OWNER'S ESTIMATE

NO.

URAIAN

A.

BIAYA LANGSUNG PERSONIL

B.

BIAYA LANGSUNG NON PERSONIL

JUMLAH
HARGA
(Rp.)

TOTAL

PPN

TOTAL SELURUHNYA

DIBULATKAN

A. BIAYA LANGSUNG PERSONIL

NO.

I.
1.
2.
3.
4.
5.

URAIAN

VOLUME

BIAYA TENAGA AHLI


TL / Project Koordinator (1 Orang)
Ahli Jalan Raya (1 Orang)
Ahli Struktur(1 Orang)
Ahli Geodesi (1 Orang)
Soil & Material Engineer (1 Orang)

1.00
1.00
1.00
1.00
1.00

x
x
x
x
x

2.00
2.00
2.00
2.00
2.00

SATUAN

OB
OB
OB
OB
OB

Sub Total I
II.
1.
2.
3.
4.
5.
6.

BIAYA TENAGA PENDUKUNG


Surveyor (4 Orang)
Tenaga Harian Lokal (12 Orang)
Operator CAD (2 Orang)
Sekretaris / Administrasi (2 Orang)
Operator Komputer (2 Orang)
Office Boy (2 Orang)

HARGA
SATUAN
(RP)

JUMLAH
HARGA
(RP)

4.00
12.00
2.00
2.00
2.00
2.00

x
x
x
x
x
x

2.00
30.00
2.00
2.00
2.00
2.00

OB
OH
OB
OB
OB
OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL (I+II)

B. BIAYA LANGSUNG NON PERSONIL

NO.

I.
2.
3.
4.
5.

URAIAN

VOLUME

BIAYA PERJALANAN / OSA


TL / Project Koordinator (1 Orang)
Highway Engineer (1 Orang)
Geodetic Engineer (1 Orang)
Soil & Material Engineer (1 Orang)

1.00
1.00
1.00
1.00

x
x
x
x

30.00
30.00
20.00
20.00

SATUAN

OH
OH
OH
OH

Sub Total I
II.
1.
2.

BIAYA TRANSPORTASI
Sewa Kendaraan Roda Empat
Sewa Kendaraan Roda Dua

1.00 x
4.00 x

SEWA / BELI ALAT SURVEY


Sewa Camera Digital
Meteran Ukur + Patok
Sewa Theodolite

2.00
2.00

UB
UB

2.00 x
2.00
1.00
2.00 x
2.00

BIAYA OPERASIONAL KANTOR


Sewa Komputer dan Printer
Biaya Komunikasi
ATK dan Fotocopy

UB
Ls
UB

BIAYA PELAPORAN
Laporan Pendahuluan
Laporan Lapangan
Laporan Bulanan
Laporan Antara
Laporan Akhir
Dokumen A3
Gambar Rencana + DVD

3.00
1.00
1.00

x
x
x

2.00
2.00
2.00

UB
Bln
Bln

Sub Total IV
V.
1.
2.
3.
4.
5.
6.
7.

Sub Total III


IV.
1.
2.
3.

JUMLAH
HARGA
(RP)

Sub Total II
III.
1.
2.
3.

HARGA
SATUAN
(RP)

5.00
5.00
5.00
5.00
5.00
5.00
5.00

Set
Set
Set
Set
Set
Set
Set

Sub Total V

TOTAL BIAYA LANGSUNG NON PERSONIL (I+II+III+IV+V)