Construction of 1200 (150 Blocks) Family Flats Phase-I (Package-I) at Regi Lalma, Peshawar Septic Tank Foundation Bar Bending Schedule

You might also like

Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 16

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR

Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No
A

Description

Dia

C/C

Mark

No.of Bars

T.Nos

7''

149

149

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

RAFT

2.5"
1 Main bar

3/8''

21.25

3166.25

20'-10''
85'-10''

2.5"
2 Dist. bar

3/8''

8''

32

32

86.25

2760.00

3/8''

8''

32

64

1.67

106.88

3 Top Short bars

3/8''

6''

39

78

7.92

617.76

7'-6''

2.5"

4 Top Long bars

3/8''

7''

14

28

21.25

595.00

20'-10''

2.5"

1/2''

8''

29

58

8.41

487.78

3/8''

6''

13

26

23.17

602.42

Over Lap

1'-8''

B Partition Wall-1

1 Vertical Dowel

1'-8'' 6'-9''
1'-8''

H-Bars

19'-10''

C Columns

6''
3'-1''
1 Vertical Dowel

5/8''

12

5.25

63.00

1'-8''

2 Vertical Dowel

1/2''

12

5.25

63.00

1'-8'' 3'-1''

6''

Rings

3''
1'-9''

6''

3/8''

4''

10

20

5.00

100.00

1 Short side Vertical Dowel

1/2''

8''

30

120

9.41

1129.20

2 H-Bars

3/8''

6''

15

60

23.17

1390.20

3 Long side Vertical Dowel

1/2''

8''

129

516

9.41

4855.56

8'-6'' 1'-8''
1'-8''

4 H-Bars

3/8''

6''

15

60

88.17

5290.20

84'-10''

3/8''

8''

15

120

1.67

200.40

#8

#7

#6

#5

D External Walls

7'-9''
1'-8''
1'-8''

19'-10''
7'-9''

Over Lap

Dia.

#4

#3

Grand Total Length (Rft)

63.000

6,535.540

14,829.110

Weight (Kg/Rft)

0.4725

0.3024

0.1701

Total Weight (Kgs)

29.768

1,976.347

2,522.432

Weight in M.Ton For One Septic Tank:-

______________________

1'-8''
Total Weight

4,528.546
4.5285

_________________________________

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

KGL Representative

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

JV CIV-TECH & EPAC Representative

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

9"

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No
A

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

RAFT

2.5"
1 Main bar

3/8''

7''

149

149

21.25

3166.25

20'-10''

2 Dist. bar

3/8''

8''

32

32

86.25

2760.00

85'-10''

3/8''

8''

32

64

1.67

106.88

3/8''

6''

39

39

7.92

308.88

7'-6''

2.5"

3/8''

6''

7.92

63.36

7'-6''

2.5"

3/8''

7''

14

14

21.25

297.50

20'-10''

2.5"

3/8''

7''

3.00

24.00

1/2''

8''

29

58

8.41

487.78

3/8''

6''

13

26

23.17

602.42

2.5"

Over Lap

3 Top Short bars


Top Short bars
(Under Column)

4 Top Long bars

Top Long bars (U/Cols)

1'-8''

3'-0''

B Partition Wall-1

1 Vertical Dowel

1'-8'' 6'-9''
1'-8''

H-Bars

19'-10''

C Columns

6''
3'-1''
1 Vertical Dowel

5/8''

12

5.25

1'-8''

63.00

6''
2 Vertical Dowel

Rings

1/2''

12

5.25

63.00

1'-8'' 3'-1''
3''
1'-9''

6''

3/8''

4''

10

20

5.00

100.00

1 Short side Vertical Dowel 1/2''

8''

30

120

9.41

1129.20

2 H-Bars

3/8''

6''

15

60

23.17

1390.20

3 Long side Vertical Dowel

1/2''

8''

129

516

9.41

4855.56

8'-6'' 1'-8''
1'-8''

4 H-Bars

3/8''

6''

15

60

88.17

5290.20

84'-10''

3/8''

8''

15

120

1.67

200.40

#8

#7

#6

#5

D External Walls

7'-9''
1'-8''
1'-8''

19'-10''
7'-9''

Over Lap

Dia.

#4

#3

Grand Total Length (Rft)

63.000

6,535.540

14,310.090

Weight (Kg/Rft)

0.4725

0.3024

0.1701

Total Weight (Kgs)

29.768

1,976.347

2,434.146

Weight in M.Ton For One Septic Tank:-

1'-8''
Total Weight

4,440.261
4.4403

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

FOUNDATION BAR BENDING SCHEDULE


S.No

Description

______________________
KGL Representative

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

_________________________________
JV CIV-TECH & EPAC Representative

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

BEAM

4"
1 Bottom Bars

5/8''

20.5

82.00

19'-10''

2 Top Bars

1/2''

20.50

41.00

19'-10''

Rings

3/8''

9''

26

26

3.50

91.00

3''
1'-0'

4"

6''

B Partition Wall-1

4''
1 Vertical Dowel

1/2''

8''

29

58

6.58

381.64

3/8''

6''

11

22

23.17

509.74

1'-8''
H-Bars

6'-3''

19'-10''

C Partition Wall-2

4'' 10'-9''
Vertical Dowel

1/2''

8''

29

58

11.42

662.36

H-Bars

3/8''

6''

19

38

23.17

880.46

1'-8''

19'-10''

D External Walls

4'' 7'-8''
1 Short side Vertical Dowel 1/2''

8''

29

116

8.00

928.00

1'-8''

19'-10''

2 H-Bars

3/8''

6''

10

40

23.17

926.80

3 Long side Vertical Dowel

1/2''

8''

129

516

8.00

4128.00

8'-6'' 1'-8''
1'-8''

4 H-Bars

3/8''

6''

10

40

88.17

3526.80

84'-10''

3/8''

8''

10

80

1.67

133.60

#8

#7

#6

#5

7'-9''

Over Lap

Dia.

#4

#3

Grand Total Length (Rft)

82.000

6,141.000

6,068.400

Weight (Kg/Rft)

0.4725

0.3024

0.1701

Total Weight (Kgs)

38.745

1,857.038

1,032.235

Weight in M.Ton For One Septic Tank:-

1'-8''

Total Weight

2,928.018
2.9280

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

______________________
KGL Representative

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

_________________________________
JV CIV-TECH & EPAC Representative

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR
Level #:

SEPTIC TANK

Page #:

01/01

BEAM & WALLS BAR BENDING SCHEDULE


S.No

Description

Dia

C/C

Mark

No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

Shape of the Bar

9"

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHA
Level #:

SEPTIC TANK

Page #:

SLAB BAR BENDING SCHEDULE


S.No

Description

Mark No.of Bars

T.Nos

Cut Length
(Rft)

Total Length

Dia

C/C

(Rft)

1 Main bar (L/4)

1/2''

4''

255

255

19.92

5079.60

2 Dist. bar

1/2''

6''

39

39

84.92

3311.88

3 Over Lap

1/2''

6''

39

78

1.67

130.26

5 Long side

1/2''

6''

10

20

84.83

1696.60

6 Short side

1/2''

6''

14

28

19.83

555.24

1 L-Bars

1/2''

6''

16

48

3.83

183.84

2 O-Bars

1/2''

6''

12

9.92

119.04

#8

#7

#6

#5

SLAB

4 Dist. bar under bent up

B Man Hole

Dia.
Grand Total Length (Rft)
Weight (Kg/Rft)
Total Weight (Kgs)

Weight in M.Ton For One Septic Tank:-

#4
-

0.4725
-

11,076.46
0.3024
3,349.522

#3
0.1701
-

CONSTRUCTION OF 1200 (150 BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHA
Level #:

SEPTIC TANK

Page #:

SLAB BAR BENDING SCHEDULE


S.No

Description

______________________
KGL Representative

Dia

C/C

Mark No.of Bars

T.Nos

Cut Length
(Rft)

Total Length
(Rft)

_____________________________
JV CIV-TECH & EPAC Represen

BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR


01/01
SLAB BAR BENDING SCHEDULE
Shape of the Bar

6"

5'-2"

14'-2''
6"

6'-11"

77'-6''

1'-8''

84'-10''

19'-10''

1'-10''
2'

3''

3'dia

8'-6''
Total Weight

3,349.522
3.3495

BLOCKS) FAMILY FLATS PHASE-I (PACKAGE-I) AT REGI LALMA, PESHAWAR


01/01
SLAB BAR BENDING SCHEDULE
Shape of the Bar

_________________________________
JV CIV-TECH & EPAC Representative

You might also like