Culvert Capacity Report REV A
Culvert Capacity Report REV A
CULVERT CAPACITY
MIE-
DOCUMENT NO. :
EAR-MIEIE-C-DRC-0007
IE
PETRONAS
CARIGALI SDN
BHD
MIE
& ENERGY SDN BHD (MIE-IE)
REV INFRASTRUCTURE
ISSUED
DATE
NO.
PREPARED BY
FOR
NAME
A
IFR
18.11.15
SS
SIGN
REVIEWED BY
DATE
NAME
18.11.15
MSI
SIGN
DATE
18.11.15
APPROVED BY
NAME
IR MJM
SIGN
DATE
18.11.1
5
REVIEWED BY
NAME
SIGN
DATE
MIE-IE
PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAS
TERMINAL (SOGT) ELEVATED ACCESS ROAD PROJECT
Document No.
EAR-MIEIE-C-DRC-0007
Document Title.
A (18/11/2015)
Page No.
1 of 4
TABLE OF CONTENT
Section
Page
1.0
Content
INTRODUCTION...............................................2
1.1 PROJECT NAME
2.0
DESIGN CODE...................................................2
3.0
DESIGN CALCULATION......................................2
Attachement
Drawing of Culvert
MIE-IE
PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAS
TERMINAL (SOGT) ELEVATED ACCESS ROAD PROJECT
Document No.
EAR-MIEIE-C-DRC-0007
Document Title.
A (18/11/2015)
Page No.
2 of 4
1.0 INTRODUCTION
1.1 Project Name
Provision For Design & Build Service Of Sabah Oil & Gas Terminal
(SOGT) Elevated Access Road Petronas Carigali
1.2 Project Proponent Details
The owner of the project is:Petronas Carigali Sdn. Bhd.
1.3 Project Engineer Details
The Project Engineer is :Maju Integrated Engineers Sdn. Bhd.
Block No. F, Lot 1 First Floor,
Lintas Jaya Shop Lot,
District of Penampang,
88300 Sabah.
Tel: 088-713 932/ Fax: 088-717 392
2.0
DESIGN CODE
The design reference based on rational calculation.
3.0
DESIGN CALCULATION
MIE-IE
PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAS
TERMINAL (SOGT) ELEVATED ACCESS ROAD PROJECT
Document No.
EAR-MIEIE-C-DRC-0007
Document Title.
A (18/11/2015)
Page No.
3 of 4
MIE-IE
PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAS
TERMINAL (SOGT) ELEVATED ACCESS ROAD PROJECT
Document No.
EAR-MIEIE-C-DRC-0007
Document Title.
A (18/11/2015)
Page No.
4 of 4
MIE-IE
PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAS
TERMINAL (SOGT) ELEVATED ACCESS ROAD PROJECT
Document No.
EAR-MIEIE-C-DRC-0007
Document Title.
A (18/11/2015)
Page No.
5 of 4
MIE-IE
PROVISION OF DESIGN & BUILD SERVICES FOR SABAH OIL & GAS
TERMINAL (SOGT) ELEVATED ACCESS ROAD PROJECT
Document No.
EAR-MIEIE-C-DRC-0007
Document Title.
A (18/11/2015)
Page No.
6 of 4