Subproject RESC

Activity ID
REARCH 01
REARCH 02
REARCH 03
REARCH 04
REARCH 05
RECONS 01
RECONS 02
RECONS 03
RECONS 04
RECONS 05
RECONS 06
RECONS 07
RECONS 08
RECONS 09
RECONS 10
RECONS 11
RECONS 12
RECONS 13
RECONS 14
RECONS 15
RECONS 16
RECONS 17
RECONS 18
REPLBI 01
REPLBI 02
REPLBE 01
REPLBE 02
REPLBE 03
REPLBG 01
REELEC 01
REELEC 02
REELEC 03

Activity Description
Architectural Planning
RCC Planning & Design
Internal painting
Doors & Windows
Painting
Building Layout
Site Office
Excavation
RCC Footing
RCC column & Plinth Beams
Murrum Filling & Ramming
Floor PCC
1st floor Column
2nd Floor Coiumn
Ground Floor Brickwork
1st floor Brickwork
2nd Floor Brickwork
D&w Frame Fixing
Internal Neeru Plaster
External Sand dash Plaster
Marbonite Flooring & skirting
Kota Flooring & Skirting
Glazed tiling for toilets & kitchen
1' G.I w/c Pipe Laying
1/2" G.I w/c pipe laying
Vitrified Clay sewage pipe laying
Gully /nani trap Fixing
Sewer Inspection Chambers
Green pipe laying
Internal Wiring with Casing
3 Phase Wiring
Genset Installation

Original Duration
5 days
5 days
4 days
1 days
6 days
2 days
2 days
6 days
4 days
8 days
3 days
2 days
6 days
3 days
3 days
4 days
5 days
2 days
5 days
4 days
5 days
7 days
8 days
3 days
2 days
2 days
4 days
2 days
3 days
6 days
3 days
2 days

Internal Road Layout


Curb Painting
Road Signage
Cleaning & Cutting
Rubble filling GSB

3
2
2
3
4

Subproject ROAD
RDARCH 01
RDARCH 02
RDARCH 03
RDCONS 01
RDCONS 02

days
days
days
days
days

RDCONS
RDCONS
RDCONS
RDCONS
RDCONS
RDCONS
RDCONS
RDCONS
RDCONS

03
04
05
06
07
08
09
10
11

WBM (Laying & Rolling )


BMM Laying and Rolling
Wearing Course & Siilcoat
Cross Drainage works clearing
CD Excavations
CD PCC
1m dia. Hume Pipe
CD refilling , ramming ,PCC
Curb laying

6
4
3
8
2
2
1
2
7

days
days
days
days
days
days
days
days
days

Landscaping and Planning


Land Profile marking
Earth Filling and Cutting
Plantation
Site Cleaning

2
6
8
5
4

days
days
days
days
days

Subproject LSCP
LSARCH 01
LSARCH 02
LSCONS 01
LSCONS 02
LSCONS 03

Resource Directory
Resource
Steel
Steel
Steel
Steel
Cement
Cement
Sand
Aggre
Aggre
Gengr
sEng
Helper1
Helper2
Door frames
Door f1

Unit
MT
MT
MT
MT
bags
bags
Brass
Brass
Brass
Nos.
Nos.
Nos.
Nos.
Nos.
Nos.

Descriiption
6 mm
12 mm Torr steel
16 mm Torr steel
25 mm Torr Steel
43 G Birla Cement
53 G Birla Cement
River Sand
20 mm down grade
40 mm down grade
Civil Engineer
Site Engineer
Male Helper
Female Helper
Door Frame 2'
Door Frame 3'

Normal
10
20
25
18
250
600
15
30
30
4
2
30
20
70
150

Max

Cost/Unit
12
19000
22
22000
27
23000
20
23000
275
140
620
145
20
1300
35
1100
35
1200
5
500
3
350
32
120
24
100
76
250
154
300