Professional Documents
Culture Documents
422 C130 FD S 00XX00 001003 F Layout1
422 C130 FD S 00XX00 001003 F Layout1
UNICORP
RECEIVED
15-JULY 2013
NORTH
AK
KA
KEY PLAN
KING ABDULAZIZ
INTERNATIONAL
AIRPORT
PROJECT
LOAD NORTH
CENTRE C
REVISION:
F
E
D
C
B
A
REV.
17/05/2013
28/02/2013
19/12/2012
29/10/2012
15/06/2012
20/03/2012
GC
GC
GC
RR
RR
RR
DATE
DESCRIPTION OF REVISION
(dd/mm/yyyy)
DRAWN BY:
DESIGNED BY:
SU
APP.
CHECKED BY:
KS
APPROVED BY:
RR
ARCH
CIVL
STRC
CDJ
PAVN
ELEC
DATE:
(dd/mm/yyyy)
01/12/2011
MECH
ELTN
DATE
SHEET
REV.
APPROVED AS SUBMITTED
APPROVED WITH IND. CHANGES
DISAPPROVED, RESUBMIT
STRUCTURAL
100% SUBMISSION
17:05:2013
LOAD CENTRE C
COVER SHEET
PROJECT NUMBER
J-10-422-PF-0
SCALE (A0)
NA
DRAWING NUMBER
422-C130-FD-S- 00XX00