Professional Documents
Culture Documents
Cashflow
Cashflow
ALIRAN TUNAI PEMBELIAN SATU (1) UNIT TOYOTA HILUX SINGGLE CAB BARU
BAGI CAWANGAN MARANG PK
PERKARA
TAHUN
Kadar
Sewa Perkhidmatan
1. Mengangkut Sawit (Mt/bulan)
2. Mengangkut Getah (Mt/bulan)
3. Lain-lain
Pendapatan
1. Sawit (RM/Mt)
2. Getah (RM/Mt)
3. Lain-lain - bawa pekerja (RM/bulan)
4. Nilai Salvage (RM)
Jumlah
JUMLAH
(RM)
345
4,143
-
4,143
4,143
4,143
4,143
20,714
15
60
77
62,143
921
62,143
921
62,143
921
62,143
921
63,064
63,064
63,064
63,064
62,143
921
5,000
68,064
310,716
4,603
5,000
341,034
12,480
2,496
13,143
16,572
7,200
1,400
835
3,502
647
12,480
2,496
13,143
16,572
7,200
1,400
300
500
500
835
2,627
668
12,480
2,496
13,143
16,572
7,200
1,400
1,000
500
835
2,452
669
12,480
2,496
13,143
16,572
7,200
1,800
300
1,000
500
835
2,101
687
12,480
2,496
13,143
16,572
7,200
1,800
1,000
500
835
1,926
5,000
913
15,615
62,400
12,480
65,714
82,858
36,000
7,800
600
3,500
2,000
4,175
12,609
5,000
3,584
15,615
58,275
58,720
58,746
59,114
63,865
314,335
Lebihan/ Kurangan
(15,615)
4,789
4,344
4,317
3,950
4,199
26,699
Lebihan/ Kurangan
Timbunan
(15,615)
(10,826)
(6,482)
(2,165)
1,785
5,984
Perbelanjaan
1. Kos Pembelian(bayar muka 20%)
2. Ansuran Bulanan - pokok
3. Anduran Bulanan - faedah
4. Gaji & komisyen pemandu
5. Upah Loading
5. Minyak
6. Servis(+minyak pelincir)
6. Bateri
8. Pembaikan
9. Tayar
10. Cukai jalan
11. Insuran
12. Permit/ pemeriksaan
13. Overhoul
14. Kontigensi @ 5%
Jumlah
15,615
LAMPIRAN 1
IRR
12%