C011-SD-03-020-3445 R0 Basement-1 Elev. - 4.40 Beam & Slab Formworks 5-04-15
C011-SD-03-020-3445 R0 Basement-1 Elev. - 4.40 Beam & Slab Formworks 5-04-15
1BM24- 2000x650
1BM24- 2000x650
1BM24- 2000x650
1BM36- 2000x650
1BM5a- 600x600
1BM24- 2000x650
MATCH LINE!!!
1BM5a- 600x600
1B
M1
1BM51- 600x600
T.O.B SSL-5.50
- 40
0x
60
TREN
CH
BEAM
- 300x
TREN
CH
BEAM
- 300x
650
300
650
1BM56- 600x400
TOB SSL-5.75
1BM52- 600x800
T.O.B SSL-5.50
1BM57- 600x400
TOB SSL-5.75
1BM22- 1250x500
T.O.B SSL-5.50
T.O.B SSL-5.50
1BM57- 600x400
TOB SSL-5.75
1BM23- 1000x600
T.O.B SSL-5.50
1BM3- 600x800
T.O.B SSL-5.50
1BM57- 600x400
TOB SSL-5.75
150
1BM57- 600x400
TOB SSL-5.75
1BM8- 500x600
1BM58- 600x400
TOB SSL-5.75
RPB1
1BM57- 600x400
TOB SSL-5.75
(350x
800)
300
300
300
MATCH LINE!!!
NOTES :
SHAFT
300
1BM
38T.O.
2000
B SSL-5
x650
.50
1BM
39-
2000
1BM40- 2000x650
T.O.B SSL-5.50
x650
400
STC1
1BM50- 600x600
T.O.B SSL-5.50
1BM54- 2500x650
T.O.B SSL-6.15
300
1BM54- 2500x650
T.O.B SSL-6.15
COLUMN STUB
1BM54- 2500x650
T.O.B SSL-6.15
LEGEND:
KEY PLAN
MATCH LINE!!!
Safety Advice
NO HEAVY LOADS
CROSS BEAMS
Safety instruction:
NO HEAVY LOADS
CROSS BEAMS
PRIMARY BEAMS
PRIMARY BEAMS
300
MATCH LINE!!!
1
1
REFER
1125
1125
1125
1125
GL1
S1
LH2
300
650
SHAFT
LAUNDRY
CHUTE
SHAFT
FL1
LH4
400
430
500
980
980
980
980
980
H0
400
1200
1200
1200
00
1000 10
420
565
1168
1200
1200
1168
1168
PROPS MODEL
12.04.2015
Checked:
Lanto Jerico
12.04.2015
345-000884-1126
EXTENSION
RANGE
ECO 20 250
ECO 20 300
ECO 20 350
ECO 20 400
EUREX 20 550
152-250 cm
172-300 cm
197-350 cm
227-400 cm
297-550 cm
Rev.: 00
DESIGN CONSULTANT:
ARCHITECTURAL
STRUCTURAL
ELECTROMECHANICAL
SUPERVISION
PROJECT MANAGEMENT
TEL:+974 44 363813-4, 44 360764-5 FAX:+974 44 363812 P.O.B.:5785-QATAR
MZP
SUPERVISED CONSULTANT:
MAIN CONTRACTOR:
P.O.BOX. 24174, DOHA-QATAR TEL:
4688420 FAX: 4684140 www.ecisa.es
SCAFFOLD BOARDS FOR PLATFORMS AND RAILING ARE TO BE PROVIDED BY SITE AND MUST BE FIXED ACCORDING
TO HEALTH & SAFETY REGULATIONS AND LOCAL LAW!
800
DISTANCES BETWEEN BEAMS AND DISTANCES BETWEEN FLOOR PROPS HAVE TO CORRESPOND WITH THE DRAWING.
OVERLAPPING OF THE MAIN BEAM MEASURED FROM THE CENTRE OF THE MAIN BEAM TO THE FLOOR PROPS
WITH TRIPOD MAX. 50 CM.
INTERMEDIATE FLOOR PROPS WITHOUT TRIPOD SHOULD BE PLACED AT EQUAL DISTANCES BETWEEN THE FLOOR
PROPS WITH TRIPOD. THE NUMBER OF INTERMEDIATE FLOOR PROPS HAS TO BE TAKEN FROM THE DRAWING.
USE OF INTERMEDIATE FLOOR PROPS BY COSTUMER: THE DESIGN CONSIDERS PROPS WITH A LOAD CAPACITY
OF 20kN. THE NUMBER OF PROPS HAS TO BE INCREASED IN THE RATIO OF ITS ALLOWABLE LOAD CAPACITY.
ALL INTERMEDIATE FLOOR PROPS HAVE TO BE SECURED
AGAINST TIPPING OVER.
ALL HORIZONTAL FORCES MUST BE BORNE WITH APPLIANCES.
BEFORE PLACING LOADS ON THE SLAB FORMWORK (PLYWOOD,
TIMBER BEAMS, REINFORCEMENT ETC.( INTERMEDIATE FLOOR
PROPS HAVE TO BE PLACED.
450
535
475
TO AVOID RISKS REGARDING HEALTH & SAFETY OF USERS OR THIRD PERSONS, "USER INFORMATION",
"OPERATING INSTRUCTIONS" AND "FITTING INSTRUCTIONS" HAVE TO BE NOTED IN ADDITION TO THE INFORMATION
GIVEN ON THE DRAWINGS.
IF REQUIRED ASK YOUR DOKA PARTNER FOR THESE DOCUMENTS.
450
1200
JL
WB
CHKD APPD
CLIENT:
Drawn:
RA
DWN
SHOP DRAWINGS
Dwg-No.:
m C/C
1200
FOR APPROVAL
00 12.04.15
DESCRIPTION
NO.
DATE
PURPOSE OF ISSUE :
SUB CONTRACTOR:
1200
1200
TABLE HEAD 30
ALL FLOOR PROPS HAVE TO BE PLACED CENTRALLY UNDER THE MAIN BEAMS.
420
420
420
1168
TABLE HEAD 20
Revised:
1088
REVISION :
SHOP DRAWING
350
1280
300
MATCH LINE!!!
1200
800
LEGEND :
/C
/C
1280
1200
1500
MAXIMUM ALLOWABLE
LIVE LOAD:
50mm C
LIMIT OF SLAB
(150mm)SSL-4.40
1500
520
Smax =8
MATCH LINE!!!
860
375
375
200
375
1200
1500
430
1200
300
610
19)
1200
430
50mm C
Smax =6
1200
250
4
-3409~3
1200
1500
350
MATCH LINE!!!
250
1.5
375
1000
375
500
860
1500
1500
430
1000
500
1000
61
1500
520
1500
LH3
-03-020
MATCH LINE!!!
SHAFT
UP
4 BRACING CLAMP B
D
(C011-S
FL2
DN
minimum
400
LH1
650
450
1333
1333
SHAFT
600
UMBER
MATCH LINE!!!
SHAFT
SHAFT
WING N
350
300
150 150
1333
300
450
900
300
300
3 EXTERNAL RAILINGS
4 BRACING CLAMP B
TO DRA
MATCH LINE!!!
900
DRAWING TITLE
3 EXTERNAL RAILINGS
-PROVIDE EXTERNAL RAILINGS,
PIPE OR EQUIVALENT. [BY THE CLIENT]
Rev.
01
01
01
01
01
maximum
(range)
MATCH LINE!!!
300
700
Dwg Ref #
C011-SD-03-020-0076
C011-SD-03-020-0077
C011-SD-03-020-0078
C011-SD-03-020-0079
C011-SD-03-020-0080
REFERENCE DRAWINGS
SCALE 1 : 125A1
EMAIL: qatar@doka.com
PROJECT
JW MARRIOTT HOTEL TOWER
(3B+G+1+M+51)
PIN NO. 61070120 WEST BAY, DOHA, QATAR
HEIGHT: 0+215.30 M.
DRAWING TITLE :
BASEMENT 1, PART - A2
BEAM FORMWORKS @ ELEV. -4.40
DOKAFLEX20 SYSTEM
C011-SD-03-020-3445
DATE
TO PROTECT THE FORMWORK SHEET AGAINST DAMAGING USE VIBRATORS WITH PROTECTIVE CAPS.
REV:
DRAWING NUMBER
12-04-2015
FORMAT SCALE
A1
As Shown
FLOOR
00
00
RA
JL
WB