Download as pdf or txt
Download as pdf or txt
You are on page 1of 12

RISDA PLANTATION SDN. BHD.

(324822D)

BORANG SEBUTHARGA
LAMPIRAN 1
HARGA BORANG :
Bilangan Dokumen : ..............................

NO. RESIT BAYARAN :

RM 100.00

SEBUTHARGA : MENUAI, ANGKUT DLM & LUAR TSK (OA) KUALA BETIS, GUA MUSANG
(BLOK 1 : 253.3120 HEKTAR)
RISDA PLANTATION SDN. BHD.
NEGERI KELANTAN
NO. 4204, BATU 23, LABOK, JALAN MACHANG KOTA BHARU,
18500 MACHANG, KELANTAN DARUL NAIM.

PELAWAAN SEBUTHARGA UNTUK KERJA / PERKHIDMATAN BAGI PROJEK RISDA PLANTATION.


1.
2.
3.
4.
5.
6.

BIL.

SILA BERIKAN SEBUTHARGA UNTUK KERJA KERJA YANG DITAWARKAN DI BAWAH DENGAN TERTAKLUK KEPADA
SYARAT-SYARAT YANG DITETAPKAN.
LOKASI
: SEPERTI DI LAMPIRAN 2
JENIS KERJA
: SEPERTI DI LAMPIRAN 2 .
TARIKH MULA KERJA / SIAP : 15/03/2016 31/12/2016
SEBUTHARGA MESTILAH SAMPAI KE ALAMAT DI ATAS PADA ATAU SEBELUM PUKUL 12.00 TENGAHARI
PADA : 10/03/2016
SEBUTHARGA MESTILAH DIMASUKKAN KE DALAM SATU SAMPUL SURAT BERMETRI, TENDER NO @ PETI : A

SYARAT-SYARAT KHAS
MEMBEKAL BAHAN-BAHAN DAN SEMUA
PERALATAN YANG DIPERLUKAN
(HARGA INI HENDAKLAH DIMASUKKAN SEKALI
DALAM HARGA YANG DITAWARKAN )
KERJA-KERJA PERKHIDMATAN SEPERTI BERIKUT :SEPERTI DI LAMPIRAN 2

KUANTITI

UNIT

KADAR
(RM)

(Lumpsum)

(Lumpsum)

(Lumpsum)

JUMLAH
(RM)

(RINGGIT MALAYSIA :..............................................................................................................................................................)


SAYA / KAMI DENGAN INI MENAWARKAN UNTUK KERJA / PERKHIDMATAN DI ATAS DENGAN HARGA DAN SYARAT- SYARAT YANG
DITUNJUKKAN DI ATAS.
( /)
KONTRAKTOR BUMIPUTRA
BUKAN BUMIPUTRA

TARIKH :.....................................................................

TANDATANGAN :
KONTRAKTOR
:
ALAMAT PENUH :
NO. TEL

LAMPIRAN 2

CADANGAN MENUAI, ANGKUT DLM & LUAR TSK (OA) KUALA BETIS, GUA MUSANG
( RISDA PLANTATION SDN. BHD. )

BIL.

KETERANGAN / NAMA TSK

KUANTITI

UNIT

KADAR
HARGA
(RM)

JUMLAH
HARGA
(RM)

MENGADAKAN SEMUA TENAGA BURUH, BAHAN-BAHAN, ALAT KELENGKAPAN, INSURAN, PENGANGKUTAN,


MESIN DAN LAIN-LAIN BARANG YANG DIPERLUKAN (HARGA-HARGA INI HENDAKLAH DIMASUKKAN SEKALI
DALAM KERJA YANG DITAWARKAN) UNTUK MEMBUAT KERJA-KERJA BERIKUT :-

BLOK 1 : 253.3120 HEKTAR


MENUAI, ANGKUT DLM & LUAR
1

TUAI

1,055.0500

MT

ANGKUT DALAM

1,055.0500

MT

ANGKUT LUAR

1,055.0500

MT

JUMLAH
MERACUN/PENYELENGGARAAN KAWASAN
1

PUS 1

253.3120

HA

PUS 2

253.3120

HA

PUS 3

253.3120

HA

JUMLAH
MEMBAJA
1

PUS 1

253.3120

HA

PUS 2

253.3120

HA

PUS 3

253.3120

HA

JUMLAH

PEMANGKASAN PELEPAH (PRUNNING)


1

PUS 1

253.3120

HA

PUS 2

253.3120

HA

JUMLAH

(RINGGIT MALAYSIA

: (.................................................................................................................)

Tandatangan

: .............................................................

Nama

: .............................................................

No. k.Pengenalan

: ............................................................. Tarikh :

...............................
Cop Syarikat

LAMPIRAN 3

RISDA PLANTATION SDN. BHD.

PENGURUS,
RISDA PLANTATION SDN. BHD.
NEGERI KELANTAN
NO. 4204, BATU 23, LABOK, JALAN MACHANG KOTA BHARU,
18500 MACHANG, KELANTAN DARUL NAIM.
Tuan,
Pengesahan Lawatan Tapak Kerja

JENIS KERJA

: MENUAI, ANGKUT DLM & LUAR (BLOK 1)

LOKASI

: TSK (OA) KUALA BETIS, GUA MUSANG, KELANTAN

Berhubung dengan kerja-kerja yang ditawarkan di atas adalah disahkan bahawa


Nama : ...........................................................................................................................................
No. Kad Pengenalan
Dari Syarikat

: .................................................................................................................

: .........................................................................................................telah membuat

lawatan ke tapak projek pada

:...................................................

Sekian dimaklumkan.
Disahkan oleh,

....................................
( Pengurus Cawangan )

Tandatangan:..................................
( Pihak Kontraktor )

Catatan : borang ini hendaklah disertakan bersama borang tawaran kerja.

..............................
( Cop Syarikat )

LAMPIRAN 4

MAKLUMAT PENENDER / KONTRAKTOR


1. NAMA PENENDER /
KONTRAKTOR

2. NO PENDAFTARAN (SSM)
3.1 ALAMAT PETENDER

3.2 ALAMAT LAIN (jika ada)

4. NO. TELEFON
5. PEDAFTARAN PETENDER
5 (I)

5 (II)

5 (III)

NO. PENDAFTARAN
DENGAN PUSAT KHIDMAT
KONTRAK (PKK)

KELAS

TARIKH
TAMAT

NO. PENDAFTARAN
DENGAN PUSAT KHIDMAT
KONTRAK (CIDB).

KELAS

TARIKH
TAMAT

NO. PENDAFTARAN
PERNIAGAAN / SYARIKAT/
KOPERASI

SILA SERTAKAN SALINAN BAGI ITEM NO. 5 (I), 5 (II), 5 (III) DIATAS.

TARIKH
TAMAT

NAMA AHLI

ALAMAT

BAHAGIAN MODAL (%)

NO. K/P

KEDUDUKAN DALAM SYARIKAT

6. JUMLAH SIMPANAN BANK


MODAL BERBAYAR

6.1. NAMA BANK & TEMPAT

NO.
AKAUN

*JENIS
AKAUN

6.2. NAMA BANK & TEMPAT

NO.
AKAUN

*JENIS
AKAUN

6.3. NAMA BANK & TEMPAT

NO.
AKAUN

*JENIS
AKAUN

7.

SILA SERTAKAN SALINAN PENYATA BANK 3 BULAN TERAKHIR


KEMUDAHAN KREDIT / PINJAMAN OVERDRAFT

BANYAKNYA
(RM)

BENTUK KEMUDAHAN

INSTITUSI KEWANGAN
& TEMPAT

K. KREDIT
P. PINJAMAN
O-OVERDRAF

SILA SERTA SURAT SOKONGAN ATAU PENGESAHAN DARIPADA PIHAK BERKENAAN.


K KREDIT
P
PINJAMAN
O
OVERDRAF

8.1

PENGALAMAN DENGAN RISDA PLANTATION SDN. BHD.

8.1.1. LOKASI PROJEK


8.1.2. JENIS KERJA
8.1.3. KUANTITI
8.1.4. NO. KONTRAK
8.1.5

NILAI

8.1.6. TARIKH MULA

TARIKH SIAP

8.1.7. KONTRAKTOR UTAMA/


SUBKONTRAKTOR
8.1.8. JIKA SUBKONTRAKTOR
NAMA KONTRAKTOR UTARA
(jika subkontraktor)
SILA SERTAKAN SURAT PENGESAHAN DARI KONTRAKTOR
8.2

PENGALAMAN DENGAN RISDA PLANTATION SDN. BHD.

8.2.1. LOKASI PROJEK


8.2.2. JENIS KERJA
8.2.3. KUANTITI
8.2.4. NO. KONTRAK
8.2.5

NILAI

8.2.6. TARIKH MULA

TARIKH SIAP

8.2.7. KONTRAKTOR UTAMA/


SUBKONTRAKTOR
8.2.8. JIKA SUBKONTRAKTOR
NAMA KONTRAKTOR UTARA
(jika subkontraktor)
SILA SERTAKAN SURAT PENGESAHAN DARI KONTRAKTOR

8.3

PENGALAMAN DENGAN RISDA PLANTATION SDN. BHD.

8.3.1. LOKASI PROJEK


8.3.2. JENIS KERJA
8.3.3. KUANTITI
8.3.4. NO. KONTRAK
8.3.5

NILAI

8.3.6. TARIKH MULA

TARIKH SIAP

8.3.7. KONTRAKTOR UTAMA/


SUBKONTRAKTOR
8.3.8. JIKA SUBKONTRAKTOR
NAMA KONTRAKTOR UTARA
(jika subkontraktor)
SILA SERTAKAN SURAT PENGESAHAN DARI KONTRAKTOR

9.

PENGALAMAN DENGAN LAIN-LAIN JABATAN/ KERAJAAN/ BADAN SWASTA YANG ADA KAITAN
DENGAN TAWARAN INI.

9.1.

NAMA JABATAN / SWASTA


LOKASI KERJA
JENIS KERJA
NILAI
NO. KONTRAK / NO. RUJUKAN
TARIKH MULA
TARIKH SIAP

9.2.

NAMA JABATAN / SWASTA


LOKASI KERJA
JENIS KERJA
NILAI
NO. KONTRAK / NO. RUJUKAN
TARIKH MULA
TARIKH SIAP

9.3.

NAMA JABATAN / SWASTA


LOKASI KERJA
JENIS KERJA
NILAI
NO. KONTRAK / NO. RUJUKAN
TARIKH MULA
TARIKH SIAP

10.

JENIS ALAT KERJA, MESIN, JENTERA DAN KENDERAAN YANG DIMILIKI SENDIRI YANG MASIH
DALAM KEADAAN YANG BOLEH DIGUNAKAN / AKAN DISEWA. SILA SERTAKAN SALINAN GERAN
SAH SEBAGAI PENGESAHAN JIKA KEPUNYAAN SENDIRI.
ALATAN KERJA, MESIN, JENTERA
DAN KENDERAAN

10.1.

ALAT KERJA
(A) PAM PENYEMBUR (SPRAYER)
(B) PAM PENYEMBUR BERINJIN
(POWER SPRAYER)
(C) PAM AIR (WATER PUMP)

10.2.

MESIN
(A) GERGAJI BERANTAI
(CHAIN SAW)
(B) MESIN PEMBANCUH SIMEN
(CONCRETE MIXER)

10.3.

JENTERA
(A) TRAKTOR (TRACTOR)
(B) JENTOLAK (BULLDOZER)
(C) JENGKAUT (EXCAVATOR)

(D) JENTERA PENGGELEK JALAN


(STEAN RIKKER/ROLLER)
(E) PENGAUT / PENGOREK
(BACKHOE)

KUANTITI
(BIL)

SEWA/ SENDIRI
1-SEWA
2-SENDIRI

10.4.

KENDERAAN
(A) LORI BESAR LEBIH 2 TON
(LORRY ABOVE 2 TONNE)
(B) LORI KECIL (SMALL LORRY)

(C) VAN

(D) KERETA
(E) LAND ROVER/ JEEP

10.5.

LAIN-LAIN (Nyatakan)
(A) PEKERJA TEMPATAN

(B) PEKERJA ASING ()

(F) PEKERJA ASING (.)

(G) PEKERJA ASING (.)


(H) LAIN-LAIN

(.)

11.

PENGAKUAN KONTRAKTOR
Bahawa saya / kami mengaku segala maklumat yang dinyatakan adalah betul dan benar belaka.
Saya / kami bersetuju RISDA PLANTATION SDN. BHD. bertindak mengikut budi bicaranya untuk
mengetahui kedudukan sebenar mengenai pengalaman, kemampuan dan kedudukan kewangan
saya/ kami. Saya /kami tidak ada halangan sekiranya RISDA PLANTATION SDN. BHD. Menghubungi
Bank atau agensi atau pihak swasta berkaitan dengan tawaran ini untuk mendapat maklumat/
pengesahan.
Tarikh

Tandatangan

Cop Syarikat

Nama & KP

SAKSI
Tarikh

Tandatangan

Cop Syarikat

Nama & KP

You might also like