Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

General notes:

A. GENERAL
A.1 DESIGN CONCEPT
The structure to be built at Lipa City, Batangas a warehouse building with mezzanine. It
has a total floor area of 108 sq. meter with dimensions 9 meters in length (divided into
9days) by 12m in width.
The structure is to be made at steel partially enclosed in non-structural concrete wall
panel. The roof shall be consisted of roof truss system with apex height of 2.0m and shall
be designed using Tee section cut from beam. Elevation from the top of concrete pedestal
to natural grade line should be 1.0m and the depth of footing embedment should be 1.5m.
columns, beams and mezzanine level at 2.4 meter. Column elevation from the top of
concrete pedestal to its highest point should be 11.0m.
Mathematical model-structural drawing showing the 3d schematic diagram and floor plan
of the structure was used in the design analysis and computations. Appendix D.1 provide
the design calculation of wind load.
The Autodesk AutoCAD to 2015 was used to show the 3D schematic diagram of the
structure and to have better structural design of the project.

ENGINEERING ANALYSIS
B.1 Codes and References
The national structural code of the Philippines 2010 (NSCP 2010 volume 1, 6th
Edition) was adopted to design a steel factory building. The following codes specification
were used:

NSCP 2010
Section 203.Combination of loads.
Section 203.3Combinations of loads
Section 204.Table 204-2.Minimum design dead loads (kPa)
Section 205.Table 205-1.Minimum Uniform and concentrated live loads
Section 208.Table 208-1.Seismic importance factor.
Section 208.4.3.3 Table 208-5. Near Source factor Na.
Section 208.4.3.3 Table 208-6. Near Source Factor Nv.

B.2 Material Strengths

Concrete compressive strength/stress


Fc= 28 Mega Pascal (MPa)
Steel Yielding Strength/stress
Fy= 345 Mega Pascal (MPa).

You might also like