

4 4R12

4 10R12/15

4 4R12
2 R12/15
1

2 4R12

na modifikacija

2 4R12

1 R12/15

2 14R12/15
Projektovanje je vreno na CAD programima, te je zabranjena ru

Ovaj dokument, i svi tehni ki detalji koje on sadr i, su ekskluzivno


vlasnitvo IMG -engineering&construction. i ne mogu se koristiti ili objavljivati
bez njegove pismene saglasnosti .

15.92

LICENCOR / LICENSOR:

Ukupno

3 R12/15

HEURTEY PETROCHEM

Ugovor Br. / Job No.: EF09029

GA

PANCEVO, SERBIA

aht S-3
Plan oplate i armature
PANEVO, SRBIJA
BR. CRTEA / DRAWING NO.

DATUM / DATE

16-12-2011

01692-58-50-2192

NAZIV DOKUMENTA / FILE NAME

01692-58-50-2192-0

RAZMERA / SCALE

1:25

REV.

CRTAO / DRAWN BY

BP

You might also like