Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 2

LAMPIRAN 1

ALIRAN TUNAI PEMBELIAN SATU (1) UNIT TOYOTA HILUX SINGGLE CAB BARU
BAGI CAWANGAN MARANG PK

PERKARA

TAHUN
Kadar

Sewa Perkhidmatan
1. Mengangkut Sawit (Mt/bulan)
2. Mengangkut Getah (Mt/bulan)
3. Lain-lain
Pendapatan
1. Sawit (RM/Mt)
2. Getah (RM/Mt)
3. Lain-lain - bawa pekerja (RM/bulan)
4. Nilai Salvage (RM)
Jumlah

JUMLAH
(RM)

345

4,143
-

4,143

4,143

4,143

4,143

20,714

15
60
77

62,143
921

62,143
921

62,143
921

62,143
921

63,064

63,064

63,064

63,064

62,143
921
5,000
68,064

310,716
4,603
5,000
341,034

12,480
2,496
13,143
16,572
7,200
1,400
835
3,502
647

12,480
2,496
13,143
16,572
7,200
1,400
300
500
500
835
2,627
668

12,480
2,496
13,143
16,572
7,200
1,400
1,000
500
835
2,452
669

12,480
2,496
13,143
16,572
7,200
1,800
300
1,000
500
835
2,101
687

12,480
2,496
13,143
16,572
7,200
1,800
1,000
500
835
1,926
5,000
913

15,615
62,400
12,480
65,714
82,858
36,000
7,800
600
3,500
2,000
4,175
12,609
5,000
3,584

15,615

58,275

58,720

58,746

59,114

63,865

314,335

Lebihan/ Kurangan

(15,615)

4,789

4,344

4,317

3,950

4,199

26,699

Lebihan/ Kurangan
Timbunan

(15,615)

(10,826)

(6,482)

(2,165)

1,785

5,984

Perbelanjaan
1. Kos Pembelian(bayar muka 20%)
2. Ansuran Bulanan - pokok
3. Anduran Bulanan - faedah
4. Gaji & komisyen pemandu
5. Upah Loading
5. Minyak
6. Servis(+minyak pelincir)
6. Bateri
8. Pembaikan
9. Tayar
10. Cukai jalan
11. Insuran
12. Permit/ pemeriksaan
13. Overhoul
14. Kontigensi @ 5%
Jumlah

15,615

* RM 15,615 bayaran permulaan @ 20%


* Sewa perkhidmatan mengikut volume .

LAMPIRAN 1

IRR

12%

You might also like