DATE:19-08-2015

Hogger take in a line at-12:30pm

Aqc Boiler I/L and O/L damper closed at 2:30pm due to low
temperature
Vacuum dropped -0.85kg/cm2 to o.oo kg/cm2 at 2:32pm

DATE:21-08-2015

Hogger charging started at-8:57am


Vacuum dropped -0.85kg/cm2 to 0.00kg/cm2 at 4:45 due to
bypass damper of Aqc has been opened due to pressurise the
boiler due to leakage found Gasket of safety valve of Hp
header at 4:40 pm
Turbine desync at 4:50 pm
Vacuum dropped -0.72kg/cm2 to 0.00kg/cm2 at 4:53 pm
Hogger line taken at 11:32pm
Ejector taken at 2:15am Hogger cut it at 2:20am vacuum
maintained normally -0.850kg/cm2 upto 4:20am again Hogger
taken at 4:35am
DATE:22-08-2015

Ejector taken in a line 8:35am again Vacuum drop so hogger


taken in a line .Vacuum goes to -0.85 to -0.77 and after hogger
taken in a line -0.86

Due to low kiln temperature


DATE:23-08-2015

Hogger taken into line due to vacuum drop at 1:45 pm and


again hogger cut at 2:30pm
DATE:30-08-2015

Ejector service engineer come,so checking that ejector that

line hogger taken


DATE:3-09-2015

Vacuum dropped o.81kg/cm2 to -0.63kg/cm2 at 9:35pm due to


CST manual doar air leekage and that time turbine tripped due
to problem manually
DATE:12-09-2015

Vacuum hold at -0.61kg/cm2 C Shift-Vacuum hold at


-0.65kg/cm2
DATE:13-09-2015

Vacuum maximum reached upto -0.50kg/cm2 at 2:10pm


DATE:15-09-2015

Vacuum maximum reached upto -0.65kg/cm2


DATE:16-09-2015

Vacuum maintained -0.68kg/cm2 and when ejector taken in line


it goes to -0.72kg/cm2 and after rolling goes to -0.62kg/cm2
DATE:17-09-2015

Vacuum maintained -0.71kg/cm2 and when ejector taken in line


vacuum goes to -0.731kg/cm2
DATE:20-09-2015

Hogger MOV OPEN AT 3:49 PM VACUUM INCREASE UPTO


-0.72Kg/cm2 and than dropped
DATE:21-09-2015

Vacuum goes upto -0.64kg/cm2


DATE:21-09-2015

In august and September when plant running normally and


vacuum dropes we have open ejector inter condenser U-loop
isolation valve for sometime and than vaccum again rise and
maintained If still problems comes hogger has been taken in