ca FEATURE
Preview of National Annex to EC8: f, 1
Seismic Loadings for Peninsular
Malaysia, Sabah and Sarawak
INTRODUCTION
In April 2013, a technical paper entitled, Recommended
Earthquake Loading Model For Peninsular Malaysia
was published in IEM Jurutera, This was followed by a
publication in IStruct Conference 2013 (held in Beijing and
‘Shanghai) under the ttle Earthquake Loading Model in The
Proposed National Annex To Eurocode8 For Peninsular
Malaysia, both of which were presented by Professor
Nelson Lam (refer to Figure 1).
In both papers. the Preliminary Hybrid Seismic
Response Spectrum Model for Peninsular Malaysia was
presented internationally for the first time.
sana Conference 2013 pope
“Farad Ltn Moth rp Nao nest ara fr
eee
arrngua
Nelson Lam
Depron of nascent.
“The Univesity of Mou,
Figure 1: Front cover of Itucté Conference 2013 paper
From the April 2013 IEM workshop on earthquake and
the two technical papers published in 2013, the following
are the key points to note:
1. The use of 2,500-year return period and displacement
based approach for seismic analysis.
2. One unified stendardised seismic response spectrum
model developed for the whole peninsula
3, Twortier site factor approach to account for local
conditions,
In the IEM workshop on "2-day Workshop on
Recommended Earthquake Loading Model in the Proposed
National Annex to Euro Code 8 for Sabah, Sarawak &
32. | JURUTERA Soptomber 2014
bye Prot M,C. Hoo
Updated Model for Peninsular Malaysia", held on 1éth-17th
July, 2014, the’ updated preliminary design spectrum for
Peninsular Malaysia, and a newly established preliminary
design spectrum for Sabah and Sarawak were introduced,
The report gave a brief introduction into the three
response spectra mentioned above, for 2 return period of
2,500 years of seismic wave transmission at bedrock level
PENINSULAR MALAYSIA
For the distant earthquake model, the Uniform Hazard
‘Spectrum (UHS) developed by Papin et al (2011) was,
modulated to incorporate the latest updates of Ground
Motion Prediction Models. For the local earthquake. 2
deterministic design scenario of M6 at R=20km, based on
global hazard model was recommended, reconciling with
the world average of intraplate earthquakes for 2 return
period of 2,500 years,
‘The updated model was revised from the proposed 2013
Design Spectrum Model for Peninsular Malaysia to cater,
for better understanding of local intraplate earthquakes
‘and modulated comer periods. Combining both distant
and local hazards, the updated model was presented in
both displacementbased and force-based formats, and
expressed algebraically. in a manner similar to EC8 peak
‘ground acceleration format.
Figure 2a below is the displacement spectra, and figure
2bis the acceleration spectra, From the figures. up to period
‘of 2s, the spectra is controlled by the local earthquake. after
2s the distant earthquake controls.
‘SARAWAK
With reference to Kuching. Sarawak. earthquakes of
magnitude 3.5Mb to 5.3Mb have occurred within 500
km from Kuching. There are some major faults in the
State, including the Kelwait Fault and Bukit Mesing Fault
Figure 3).
A single unified response spectrum for Sarawak is
recommended. using the same principle as that for the
Updated model for Peninsular Malaysia, such thatthe local
and distant models are regulated using the displacement
format (Figure 4a) end presented both in displacement and
EC8 peak around acceleration format (Figure 4b). As seen
in the figure, the design spectrum for Sarawak is controlled
by the local earthquakes.FEATURE =
Ue er cauetanmqaten Tm Sty
oor = vem
etn rar RS) cea
006| — ——Dscenee eat
sesso Feteamat pres 70)
06s:
RSO(m)
oo
003}
02:
oor
os i 15 2 23 3 ss 8 aS 8
i)
Registore in
cdl PO
CHNT 32
HINT ELECTRIC.
‘THEBIGGESTLY COMPONENTS MANUFACTURER IN
(CHINA AND REGISTERED UNDER SHANGHAI STOCK
‘EXGHANGE (REG: 60187)
Figure 2a: Displacement format of Design Spectrum mode! fr Peninsular Molaysia
vette)
—0= Devan tere 8 8) ca entne
—Darscenee nat
sceeeFet ene pte TC)
Scone cere 20081)
>) Ue sauces ma ty)
0 oS 1 45 2 25 3 35 4 45
To)
‘Figure 2: ECB pk ground ecceleration format Deion Specrum model or Penis Malaysia
Local seismicity and distance reference to Kuching Sarawak
errr rs
Pee eC EL TS
area
paren set rer
Prenat
Figure 3: Kuching Reference Distance fo aut zones
SABAH
Since Sabeh is very near highly volatile, earthquake-prone countries
‘such as Indonesia anc Philippines, the chances of an earthquake happening
there cannot be taken lightly or overruled. In the past, earthquakes of
‘magnitude greater tha 5 have been recorded at a distance of approximately
‘36 MONTH
uy sertoganns Powe satin east
@ ‘We Do Quality
‘A Leading Global
ASTRONERGY Manulnctorer
Mml--9
settee wera & cele
omar ce Cray @ &6
TDK,
Power Factor Correction
— =saDa
Aart
[ALPHA AUTOMATION (SEL) SDN BHD|
(Reg, :372711-D)
ALPHA CHINT SWITCHES SDN BHD.
okeg 9821757)
5 Jsan Peer 1149, Temasys Indi Prk,
[Gienmasie, 40150 Shah Alam, Selangor, Malays
Tel 2608-3569 398 Fax “605-5569 4099
Eat strato "Nese dp com
‘Sepiomber 2014 JURUTERA | 33Precast Half Slab
Hollow Core Slab Precast Beam
Seles & Marketing Ofc:
reer Wama Chinese Chamber
25k Jon Apa,
50480 Kea Lumpur
iu $80.0) 4251 0236
Pex :4600)42510309
Wsbste sant arecsstoe com my
Emel enquten@precaspab com my
yasan Pesndutien
Senawang
bon Neger Serbian, Malaysia
#80 (6) 678 10370233,
$80 (6678 6257
‘onguries@precasipsb com my
34 | JURUTERA September 2014
1100km from Sabah (Figure 5). Hence @ unified design model for the whole
of Sabah was recommended (Figure 6a/b), similar to that for Peninsular
Melaysia and Sarawak.
PRELIMINARY COSTING
Preliminary structural cost implication due to the proposed Hybrid Design
‘Spectrum was carried out on structures of rigid-jointed frame for T-storey and
S5-storey buildings, shear wallframe for 10-storey and cored-wall for 30-storey
buildings.
3 7 2 3 eas
1)
Figure 49; Displacement fama of Design Spectrum model for Sarawak
agrees MOD alae
Dretace ome
9)
‘Figure 40: EC8 peak ground acceleration format Design Spectum model or Sarawak
Refer to the IEM "2-day Workshop on Recommended Earthquake Loading
‘Model in the Proposed National Annex to Euro Code 8 for Sabah, Sarawak &
Updated Mode! for Peninsular Malaysia’. 16th-17th July, 2014 lecture notes
for further details in the costing
lowe 8: Sabah Reference Distanco to faut zonesSrepresemre ae Ristenmente
8)
‘Figure 6a: Displacement format of Design Spectrum moda for Sabah
Figure 6b: £08 peak ground acceleration format Design Specrum model
for Sabah
RECOMMENDATION
‘The recommended earthquake design spectrums presented
atthe workshop are as summarised below in Table 1
Table 1. Parameters for Hybrid Design “Spectrum for
P. Malaysia, Sabah, Sarawak
Figure 7: Preliminary structural costnerease (exluaing foundation)
Se Merci)
Unit
Nn
ete
Sabah
FEATURE pea
Refer to the IEM “2-day Workshop on Recommended
Earthquake Loading Model in the Proposed National Annex
to Euro Code 8 for Sabah, Sarawak & Updated Model for
Peninsular Malaysia’. 16th-17th July, 2014 lecture notes for
further details.
CONCLUSION
itcan be concluded that
Hybrid Design Response Spectrum for Peninsular Malaysia
is @ combination of short and long distant earthquake with
‘@ peak ground acceleration of 0.19 for a return period of
2,500 years at bedrock level
1. Hybrid Design Response Spectrum for Sarawak is
dominated by local earthquake with a peak ground
acceleration of 0.1g for a return period of 2,500 years
at bedrock level.
2. Hybrid Design Response Spectrum for Sabah is
dominated by long distant earthquake with a peak
{ground acceleration of 0.189 for a return period of 2.500
years at bedrock level
3. Preliminary structural cost increase (excluding
foundation) is only 3.4% for a 10-storey building. mt
1 Prot. MC. Hee is a member of IEM TechnicalGommitee on
Wrking Group 1 Chaiman, Study on Peak Ground Accolration and
Response Spectrum for Malaysia,
eer
Pees)
nee
Insttusi mengueapkan terra asi kepada cemus yang telbh memberitan
‘sumbangan epadatabungSanguran Wisma IEM. Ani IEM dan pembaea ana
Ingn membertan sumbangon boih berbuat demkian dengan emus tun
‘orang aan we EM hp /wwwiemoremy atau menghubung secetaiat
44503-7968 4001/5518 uu mtlum a nt Senaripenyumang untuk buon
September 2014 aaah seprd aul dl bavah
September 2014 JURUTERA | 35