List Drawing, The NEW

You might also like

Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 92

Location :

Desa Kubu Kandang Kecamatan Pemayung


Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0

A. EARTH WORK
B. MECHANICAL
I. ARRANGEMENT
(07/02/15)

SITE PLAN

HAL-ARR-MH01

1 : 2500

For Approval

(07/02/15)

MILL LAYOUT

HAL-ARR-MH02

1 : 850

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0
(23/02/15)

MACHINARY LAYOUT (1/3)

HAL-ARR-MH03

1 : 800

For Approval
(23/02/15)

MACHINARY LAYOUT (2/3)

HAL-ARR-MH03

1 : 800

For Approval
(23/02/15)

LIST KODE DAN KETERANGAN MESIN-MESIN (3/3)

HAL-ARR-MH03

AS SHOWN

For approval

II. FRUIT RECEIPTION STATION


(23/02/15)
1 ARRANGEMENT OF FRUIT BUNCH RECEPTION (1/2)

HAL-FRS-MH01

1 : 250

For Approval
(23/02/15)

2 ELEVATION OF FRUIT BUNCH RECEPTION (2/2)

HAL-FRS-MH01

1 : 130

For Approval
(23/02/15)

3 DETAIL & SECTION OF LOADING RAMP (1 /4)

HAL-FRS-MH02

AS SHOWN

For Approval
(23/02/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0

4 DETAIL & SECTION OF LOADING RAMP (2 /4)

HAL-FRS-MH02

AS SHOWN

For Approval
(23/02/15)

5 DETAIL & SECTION OF LOADING RAMP (3/ 4)

HAL-FRS-MH02

AS SHOWN

For Approval
(23/02/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0

6 DETAIL & SECTION OF LOADING RAMP (4/4)

HAL-FRS-MH02

AS SHOWN

For Approval
(23/02/15)

7 DETAIL OF GUIDE BOLLARD (1 / 2)

HAL-FRS-MH03

AS SHOWN

For Approval
(23/02/15)

8 DETAIL OF GUIDE BOLLARD (2 /2)

HAL-FRS-MH03

AS SHOWN

For Approval
(23/02/15)

9 DETAIL OF WINCH DRUM (1 /2)

HAL-FRS-MH04

AS SHOWN

For Approval
(23/02/15)

10 DETAIL OF WINCH DRUM (2/ 2)

HAL-FRS-MH04

AS SHOWN

For Approval
(23/02/15)

11 DETAIL OF 7.5 TON CAGE AND BOGIES (1 /2)

HAL-FRS-MH05

AS SHOWN

For Approval
(23/02/15)

12 DETAIL OF 7.5 TON CAGE AND BOGIES (2 /2)

HAL-FRS-MH05

AS SHOWN

For Approval
(23/02/15)

13 DETAIL OF TRANSFER CARRIAGE (1 /3)

HAL-FRS-MH06

AS SHOWN

For Approval
(23/02/15)

14 DETAIL OF TRANSFER CARRIAGE (2/3)

HAL-FRS-MH06

AS SHOWN

For Approval
(23/02/15)

15 DETAIL OF TRANSFER CARRIAGE (3/ 3)

HAL-FRS-MH06

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(23/02/15)

16 DETAIL OF RAIL TRACK

HAL-FRS-MH07

AS SHOWN

For Approval

III. STERILIZER STATION


(23/02/15)
1 ARRANGEMENT STERILIZER STATION (1/2)

HAL-STR-MH01

1 : 130

For Approval
(23/02/15)

2 ELEVATION OF STERILIZER STATION (2/2)

HAL-STR-MH01

1 :120

For Approval
(23/02/15)

3 DETAIL OF STERILIZER DIA. 2700 O/D (1/2)

HAL-STR-MH02

AS SHOWN

For Approval
(23/02/15)

4 DETAIL OF STERILIZER DIA. 2700 O/D (2/2)

HAL-STR-MH02

AS SHOWN

For Approval
(23/02/15)

5 DETAIL OF BLOW DOWN & BLOW OFF SILINCER

HAL-STR-MH03

AS SHOWN

For Approval
(23/02/15)

6 DETAIL OF MOBILE RAIL BRIDGE

HAL-STR-MH04

AS SHOWN

For Approval
(27/03/15)

7 DETAIL OF CONDESAT PIT

HAL-STR-MH05

AS SHOWN

For Approval
(23/02/15)

8 DETAIL OF STERILIZER CAT WALK

HAL-STR-MH06

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0

IV. THRESHING STATION


(23/02/15)
1 ARRANGEMENT FROM TIPLER TO THREASHER (1/3)

HAL-TRS-MH01

1 : 100

For Approval
(23/02/15)

2 ARRANGEMENT FROM TIPLER TO THREASHER (2/3)

HAL-TRS-MH01

1 : 100

For Approval
(23/02/15)

3 ARRANGEMENT FROM TIPLER TO THREASHER (3/3)

HAL-TRS-MH01

1 : 100

For Approval
(27/03/15)

4 DETAILS OF TIPPLER (1/2)

HAL-TRS-MH02

AS SHOWN

For Approval
(27/03/15)

5 DETAILS OF TIPPLER (2/2)

HAL-TRS-MH02

AS SHOWN

For Approval
(27/03/15)

6 DETAIL OF THRESHING DRUM (1/5)

HAL-TRS-MH03

AS SHOWN

For Approval
(27/03/15)

7 DETAIL OF THRESHER DRUM (2/5)

HAL-TRS-MH03

AS SHOWN

For Approval
(27/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0

8 DETAIL OF STRUCTURE & PLATFORM THRESHING (3/5)

HAL-TRS-MH03

AS SHOWN

For Approval
(27/03/15)

9 DETAIL OF STRUCTURE & PLATFORM THRESHING (4/5)

HAL-TRS-MH03

AS SHOWN

For Approval
(27/03/15)

10 DETAIL OF STRUCTURE & PLATFORM THRESHING (5/5)

HAL-TRS-MH03

AS SHOWN

For Approval
(12/03/15)

11 DETAIL OF 600 UNDER THRESHER CONVEYOR (1/1)

HAL-TRS-MH04

AS SHOWN

For Approval
(12/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0

12 DETAIL OF 600 UNDER CROSS CONVEYOR (1/2)

HAL-TRS-MH05

AS SHOWN

For Approval
(12/03/15)

13 DETAIL OF 600 UNDER CROSS CONVEYOR (2/2)

HAL-TRS-MH05

AS SHOWN

For Approval
(12/03/15)

14 DETAIL OF 600 FRUIT DISTRIBUTING CONVEYOR (1/2)

HAL-TRS-MH06

AS SHOWN

For Approval
(12/03/15)

15 DETAIL OF 600 FRUIT DISTRIBUTING CONVEYOR (2/2)

HAL-TRS-MH06

AS SHOWN

For Approval
(12/03/15)

16 DETAIL OF STERILIZER FRUIT BUNCH (SFB) CONVEYOR (1/3)

HAL-TRS-MH07

AS SHOWN

For Approval
(27/03/15)

17 STRUCTURE & FLATFORM (SFB) CONVEYOR (2/3)

HAL-TRS-MH07

AS SHOWN

For Approval
(27/03/15)

18 STRUCTURE & FLATFORM (SFB) CONVEYOR (3/3)

HAL-TRS-MH07

AS SHOWN

For Approval
(27/03/15)

19 CHUTE PENGUTIP BRONDOLAN

HAL-TRS-MH08

AS SHOWN

For Approval

V. EMPTY BUNCH STATION


(09/04/15)
1 ARRANGEMENT OF EMPTY BUNCH STATION (1/3)

HAL-EFB-MH01

1 :230

For approval
(09/04/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0

2 ARRANGEMENT OF EMPTY BUNCH STATION (2/3)

HAL-EFB-MH01

3 DETAIL SUPPORT EFB CONVEYOR (3/3)

HAL-EFB-MH01

4 DETAIL E.F.B PRESS & SHREDDER STRUCTURE (1/3)

HAL-EFB-MH02

1 :150

For approval
(29/04/15)
E.F.B station tidak
pending
(09/04/15)

AS SHOWN

For approval
(09/04/15)

5 DETAIL E.F.B PRESS & SHREDDER STRUCTURE (2/3)

HAL-EFB-MH02

AS SHOWN

For approval
(09/04/15)

DETAIL FOUNDATION E.F.B PRESS & SHREDDER STRUCTURE


(3/3)

HAL-EFB-MH02

AS SHOWN

For approval
(23/02/15)

7 DETAIL OF INCLINED EFB CONVEYOR

HAL-EFB-MH03

AS SHOWN

For approval
(23/02/15)

8 DETAIL 0F EFB CONVEYOR NO.1, NO.2, & NO.3

HAL-EFB-MH04

AS SHOWN

For approval
(22/02/15)

9 DETAIL OF EFB OIL TANK

HAL-EFB-MH05

AS SHOWN

For approval

VI. PRESS & DEPERICARPER STATION


(23/02/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0

1 ARRANGEMENT PRESS STATION TO DEPRICARPER STATION

HAL-PRS-MH01

1 : 170

For Approval
(23/02/15)

2 DETAIL OF PRESS STRUCTURE (1 / 2)

HAL-PRS-MH02

AS SHOWN

For Approval
(23/02/15)

3 DETAIL OF PRESS STRUCTURE (2 /2)

HAL-PRS-MH02

AS SHOWN

For Approval
(23/03/15)

4 DETAIL OF FRUIT ELEVATOR (1 /2)

HAL-PRS-MH03

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(23/02/15)

5 DETAIL OF FRUIT ELEVATOR (2/ 2)

HAL-PRS-MH03

AS SHOWN

For Approval
(12/03/15)

6 DETAIL OF 800 CAKE BREAKER CONVEYOR NO.1

HAL-PRS-MH04

AS SHOWN

For Approval
(12/03/15)

7 DETAIL OF 800 CAKE BREAKER CONVEYOR NO.2

HAL-PRS-MH05

AS SHOWN

For Approval
(26/03/15)

8 DETAIL SUPPORT & PLATFORM CBC NO.2 (1/2)

HAL-PRS-MH06

AS SHOWN

For Approval
(26/03/15)

9 DETAIL SUPPORT & PLATFORM CBC NO.2 (2/2)

HAL-PRS-MH06

AS SHOWN

For Approval
(23/02/15)

10 PNEUMATIC DEPERICARPER

HAL-PRS-MH07

AS SHOWN

For Approval
(23/03/15)

11 CRUDE OIL TANK (15m)

HAL-PRS-MH08

1 : 25

For Approval
(21/03/15)

12 DETAILS OF SANDTRAP TANK

HAL-PRS-MH09

1 : 25

For Approval
(12/03/15)

13 DETAILS OF VIBRATING SCREEN PLATFORM & BUFFER TANK

HAL-PRS-MH10

AS SHOWN

For Approval
(27/03/15)

14 DETAILS OF NUT PULISHING DRUM

HAL-PRS-MH11

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0
(27/03/15)

15 ELEVATION OF FIBRE TRANSPORT DUCTING

HAL-PRS-MH12

1 : 170

For Approval
(26/03/15)

16 DETAIL OF FIBER TRANSPORT DUCTING

HAL-PRS-MH12

AS SHOWN

For Approval
(08/04/15)

17 PNEUMATIC AIR TRANSPORT CONTROLER

HAL-PRS-MH13

AS SHOWN

For Approval
(22/03/15)

18 DETAIL OF FIBRE CYCLONE

HAL-PRS-MH14

AS SHOWN

For Approval
(22/03/15)

19 DETAIL AIRLOCK FIBRE CYC LONE

HAL-PRS-MH15

AS SHOWN

For Approval
(22/03/15)

20 DEATIL OF FIBRE CYCLONE STUCTURE (1/2)

HAL-PRS-MH16

AS SHOWN

For Approval

(22/03/15)

21 DEATIL OF FIBRE CYCLONE STUCTURE (2/2)

HAL-PRS-MH16

AS SHOWN

For Approval

(25/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0

22 DETAIL OF NUT AUGERCONVEYOR

HAL-PRS-MH17

AS SHOWN

For Approval

VI. CLARIFICATION STATION


(23/02/15)

1 ARRANGEMENT OF CLARIFICATION STATION (1/ 3)

HAL-CST-MH01

1 : 110

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0
(23/02/15)

2 ARRANGEMENT OF CLARIFICATION STATION (2/ 3)

HAL-CST-MH01

1 : 110

For Approval

(23/02/15)

3 ARRANGEMENT OF CLARIFICATION STATION (3/ 3)

HAL-CST-MH01

1 : 110

For Approval

(27/03/15)
4 DETAIL OF CLARIFICATION STRUCTURE (1/ 2)

HAL-CST-MH02

AS SHOWN

For Approval
(27/03/15)

5 DETAIL OF CLARIFICATION STRUCTURE (2 /2)

HAL-CST-MH02

AS SHOWN

For Approval
(12/03/15)

6 DETAIL COUNTINUOS SETLLING TANK CAP. 120 M (1/3)

HAL-CST-MH03

1 : 65

For Approval
(22/03/15)

7 DETAIL COUNTINUOS SETLLING TANK CAP. 120 M (2/3)

HAL-CST-MH03

AS SHOWN

For Approval
(22/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0

8 DETAIL COUNTINUOS SETLLING TANK CAP. 120 M (3/3)

HAL-CST-MH03

AS SHOWN

For Approval
(23/02/15)

9 DETAIL OF SLUDGE TANK CAP. 48 M

HAL-CST-MH04

AS SHOWN

For Approval
(12/02/15)

10 DETAIL OF PURE OIL TANK CAP. 27 M (2 UNIT)

HAL-CST-MH05

AS SHOWN

For Approval
(12/03/15)

11 DETAIL OF SLUDGE BUFFER TANK CAP. 10 M

HAL-CST-MH06

AS SHOWN

For Approval
(27/03/15)

12 DETAIL OF RECLAIMED OIL TANK & SLUDGE DRAIN TANK

HAL-CST-MH07

AS SHOWN

For Approval
(12/03/15)

13 DETAIL OF HOT WELL TANK

HAL-CST-MH08

1 : 20

For Approval
(13/03/15)
For Approval
(27/05/15)

15 HOT WATER TANK 10 M

HAL-CST-MH09

1 : 25

15 DETAIL OF STATIC FEED TANK

HAL-CST-MH10

AS SHOWN

For Approval
(13/04/15)

16 DETAIL OF SLUDGE PIT

VII. OIL STORAGE STATION

HAL-CST-MH11

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0
(27/03/15)

1 ARRANGEMENT OIL STORAGE STATION

HAL-OST-MH01

AS SHOWN

For Approval
(27/03/15)

2 DETAIL OF OIL STORAGE TANK CAP. 1500 M TONS (1/3)

HAL-OST-MH02

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(27/03/15)

3 DETAIL OF OIL STORAGE TANK CAP. 1500 M TONS (2/3)

HAL-OST-MH02

AS SHOWN

For Approval
(27/03/15)

4 DETAIL OF OIL STORAGE TANK CAP. 1500 M TONS (3/3)

HAL-OST-MH02

AS SHOWN

For Approval
(26/03/15)

5 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (1/6)

HAL-OST-MH03

AS SHOWN

For Approval
(26/03/15)

6 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (2/6)

HAL-OST-MH03

AS SHOWN

For Approval
(26/03/15)

7 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (3/6)

HAL-OST-MH03

AS SHOWN

For Approval
(26/03/15)

8 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (4/6)

HAL-OST-MH03

AS SHOWN

For Approval
(26/03/15)

DETAIL OF OIL STORAGE TANK CAP. 500 M TONS ( TOP & SHELL
MANHOLE ) (5/6)

HAL-OST-MH03

AS SHOWN

For Approval
(26/03/15)

10 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (6/6)

HAL-OST-MH03

AS SHOWN

For Approval
(13/03/15)

11 DETAIL OF OIL DESPATCH SHED

HAL-OST-MH04

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0

VIII. KERNEL STATION


(23/02/15)
1 ARRANGEMENT KERNEL RECOVERY STATION (1 /3)

HAL-KRS-MH01

1 : 150

For Approval
(23/02/15)

2 ARRANGEMENT KERNEL RECOVERY STATION (2/3)

HAL-KRS-MH01

1 : 150

For Approval
(23/02/15)

3 ARRANGEMENT KERNEL RECOVERY STATION (3 /3)

HAL-KRS-MH01

1 : 150

For Approval
(22/03/15)

4 DETAIL OF NUT DESTONER

HAL-KRS-MH02

AS SHOWN

For Approval
(27/03/15)

5 ELVATION OF NUT TRANSFORT DUCTING (1/2)

HAL-KRS-MH03

1 : 55

For Approval
(27/03/15)

6 DETAIL OF NUT TRANSFORT DUCTING (2/2)

HAL-KRS-MH03

AS SHOWN

For Approval
(23/02/15)

7 DETAIL OF NUT CYCLONE

HAL-KRS-MH04

AS SHOWN

For Approval
(26/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0

8 DETAILS OF 350 AIR LOCK

HAL-KRS-MH05

1 : 10

For Approval
(27/03/15)

9 DETAIL OF NUTS GRANDING (1/2)

HAL-KRS-MH06

1 : 25

For Approval
(27/03/15)

10 DETAIL OF NUTS GRANDING (2/2)

HAL-KRS-MH06

AS SHOWN

For Approval
(22/03/15)

11 DETAIL OF NUT HOPPER (1/2)

HAL-KRS-MH07

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
DRAWING NUMBER

SCALE
0
(22/03/15)

12 DETAIL OF NUT HOPPER (2/2)

HAL-KRS-MH07

AS SHOWN

For Approval
(27/03/15)

13 DETAIL OF PLATFORM RIPPLE MILL

HAL-KRS-MH08

1 : 40

For Approval
(26/03/15)

14 DETAILS OF CM (CRACKET MIXTURE) CONVEYOR NO. 1

HAL-KRS-MH09

AS SHOWN

For Approval
(27/03/15)

15 DETAILS OF CM (CRACKET MIXTURE) CONVEYOR NO. 2

HAL-KRS-MH10

AS SHOWN

For Approval
(22/03/15)

16 DETAIL OF CRACKET MIXTURE ELEVATOR (1/2)

HAL-KRS-MH11

AS SHOWN

For Approval
(22/03/15)

17 DETAIL OF CRACKET MIXTURE ELEVATOR (2/2)

HAL-KRS-MH11

AS SHOWN

For Approval
(28/03/15)

18 DETAILM OF L.T.D.S COLUMN & NUT DESTONER COLUMN

HAL-KRS-MH12

AS SHOWN

For Approval
(27/03/15)

19 ELAVATION OF TRANSPORT DUCTING FOR LTDS NO.1 (1/2)

HAL-KRS-MH13

1 : 60

For Approval
(27/03/15)

20 DETAIL OF TRANSPORT DUCTING FOR LTDS NO. 1 (2/2)

HAL-KRS-MH13

AS SHOWN

For Approval
(27/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0

21 ELAVATION OF TRANSPORT DUCTING FOR LTDS NO.2 (1/2)

HAL-KRS-MH14

1 : 60

For Approval
(27/03/15)

22 DETAIL OF TRANSPORT DUCTING FOR LTDS NO. 2 (2/2)

HAL-KRS-MH14

AS SHOWN

For Approval
(23/02/15)

23 DETAIL OF LTDS CYCLONE NO.1 & LTDS NO.2

HAL-KRS-MH15

AS SHOWN

For Approval
(28/04/15)

24 DETAIL OF STRUCTURE & PLATFROM LTDS COLOUMN

HAL-KRS-MH16

AS SHOWN

For Approval
(26/03/15)

25 DETAIL OF WET KERNEL CONVEYOR TO WET KERNEL ELEVATOR

HAL-KRS-MH17

AS SHOWN

For Approval
(13/03/15)

26 DETAIL OF CLAYBATH & VIBRATING SCREEN (1/3)

HAL-KRS-MH18

AS SHOWN

For Approval
(13/03/15)

27 DETAIL OF MIXING TANK (2/3)

HAL-KRS-MH18

AS SHOWN

For Approval
(13/03/15)

28 DETAIL OF MIXING TANK (3/3)

HAL-KRS-MH18

AS SHOWN

For Approval
(27/03/15)

29 DETAILS OF WET KERNEL INCLEDE CONVEYOR FROM CLAYBATH

HAL-KRS-MH19

AS SHOWN

For Approval
(22/03/15)

30 DETAIL OF WET SHEEL CONVEYOR FROM CLAYBATH TO FLOOR

HAL-KRS-MH20

AS SHOWN

For Approval
(22/03/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0

31 DETAIL OF WET KERNEL ELEVATOR (1/2)

HAL-KRS-MH21

AS SHOWN

For Approval
(22/03/15)

32 DETAIL OF WET KERNEL ELEVATOR (2/2)

HAL-KRS-MH21

AS SHOWN

For Approval
(22/03/15)

33 DETAILS OF KERNEL SILO CAP. 50 M3

HAL-KRS-MH22

AS SHOWN

For Approval
(22/03/15)

34 DETAIL OF DRY KERNEL CONVEYOR TO DRY KERNEL ELEVATOR

HAL-KRS-MH23

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(22/03/15)

35 DRY KERNEL ELEVATOR (1/2)

HAL-KRS-MH24

AS SHOWN

For Approval
(22/03/15)

36 DRY KERNEL ELEVATOR (2/2)

HAL-KRS-MH24

AS SHOWN

For Approval
(27/03/15)

37 DETAIL KERNEL BULKING SILO CAP. 300 TON (1/6)

HAL-KRS-MH25

AS SHOWN

For Approval
(27/03/15)

38 DETAIL KERNEL BULKING SILO CAP. 300 TON (2/6)

HAL-KRS-MH25

AS SHOWN

For Approval
(27/03/15)

39 DETAIL KERNEL BULKING SILO CAP. 300 TON (3/6)

HAL-KRS-MH25

1 : 100

For Approval
(27/03/15)

40 DETAIL KERNEL BULKING SILO CAP. 300 TON (4/6)

HAL-KRS-MH25

AS SHOWN

For Approval
(27/03/15)

41 DETAIL KERNEL BULKING SILO CAP. 300 TON (5/6)

HAL-KRS-MH25

AS SHOWN

For Approval
(27/03/15)

42 DETAIL FOUNDATION KERNEL BULKING SILO CAP. 300 TON (6/6 )

HAL-KRS-MH25

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(27/03/15)

43 DETAIL OF DRY KERNEL DISTRIBUTING

HAL-KRS-MH26

AS SHOWN

For Approval
(27/03/15)

44 INTERCONECTIING PLATFORM MAINTENANCE

HAL-KRS-MH27

AS SHOWN

For Approval

IX. POWER HOUSE


(22/03/15)
1 ARRANGEMENT POWER HOUSE

HAL-PWH-MH01

2 DETAIL OF BACK PRESSURE VESSEL

HAL-PWH-MH02

3 DETAIL OF DIESEL SERVICE TANK

HAL-PWH-MH03

4 DETAIL OF DIESEL FUEL STORAGE TANK

HAL-PWH-MH04

1 : 100

For Approval

(13/03/15)
AS SHOWN
For Approval
(13/03/15)
AS SHOWN
For Approval
(13/03/15)
AS SHOWN
For Approval

X. WATER TREATMENT
(22/03/15)
1 : 150
For Approval
(23/03/15)
AS SHOWN
For Approval
(13/03/15)

1 ARRANGEMENT OF WATER TREATMENT PLAN

HAL-RWT-MH01

2 6800 WATER CLARIFIER CAP. 100 M

HAL-RWT-MH02

3 DETAILS OF PRESSURE SAND FILTER (2438 I/DIA x 1219mm S/L)

HAL-RWT-MH03

AS SHOWN

HAL-RWT-MH04

(13/03/15)
AS SHOWN
For Approval

4 OVERHEAD WATER TANK ( 70 M & 40 M ) (1 of 2)

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

5 OVERHEAD WATER TANK ( 70 M & 40 M ) (2 of 2)

HAL-RWT-MH04

6 DETAIL OF WATER BASIN CAP. 500 M

HAL-RWT-MH05

SCALE
0
(13/03/15)
AS SHOWN
For Approval
(13/03/15)
1 : 10
For Approval

XI. BOILER HOUSE


1 ARRANGEMENT BOILER HOUSE (1/2)

HAL-BWH-MH01

2 ARRANGEMENT BOILER HOUSE (2/2)

HAL-BWH-MH01

3 DETAIL OF BOILER STRUCTURE

HAL-BWH-MH02

4 DETAIL OF BOILER FEED TANK

HAL-BWH-MH03

5 DETAIL OF SOFTENER

HAL-BWH-MH04

6 DETAIL OF BOILER FUEL DISTRIBUTING CHAIN CONVEYOR

HAL-BWH-MH05

(27/03/15)
1 : 150
For Approval
(27/03/15)
1 : 140
For Approval
(27/03/15)
AS SHOWN
For Approval
(27/03/15)
AS SHOWN
For Approval
(27/03/15)
AS SHOWN
For Approval
(27/03/15)
AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

7 DEATAIL OF SHEEL & FIBRE SCRAPPER CONVEYOR

HAL-BWH-MH06

AS SHOWN

8 DETAIL OF VACUM DEARATOR

HAL-BWH-MH07

AS SHOWN

9 DEATAIL OF DEARATOR FEED TANK

HAL-BWH-MH08

AS SHOWN

HAL-BWH-MH09

AS SHOWN

10 DETAIL OF DEARATOR FEED TANK STRUCTURE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(27/03/15)
For Approval
(27/03/15)
For Approval
(27/03/15)
For Approval
(27/03/15)
For Approval

C. MAIN BUILDING (STRUCTURE)


(23/02/15)
1 ARRANGEMENT OF PORTAL STEEL STRUCTURE

HAL-MBS-01

1 : 450

For Approval
(23/02/15)

2 ELEVATION OF MAIN PROCESS BUILDING & STERILIZER

HAL-MBS-02

1 : 450

For Approval
(23/02/15)

ARRANGEMENT & SECTION OF ROOFING PLAN FOR MILL


BUILDING

HAL-MBS-03

1 : 450

For Approval
(23/02/15)

4 DETAIL OF PORTAL-1 & PORTAL-2

HAL-MBS-04

1 :100

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0
(23/02/15)

5 DETAIL OF PORTAL-3 & PORTAL-4

HAL-MBS-05

1 :100

For Approval
(23/02/15)

6 DETAIL OF PORTAL-5 & PORTAL-6

HAL-MBS-06

1 :100

For Approval
(23/02/15)

7 DETAIL OF PORTAL-7 & PORTAL-8

HAL-MBS-07

1 :100

For Approval
(23/02/15)

8 DEATAIL RAFTER NO. 1, NO.2 DAN DETAIL OF PORTAL-9

HAL-MBS-08

1 :100

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(23/02/15)

9 DETAIL OF PORTAL-10

HAL-MBS-09

1 :120

For Approval
(23/02/15)

10 DETAIL OF PORTAL-11

HAL-MBS-10

1 :120

For Approval
(23/02/15)

11 DETAIL OF PORTAL-12

HAL-MBS-11

1 :120

For Approval
(23/02/15)

12 DETAIL OF PORTAL-13

HAL-MBS-12

1 :130

For Approval
(23/02/15)

13 DETAIL OF PORTAL-14

HAL-MBS-13

1 :130

For Approval
(23/02/15)

14 DETAIL OF PORTAL-15

HAL-MBS-14

1 :130

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
NO
DRAWING TITLE

List of Drawing Palm Oil Mill Project

DRAWING NUMBER

SCALE

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
0
(23/02/15)

15 DETAIL OF PORTAL-1A & PORTAL-2A

HAL-MBS-15

1 : 110

For Approval
(23/02/15)

16 DETAIL & SECTION A, B, C & No.1

HAL-MBS-16

AS SHOWN

For Approval
(23/02/15)

17 DETAIL & SECTION No.3, No. 4 & No.5

HAL-MBS-17

AS SHOWN

For Approval
(23/02/15)

18 DETAIL & SECTION No.6, No. 7, No.8, N0.9 & No.10

HAL-MBS-18

AS SHOWN

For Approval
(23/02/15)

19 DETAIL & SECTION No.11, No. 12, No. 13 & Canopy

HAL-MBS-19

AS SHOWN

For Approval
(23/02/15)

20 DETAIL & SECTION BRACING

HAL-MBS-20

AS SHOWN

For Approval
(23/02/15)

21 DETAIL & SECTION CREMONA

HAL-MBS-21

AS SHOWN

For Approval

D. MAIN BUILDING (FOUNDATION)


(24/03/15)
1 ARRANGEMENT OF MILL BUILDING FOUNDATION

HAL-MB-CV01

1 :450

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

NO

DRAWING TITLE

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

DRAWING NUMBER

SCALE
0
(24/03/15)

2 DETAIL MAIN BUILDING FOUNDATION (1/3)

HAL-MB-CV02

AS SHOWN

For Approval
(24/03/15)

3 DETAIL MAIN BUILDING FOUNDATION (2/3)

HAL-MB-CV02

AS SHOWN

For Approval
(24/03/15)

4 DETAIL CONCRETE WALL MAIN BUILDING (3/3)

HAL-MB-CV02

AS SHOWN

For Approval

(23/02/15)
ARRANGEMENT & DETAIL OF HORIZONTAL
17
INCLINED E.B. CONVEYOR & SUPPORT

HAL-TRS-MH08

AS SHOWN

For Approval
(23/02/15)

18 DETAIL OF HORIZONTAL EMPTY BUNCH CONVEYOR

HAL-TRS-MH09

AS SHOWN

For Approval
(23/02/15)

19 DETAIL OF INCLINED EMPTY BUNCH CONVEYOR

HAL-TRS-MH10

AS SHOWN

For Approval

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
REMARKS DRAWING REVISI

(09/02/15)

(18/02/15)

(20/03/15)

(17/04/15)

(04/05/15)

(18/05/15)

Revisi lokasi: IPAL,


perumahan
karyawan, water
treatment, geser
lokasi pks ikut
kontur tanah.
(09/02/15)

Putar lokasi pks 5


jalan & fiber
cyclone keluar
batas tanah
Re layout kolom
,pembuatan jalan limbah.
pabrik sejajar
sterilizer & rubah
posisi oil dispath.
(11/02/15)

(18/02/15)

RE layout kolam
Main building
limbah , lokasi
kernel St. dihapus
prumahan dan
1 gang = 6 m.
waduk

(16/03/15)

Geser lokasi pks


ikut kontur
Putar lokasi pks 5
tanah,alan masuk
jalan & fiber
loading ramp
cyclone keluar
,bengkel &
Re layout
Penambahan E.B batas tanah
penambahan
workshop,kantor
conveyor to boiler. ,pembuatan jalan
area, rumah
& jalan.
pabrik sejajar
VIPmanager,
sterilizer & rubah
tamu, steff,
posisi oil dispath.
gudang, kantor
asisten ,sortasi .

(16/04/15)

Re layout kernel
station & cpo
storage.

Issued for tender

(03/05/15)

Lebar Boiler
House 20m
menjadi 22m
Spesifikasi
Atmindo

(08/05/15)

Re layout kolam
limbah, jalan
pabrik, EFB
station & kernel
bulking silo

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
REMARKS DRAWING REVISI

1
(04/03/15)

2
(16/03/15)

Structure solid
dan wet shell
conveyor.

4
(08/05/15)

5
(18/05/15)

Re layout worshop Re layout kernel


, gudang & kernel. station.

Jalan pabrik Efb


station & kernel
bulking silo

Issued for tender

(04/03/15)

(16/03/15)

(08/05/15)

(18/05/15)

Structure solid
dan wet shell
conveyor.

Re layout worshop Re layout kernel


, gudang & kernel. station.

Jalan pabrik Efb


station & kernel
bulking silo

Issued for tender

(16/04/15)
Revisi kernel
station

(18/05/15)

(21/03/15)
loading ramp naik
+8000 & T.bar
posisi
(21/03/15)
loading ramp naik
+8000 & T.bar
posisi
(27/03/15)
loading ramp EL.
+8000 & T Bar
posisi
(27/03/15)

(18/05/15)

3
(16/04/15)

(16/04/15)

Issued for tender

Issued for tender


(18/05/15)
Issued for tender
(17/04/15)

(18/05/15)

posisi T.Bar di
bottom saja

Issued for tender

(17/04/15)

(18/05/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1
loading ramp EL.
+8000 & T Bar
posisi
(27/03/15)
loading ramp EL.
+8000 & T Bar
posisi
(27/03/15)

posisi T.Bar di
bottom saja

Issued for tender

(17/04/15)

(18/05/15)

posisi T.Bar di
bottom saja

Issued for tender

(17/04/15)

(18/05/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
loading ramp EL.
+8000 & T Bar
posisi
(18/05/15)

2
posisi T.Bar di
bottom saja

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(02/03/15)
Lubang dinding
lorry jadi 5 baris
(18/05/15)

(18/05/15)
Issued for tender

Issued for tender


(11/05/15)
Issued for tender
(11/05/15)
PCd Chain &
dimensi bracket
(11/05/15)
Issued for tender

(18/05/15)
Issued for tender

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Issued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(15/04/15)

2
(18/05/15)

End rail track

Issued for tender

(23/02/15)
(21/03/15)
Section A-A & pipa Recovery tank
ke pat fit
tidak pakai
(23/02/15)
(21/03/15)
Section A-A & pipa Recovery tank
ke pat fit
tidak pakai
(04/03/15)
(18/05/15)
Detail spesder
Issued for tender
dan detail NPS
(04/03/15)
(18/05/15)
Detail spesder
Issued for tender
dan detail NPS
(03/04/15)
(18/05/15)
penambahan batu
Issued for tender
kali
(18/05/15)
Issued for tender
(13/04/15)
Atap pompa &
pagar keliling
(14/04/15)

(18/05/15)

Support cat walk

Issued for tender

Issued for tender


(18/05/15)

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

(18/05/15)
Issued for tender
(18/05/15)
Issued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

REMARKS DRAWING REVISI

(02/03/15)

(12/03/15)

(18/05/15)

unstripped bunch
Tiang thresher &
conveyor tidak
Issued for tender
penutip brondolan
pakai
(02/03/15)

(12/03/15)

(18/05/15)

unstripped bunch
Tiang thresher &
conveyor tidak
Issued for tender
penutip brondolan
pakai
(02/03/15)

(12/03/15)

(18/05/15)

unstripped bunch
Tiang thresher &
conveyor tidak
Issued for tender
penutip brondolan
pakai
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(28/03/15)
Issued for tender

(29/04/15)
(18/05/15)
E.F.B station tidak
Issued for tender
pending
(29/04/15)
(18/05/15)

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
2
E.F.B station tidak
Issued for tender
pending
(18/05/15)

List of Drawing Palm Oil Mill Project

REMARKS DRAWING REVISI


3

Issued for tender


(29/04/15)
(18/05/15)
E.F.B station tidak
Issued for tender
pending
(29/04/15)
(18/05/15)
E.F.B station tidak
Issued for tender
pending
(29/04/15)
(18/05/15)
E.F.B station tidak
Issued for tender
pending
(21/04/15)
(18/05/15)
Penyesuaian
chain & sproketc

Issued for tender

(21/04/15)

(18/05/15)

Penyesuaian
chain & sproketc

Issued for tender

(18/05/15)
Issued for tender

(02/03/15)

(12/03/15)

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

(18/05/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1
Panjang cbc =
18300
(18/05/15)

2
Nut pulishing
drum type roller

Issued for tender


(18/05/15)
Issued for tender
(21/04/15)
Penambahan
expanded metal

(18/05/15)
Issued for tender

3
Issued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(18/05/15)

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(08/04/15)
(18/05/15)
Revisi type shaf t
Issued for tender
ke type roller

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(08/04/15)
Penambahan air
transport
controller
(18/05/15)

2
(18/05/15)
Issued for tender

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(08/04/15)

(18/05/15)

Tiang struktur
diganti H-beam
200x200 (semua
fan diatas)

Issued for tender

(08/04/15)

(18/05/15)

Tiang struktur
diganti H-beam
200x200 (semua
fan diatas)

Issued for tender

(18/05/15)

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1

(17/04/15)

(28/04/15)

(18/05/15)

Issued for tender

(03/03/15)

pondasi sludge
Penambahan
CST diganti pakai
centrifugal &
Issued for tender
platform decanter
tiang
decanter pending

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
REMARKS DRAWING REVISI

1
(03/03/15)

2
(17/04/15)

3
(28/04/15)

4
(18/05/15)

pondasi sludge
Penambahan
CST diganti pakai
centrifugal &
Issued for tender
platform decanter
tiang
decanter pending
(03/03/15)

(17/04/15)

(28/04/15)

(18/05/15)

pondasi sludge
Penambahan
CST diganti pakai
centrifugal &
Issued for tender
platform decanter
tiang
decanter pending
(21/04/15)

(18/05/15)

Decanter pending Issued for tender


(21/04/15)

(18/05/15)

Decanter pending
& maintenance
Issued for tender
beam
(06/04/15)
Inlet pipe from
heating tank
(12/04/15)

(30/04/15)
Support tank
pakai tiang
(30/05/15)

Hole spray dia 6


mm

detail base plate


leg support

(12/04/15)

(18/05/15)

(18/05/15)
Issued for tender
(18/05/15)
Issued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
Inside ladder &
agitator bushing

2
Issued for tender

(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/04/15)

(18/05/15)

Hilangkan partisi
clean oil tank

Issued for tender

(18/05/15)
Issued for tender

(18/05/15)
Issued for tender
(18/05/15)
Issued for tender

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1
(15/04/15)

2
(18/05/15)

oil storage cap.


Issued for tender
2000 to 1500 ton
(15/04/15)

(18/05/15)

oil storage cap.


Issued for tender
2000 to 1500 ton

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(15/04/15)

2
(18/05/15)

oil storage cap.


Issued for tender
2000 to 1500 ton
(15/04/15)

(18/05/15)

oil storage cap.


Issued for tender
2000 to 1500 ton
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI

(02/03/15)

(23/03/15)

(11/04/15)

(10/05/15)

(18/05/15)

Re layaout kernel
Re layaout bulking Nut hopper &
Kenel bulking silo
silo, nut hopper &
Issued for tender
silo
cyclone structure
diganti type kotak
bulking silo
(02/03/15)

(23/03/15)

(11/04/15)

(10/05/15)

(18/05/15)

Re layaout kernel
Re layaout bulking Nut hopper &
Kenel bulking silo
silo, nut hopper &
Issued for tender
silo
cyclone structure
diganti type kotak
bulking silo
(02/03/15)

(23/03/15)

(11/04/15)

(10/05/15)

(18/05/15)

Re layaout kernel
Re layaout bulking Nut hopper &
Kenel bulking silo
silo, nut hopper &
Issued for tender
silo
cyclone structure
diganti type kotak
bulking silo
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(23/04/15)

(18/05/15)

Sudut kemiringan
Issued for tender
hopper dirubah

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(23/04/15)

2
(18/05/15)

Sudut kemiringan
Issued for tender
hopper dirubah
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(24/04/15)

(18/05/15)

Sopport conveyor Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(18/05/15)

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1

Issued for tender


(18/05/15)
Issued for tender
(18/05/15)
Issued for tender
(24/04/15)

(18/05/15)

Panjang conveyor Issued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(18/05/15)

Issued for tender


(18/05/15)
Issued for tender
(10/05/15)
Rubah design
dengan type
kotak
(10/05/15)
Rubah design
dengan type
kotak
(10/05/15)
Rubah design
dengan type
kotak
(10/05/15)
Rubah design
dengan type
kotak
(10/05/15)
Rubah design
dengan type
kotak
(10/05/15)
Rubah design
dengan type
kotak

(10/05/15)
Issued for tender
(10/05/15)
Issued for tender
(10/05/15)
Issued for tender
(10/05/15)
Issued for tender
(10/05/15)
Issued for tender
(10/05/15)
Issued for tender

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(18/05/15)
Issued for tender
(15/03/15)
Issued for tender

(16/04/15)
change nozzle
position & view A

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI

(21/03/15)

(12/04/15)

(22/04/15)

(30/04/15)

(03/05/15)

Workshop pindah Hapus 1 kolom


posisi & tambah K,koridor main
gudang
building

Penambahan
keterangan
gambar AS
Bangunan

CNP 150 diganti


CNP 125 & lebar
boiler 22 m

inssued for tender

(21/03/15)

(30/04/15)

(03/05/15)

Workshop pindah Hapus 1 kolom


posisi & tambah K,koridor main
gudang
building

CNP 150 diganti


CNP 125 & lebar
boiler 22 m

inssued for tender

(21/03/15)

(30/04/15)

(03/05/15)

CNP 150 diganti


CNP 125 & lebar
boiler 22 m

inssued for tender

(12/04/15)

(12/04/15)

Workshop pindah Hapus 1 kolom


posisi & tambah K,koridor main
gudang
building
(30/04/15)

(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1
(30/04/15)

2
(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

(02/03/15)

(22/04/15)

Detail 13
Penambahan
penambahan plat
detail rafter
proteksi

(30/04/15)

(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(30/04/15)

2
(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

Gordeng pakai
CNP 125 & jarak
gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

Gordeng CNP 150


diganti CNP 25 & inssued for tender
lebar boiler 22 M
(30/04/15)

(03/05/15)

Gordeng CNP 150


diganti CNP 125 & inssued for tender
lebar boiler 22 M
(30/04/15)

(03/05/15)

Gordeng CNP 150


diganti CNP 125 & inssued for tender
lebar boiler 22 M

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


3

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
1
(30/04/15)

2
(03/05/15)

List of Drawing Palm Oil Mill Project

REMARKS DRAWING REVISI


3

Gordeng CNP 150


inssued for tender
diganti CNP 125
(30/04/15)

(03/05/15)

Anchor bolt 19 &


inssued for tender
base plat 14 THK
(12/04/15)

(03/05/15)

jack R00f T = 1 M inssued for tender


(03/05/15)
inssued for tender
(22/03/15)
Protection Roof
detail N0. 13
(01/04/15)

(12/04/15)
jack Roof T= 1 M
(03/05/15)

detail sambungan
inssued for tender
tiang struktur
(22/04/15)
Penambahan
detail rafter No.
14 & 15

(03/05/15)

(12/04/15)

(30/04/15)
(03/05/15)
(04/05/15)
Lebar boiler house
Instalasi pipa air
inssued for tender
= 22M
hujan

For Approval

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

inssued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

REMARKS DRAWING REVISI


1
(30/04/15)

2
(03/05/15)

Size anchor bolt

inssued for tender

(30/04/15)

(03/05/15)

Size anchor bolt

inssued for tender

(03/05/15)
inssued for tender

(21/04/15)
Penyesuain chain
& sprokets
(21/04/15)
Penyesuain chain
& sprokets

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

(18/05/15)

Issued for tender

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi
G REVISI

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten
G
REVISI Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours
8

Location :
Desa Kubu Kandang Kecamatan Pemayung
Kabupaten Batanghari Provinsi Jambi

List of Drawing Palm Oil Mill Project

PT. Hutan Alam Lestari


Cap. 30_45 Ton FFB/ Hours

G REVISI
8

LIST OF DRAWING
PT.HUTAN ALAM LESTARI (HAL)
PALM OIL MILL CAPACITY 30_45 TON FFB/HR
NO

DESCRIPTION

DRAWING
NUM BER

SCALE

PAPER

HAL-ERW01
HAL-ERW02
HAL-ERW02
HAL-ERW02
HAL-ERW02
HAL-ERW03
HAL-ERW04
HAL-ERW04
HAL-ERW05
HAL-ERW06
HAL-ERW06
HAL-ERW06
HAL-ERW06
HAL-ERW06
HAL-ERW06

1 : 750
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
1 : 1000
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3

HAL-ARR-MH01
HAL-ARR-MH02
HAL-ARR-MH03
HAL-ARR-MH03
HAL-ARR-MH03
HAL-ARR-MH04
HAL-ARR-MH04
HAL-ARR-MH05
HAL-ARR-MH05
HAL-ARR-MH06
HAL-ARR-MH06
HAL-ARR-MH06

1 : 1500
1 : 350
1 : 450
1 : 450
AS SHOWN
1 : 250
1 : 130
1 : 150
1 : 100
1 : 100
1 : 100
1 : 110

A1
A1
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3

REVISI
1

A. EARTH WORK
1 LAYOUT PEKERJAAN TANAH AREA PKS
2 CROSS SECTION 1-1, 2-2 & 3-3 (1 of 4)
3 CROSS SECTION 4-4, 5-5 & 6-6 (2 of 4)
4 CROSS SECTION 7-7 & 8-8 (3 of 4)
5 CROSS SECTION 9-9 & LONG SECTION (4 of 4)
6 LAYOUT PEKERJAAN TANAH KOLAM LIMBAH PKS
7 CROSS SECTION 1-1, 2-2, 3-3 & 4-4 (1 of 2)
8 CROSS SECTION 5-5, 6-6 & 7-7 (2 of 2)
9 LAYOUT PEKERJAAN JALAN AKES KE PABRIK
10 PLAN, LONG & CROSS SECTION-1 (1 of 6)
11 PLAN, LONG & CROSS SECTION-2 (2 of 6)
12 PLAN, LONG & CROSS SECTION-3 (3 of 6)
13 PLAN, LONG & CROSS SECTION-4 (4 of 6)
14 PLAN, LONG & CROSS SECTION-5 (5 of 6)
15 PLAN, LONG & CROSS SECTION-6 (6 of 6)
B. MECHANICAL
I. ARRANGEMENT

(09/02/15)
1 SITE PLAN
2 MILL LAYOUT
3 MACHINARY LAYOUT (1 of 3)
4 MACHINARY LAYOUT (2 of 3)
5 LIST KODE DAN KETERANGAN MESIN-MESIN (3 of 3)
6 ARRANGEMENT OF FRUIT BUNCH RECEPTION (1 of 2)
7 ELEVATION OF FRUIT BUNCH RECEPTION (2 of 2)
8 ARRANGEMENT STERILIZER STATION (1 of 2)
9 ELEVATION OF STERILIZER STATION (2 of 2)
10 ARRANGEMENT FROM TIPPLER TO THRESHER (1 of 3)
11 ARRANGEMENT FROM TIPPLER TO THRESHER (2 of 3)
12 ELEVATION THRESHER STATION

(18/02/15)

(20/03/15)

(17/04/15)

Puta r loka si pk s 5 ja lan &


Revisi
fiber cyclone kelua r ba tas
loka si:ipa l,perumahan,water
tanah ,pembua tan jala n
trhea tment, geser lo kasi pks
pa brik sejaja r sterilizer &
ikut ko untur ta na .
rubah posisi oil dispa th

Re layout kolom limbah

main building kernel St.


dihapus 1 gang + 6 m

(07/02/15)

(18/02/15)

(16/03/15)

13 ARRANGEMENT PRESS STATION TO DEPERICARPER STATION

HAL-ARR-MH07

1 : 170

A3

14 ARRANGEMENT CLARIFICATION STATION (1 of 2)


15 ELEVATION CLARIFICATION STATION (2 of 2)
16 ARRANGEMENT KERNEL RECOVERY STATION (1 of 3)
17 ELEVATION KERNEL RECOVERY STATION (2 of 3)
18 ELEVATION KERNEL RECOVERY STATION (3 of 3)
19 ARRANGEMENT POWER HOUSE
20 ARRANGEMENT BOILER HOUSE
21 ARRANGEMENT WATER TREATMENT PLAN
22 ARRANGEMENT BOILER WATER TREATMENT PLANT

HAL-ARR-MH08
HAL-ARR-MH08
HAL-ARR-MH09
HAL-ARR-MH09
HAL-ARR-MH09
HAL-ARR-MH10
HAL-ARR-MH11
HAL-ARR-MH12
HAL-ARR-MH13

1 : 120
1 : 120
1 : 120
1 : 100
1 : 100
1 : 100

A3
A3
A3
A3
A3
A3

1 : 150

A3

1 SITE PLAN

HAL-ARR-MH01

1 ; 1200

A3

2 MILL LAYOUT

HAL-ARR-MH02

1 ; 500

A3

Geser lo kasi pks ikut ko ntur


Puta r loka si pk s 5 ja lan &
tanah,ala n masuk loa ding
fiber cyclone kelua r ba tas
ramp ,bengkel &
Penambahan E.B co nveyor to
tanah ,pembua tan jala n
pena mba ha n area ,rumah
bo iler
pa brik sejaja r sterilizer &
VIPma na ger,tamu,steff,guda
rubah posisi oil dispa th
ng,ka ntor asisten, sortasi .

3 MACHINARY LAYOUT (1/3)

HAL-ARR-MH03

1 ; 800

A3

4 MACHINARY LAYOUT (2/3)

HAL-ARR-MH03

1 ; 800

A3

5 LIST KODE DAN KETERANGAN MESIN-MESIN (3 of 3)

HAL-ARR-MH03

AS SHOWN

A3

6 ARRANGEMENT OF FRUIT BUNCH RECEPTION (1 of 2)

HAL-ARR-MH04

1 ; 250

A3

7 ELEVATION OF FRUIT BUNCH RECEPTION (2 of 2)

HAL-ARR-MH04

1 ; 130

A3

8 ARRANGEMENT STERILIZER STATION (1 of 2)

HAL-ARR-MH05

1 ; 130

A3

9 ELEVATION OF STERILIZER STATION (2 of 2)

HAL-ARR-MH05

1 ;120

A3

HAL-ARR-MH06

1 ; 100

A3

HAL-ARR-MH06

1 ; 100

A3

12 ELEVATION THRESHER STATION (3/3)

HAL-ARR-MH06

1 : 110

A3

(11/02/15)

(04/03/15)
(16/13/15)
Structure so lid dan wet shell Re la yout worsho p , gudang
convey or
& kernel
(16/04/15)
For approval
(21/03/15)
loa ding ra mp na ik +8000 &
T. ba r po sisi
(21/03/15)
loa ding ra mp na ik +8000 &
T. ba r po sisi
(23/02/15)
(21/03/15)
Section A-A & pipa ke pat fit
(23/02/15)

10 ARRANGEMENT FROM TIPLER TO THREASHER (1/3)

11 ARRANGEMENT FROM TIPLER TO THREASHER (2/3)

(21/03/15)
Recovery tank tidak pakai
(12/03/15)
unstripped bunch con. Pending
(12/03/15)
unstripped bunch con. Pending
(12/03/15)
thresher type roller &
unstripped bunch

13 ARRANGEMENT PRESS STATION TO DEPERICARPER STATION

HAL-ARR-MH07

1 :170

A3
(03/03/15)

(17/04/15)

HAL-ARR-MH08

1 ; 110

A3

Penambahan platform decanter

po ndasi sludge centrifugal


pending solid bin

(03/03/15)

(17/04/15)

15 ARRANGEMENT & ELEVATION CLARIFICATION STATION (2 of 3)

HAL-ARR-MH08

1 ; 110

A3

Penambahan platform decanter

po ndasi sludge centrifugal


pending solid bin

(03/03/15)

(17/04/15)

16 ELAVATION OF CLARIFIKASI STATION (3 of 3)

HAL-ARR-MH08

1 ; 110

A3

Penambahan platform decanter

po ndasi sludge centrifugal


pending solid bin

17 ARRANGEMENT KERNEL RECOVERY STATION (1 of 3)

HAL-ARR-MH09

1 ; 150

A3

(02/03/15)

19 ELEVATION KERNEL RECOVERY STATION (3 of 3)

HAL-ARR-MH09

HAL-ARR-MH09

1 ; 150

1 ; 150

A3

A3

20 ARRANGEMENT POWER HOUSE

HAL-ARR-MH10

1 ; 100

A3

21 ARRANGEMENT BOILER HOUSE (1/2)


22 ARRANGEMENT BOILER HOUSE (2/2)
23 ARRANGEMENT WATER TREATMENT PLAN

HAL-ARR-MH11
HAL-ARR-MH11
HAL-ARR-MH12

1 ; 150
1 ; 140
1 ; 150

A3
A3
A3

1 DETAIL & SECTION OF LOADING RAMP (1 of 4)

HAL-FRS-MH01

AS SHOWN

A3

2 DETAIL & SECTION OF LOADING RAMP (2 of 4)

HAL-FRS-MH01

AS SHOWN

A3

(23/03/15)

(11/04/15)

(22/04/15)

Nut hopper & cyclone structure

Re la yao ut kernel silo , nut


ho pper & bulking silo

Position nut transport ducting

(23/03/15)

(11/04/15)

Re layaout bulking silo

Nut hopper & cyclone structure

Re la yao ut kernel silo , nut


ho pper & bulking silo

(02/03/15)

(23/03/15)

(11/04/15)

Re layaout bulking silo

Nut hopper & cyclone structure

Re la yao ut kernel silo , nut


ho pper & bulking silo

Re layaout bulking silo


(02/03/15)

(16/04/15)
cha nge no zzle po sitio n &
view A

II. FRUIT RECEIPTION STATION

3 DETAIL & SECTION OF LOADING RAMP (3 of 4)

HAL-FRS-MH01

AS SHOWN

A3

4 DETAIL & SECTION OF LOADING RAMP (4 of 4)

HAL-FRS-MH01

AS SHOWN

A3

5 DETAIL OF GUIDE BOLLARD (1 of 2)


6 DETAIL OF GUIDE BOLLARD (2 of 2)
7 DETAIL OF WINCH DRUM (1 of 2)
8 DETAIL OF WINCH DRUM (2 of 2)
9 DETAIL OF 7.5 TON CAGE AND BOGIES (1 of 2)
10 DETAIL OF 7.5 TON CAGE AND BOGIES (2 of 2)
11 DETAIL OF TRANSFER CARRIAGE (1 of 3)

HAL-FRS-MH02
HAL-FRS-MH02
HAL-FRS-MH03
HAL-FRS-MH03
HAL-FRS-MH04
HAL-FRS-MH04
HAL-FRS-MH05

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3
A3
A3

12 DETAIL OF TRANSFER CARRIAGE (2 of 3)


13 DETAIL OF TRANSFER CARRIAGE (3 of 3)
14 DETAIL OF RAIL TRACK SYSTEM

HAL-FRS-MH05

AS SHOWN

A3

(27/03/15)
(17/04/15)
loa ding ra mp EL. +8000 & T
posisi T.Bar di bottom saja
Bar posisi
(27/03/15)
(17/04/15)
loa ding ra mp EL. +8000 & T
posisi T.Bar di bottom saja
Bar posisi
(27/03/15)
(17/04/15)
loa ding ra mp EL. +8000 & T
posisi T.Bar di bottom saja
Bar posisi
(27/03/15)
(17/04/15)
loa ding ra mp EL. +8000 & T
posisi T.Bar di bottom saja
Bar posisi

(15/04/15)
PCd Chain of bracket 150
mm to 152, 4 mm

HAL-FRS-MH05

AS SHOWN

A3

HAL-FRS-MH06

AS SHOWN

A3

(15/04/15)
End rail track

1 DETAIL OF STERILIZER DIA. 2700 O/D (1 of 2)

HAL-STR-MH01

AS SHOWN

A3

Detail spesder dan detail NPS

2 DETAIL OF STERILIZER DIA. 2700 O/D (2 of 2)

HAL-STR-MH01

AS SHOWN

A3

3 DETAIL OF BLOW DOWN & BLOW OFF SILINCER


4 DETAIL OF MOBILE RAIL BRIDGE

HAL-STR-MH02
HAL-STR-MH03

AS SHOWN
AS SHOWN

A3
A3

III. STERILIZER STATION


(04/03/15)

(04/03/15)
Detail spesder dan detail NPS
(03/04/15)
penambahan batu kali
(13/04/15)
5 DETAIL OF CONDESAT PIT

HAL-STR-MH04

AS SHOWN

A3

Atap pompa & pagar keliling

6 DETAIL OF STERILIZER CAT WALK

HAL-STR-MH05

AS SHOWN

A3

(14/04/15)
Support cat walk

1 DETAILS OF TIPPLER (1/2)


2 DETAILS OF TIPPLER ROLLER (2/2)
3 DETAIL OF THRESHING DRUM (1/5)
4 DETAIL OF STRUCTURE & PLATFORM THRESHING (2/5)
5 DETAIL OF CLADDING & CHASSING THRESHING (3/5)
6 DETAIL OF CLADDING & CHASSING THRESHING (4/5)
7 DETAIL OF STAIR & INSPECTION DOOR THRESHING (5/5)
8 DETAIL OF 600 UNDER THRESHER CONVEYOR (1/2)
9 DETAIL OF 600 UNDER THRESHER CONVEYOR (2/2)
10 DETAIL OF 600 UNDER CROSS CONVEYOR (1/2)
11 DETAIL OF 600 UNDER CROSS CONVEYOR (2/2)
12 DETAIL OF 600 FRUIT DISTRIBUTING CONVEYOR (1/2)
13 DETAIL OF 600 FRUIT DISTRIBUTING CONVEYOR (2/2)

HAL-TRS-MH01
HAL-TRS-MH01
HAL-TRS-MH02
HAL-TRS-MH02
HAL-TRS-MH02
HAL-TRS-MH02
HAL-TRS-MH02
HAL-TRS-MH03
HAL-TRS-MH03
HAL-TRS-MH04
HAL-TRS-MH04
HAL-TRS-MH05
HAL-TRS-MH05

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3
A3

14 DETAIL OF STERILIZER FRUIT BUNCH (SFB) CONVEYOR

HAL-TRS-MH06

AS SHOWN

A3

15 ARRANGEMENT & DETAIL OF HORIZONTAL INCLINED E.B CONVEYOR & SAPPORT HAL-TRS-MH07

AS SHOWN

A3

IV. THRESHING STATION

(15/04/15)
change dimension
of gasset plate
scrapper

(21/04/15)
16 DETAIL OF HORIZONTAL EMPTY BUNCH CONVEYOR

HAL-TRS-MH08

AS SHOWN

A3

Penyesuain chain & sprokets

17 DETAIL OF INCLINED EMPTY BUNCH CONVEYOR

HAL-TRS-MH09

AS SHOWN

A3

Penyesuain chain & sprokets

(21/04/15)

18 CHUTE PENGUTIP BRONDOLAN


V. PRESS & DEPERICARPER STATION
1 DETAIL OF PRESS STRUCTURE (1 of 2)
2 DETAIL OF PRESS STRUCTURE (2 of 2)

HAL-TRS-MH10

AS SHOWN

A3

HAL-PRS-MH01
HAL-PRS-MH01

AS SHOWN
AS SHOWN

A3
A3
(21/04/15)

3 DETAIL OF FRUIT ELEVATOR (1 of 2)


4 DETAIL OF FRUIT ELEVATOR (2 of 2)
5 DETAIL OF 800 CAKE BREAKER CONVEYOR NO.1
6 DETAIL OF 800 CAKE BREAKER CONVEYOR NO.2
7 DETAIL SUPPORT & PLATFORM CBC (1/2)
8 DETAIL SUPPORT & PLATFORM CBC (2/2)
9 PNEUMATIC DEPERICARPER
10 CRUDE OIL TANK (15m)
11 DETAILS OF NUT PULISHING DRUM
12 DETAILS OF SANDTRAP TANK

HAL-PRS-MH02

AS SHOWN

A3

HAL-PRS-MH02
HAL-PRS-MH03
HAL-PRS-MH04
HAL-PRS-MH05
HAL-PRS-MH05
HAL-PRS-MH06
HAL-PRS-MH07
HAL-PRS-MH08
HAL-PRS-MH09

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
1 : 25
AS SHOWN
1 : 25

A3
A3
A3
A3
A3
A3
A3
A3
A3

13 DETAILS OF VIBRATING SCREEN PLATFORM & BUFFER TANK

HAL-PRS-MH10

AS SHOWN

A3

14 PNEUMATIC AIR TRANSPORT CONTROLER

HAL-PRS-MH11

AS SHOWN

A3

HAL-CST-MH01

AS SHOWN

A3

Penambahan expanded metal

VI. CLARIFICATION STATION


(21/04/15)
1 DETAIL OF CLARIFICATION STRUCTURE (1 of 2)

hapus struktur solid decanter


(21/04/15)

2 DETAIL OF CLARIFICATION STRUCTURE (2 of 2)

HAL-CST-MH01

AS SHOWN

A3

hapus struktur solid decanter

3 DETAIL COU NT INUOS SETLLIN G TAN K CAP. 120 M (1 of 3)

HAL-CST-MH02

1 : 65

A3

Inlet pipe from heating tank

(06/04/15)

4 DETAIL COU NT INUOS SETLLIN G TAN K CAP. 120 M (2 of 3)

HAL-CST-MH02

AS SHOWN

A3

(06/04/15)
Hole spray dia 6 mm
(12/04/15)

5 DETAIL COU NT INUOS SETLLIN G TAN K CAP. 120 M (3 of 3)

HAL-CST-MH02

AS SHOWN

A3

Inside ladder , agitator bushing

6 DETAL OF SLUDGE TANK CAP. 30 M


7 DETAL OF PURE OIL TANK CAP. 30 M (2 UNIT)
8 DETAL OF SLUDGE BUFFER TANK CAP. 10 M

HAL-CST-MH03
HAL-CST-MH04
HAL-CST-MH05

AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
(18/04/15)

9 DETAIL OF RECLAIMED OIL TANK, SLUDGE DRAIN TANK & CLEAN OIL TANK
10 DETAIL OF HOT WELL TANK
11 HOT WATER TANK TANK
12 DETAIL SLUDGE PIT

HAL-CST-MH06

AS SHOWN

A3

HAL-CST-MH07
HAL-CST-MH08
HAL-CST-MH09

1 : 20
1 : 25
AS SHOWN

A3
A3
A3

Hilangkan partisi clean oil tank

VII. OIL STORAGE


1 DETAIL OF OIL STORAGE TANK CAP. 2000 M TONS (1 of 3)

HAL-OST-MH01

AS SHOWN

A3

2 DETAIL OF OIL STORAGE TANK CAP. 2000 M TONS (2 of 3)

HAL-OST-MH01

AS SHOWN

A3

3 DETAIL OF OIL STORAGE TANK CAP. 2000 M TONS (3 of 3)


4 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (1 of 6)
5 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (2 of 6)
6 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (3 of 6)
7 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (4 of 6)
8 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (5 of 6)
9 DETAIL OF OIL STORAGE TANK CAP. 500 M TONS (6 of 6)
10 DETAIL OF OIL DESPATCH SHED

HAL-OST-MH01

AS SHOWN

A3

HAL-OST-MH02
HAL-OST-MH02
HAL-OST-MH02
HAL-OST-MH02
HAL-OST-MH02
HAL-OST-MH02
HAL-OST-MH03

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3
A3
A3

HAL-KRS-MH01

AS SHOWN

A3

(15/04/15)
oil stora ge cap. 2000 to 1500
ton
(15/04/15)
oil stora ge cap. 2000 to 1500
ton
(15/04/15)
oil stora ge cap. 2000 to 1500
ton

VIII. KERNEL STATION


1 DETAILS OF C.M ELEVATOR & WET KERNEL ELEVATOR (1/2)
2 DETAILS OF C.M ELEVATOR & WET KERNEL ELEVATOR (2/2)

HAL-KRS-MH01

AS SHOWN

A3

3 DETAIL OF KERNEL BULKING SILO (1/2)


4 DETAIL OF KERNEL BULKING SILO (2/2)

HAL-KRS-MH02
HAL-KRS-MH02

AS SHOWN
AS SHOWN

A3
A3

5 DETAILS OF CLAYBATH, VIBRATING SCREEN & TANGKI MIXING

HAL-KRS-MH03

AS SHOWN

A3

6 DETAILS OF KERNEL SILO CAP.50 M3


7 DETAILS OF NUT DESTONER

HAL-KRS-MH04
HAL-KRS-MH05

AS SHOWN
1 : 100

A3
A3

8 DETAILS OF NUT HOPPER (1/2)

HAL-KRS-MH06

AS SHOWN

A3

9 DETAILS OF NUT HOPPER (2/2)

HAL-KRS-MH06

AS SHOWN

A3

10 DETAILS OF PLATFORM RIPPLE MILL


11 DETAILS OF NUT AUGER CONVEYOR
12 DETAILS OF CM CONVEYOR N0 1 (1/2)
13 DETAILS OF CM CONVEYOR N0 2 (2/2)

HAL-KRS-MH07
HAL-KRS-MH08
HAL-KRS-MH09
HAL-KRS-MH09

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3

14 DETAILS OF WET KERNEL CONVEYOR TO WET KERNEL ELEVATOR

HAL-KRS-MH10

AS SHOWN

A3

(23/04/15)
Sudut kem iringan ho pper
diruba h
(23/04/15)
Sudut kem iringan ho pper
diruba h

(24/04/15)

15 DETAILS OF WET KERNEL INCLINED CONVEYOR FROM CLAYBATH

HAL-KRS-MH11

AS SHOWN

A3

16 DETAILS OF WET KERNEL ELEVATOR (1/2)


17 DETAILS OF WET KERNEL ELEVATOR (2/2)

HAL-KRS-MH12
HAL-KRS-MH12

AS SHOWN
AS SHOWN

A3
A3

Support conveyor

(24/04/15)
18 DETAILS OF DRY KERNEL CONVEYOR TO DRY KERNEL ELEVATOR

HAL-KRS-MH13

AS SHOWN

A3

19 DETAILS OF WET SHELL CONVEYOR FROM CLAYBATH TO FLOOR

HAL-KRS-MH14

AS SHOWN

A3

20 DETAILS OF L.T.D.S COLUMN & NUT DESTONER COLUMN


21 DETAILS OF STRUCTURE & PLATFORM LTDS COULUMN
22 DETAILS OF FIBER CICLONE

HAL-KRS-MH15
HAL-KRS-MH16
HAL-KRS-MH17

AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3

23 ELEVATION OF TRANSPORT DUCTING FOR LTDS NO. 1 (1/2)

HAL-KRS-MH18

1 : 160

A3

24 DETAIL OF TRANSPORT DUCTING FOR LTDS NO. 1 (2/2)

HAL-KRS-MH18

AS SHOWN

A3

25 ELEVASTION OF TRANSPOTR DUCTING FOR LTDS NO. 2 (1/2)

HAL-KRS-MH19

1 : 160

A3

26 DETAIL OF TRANSPORT DUCTING FOR LTDS NO. 2 (2/2)


27 DRIED KERNEL ELEVATOR (1/2)
28 DRIED KERNEL ELEVATOR (2/2)
29 DETAIL OF 750 AIR LOCK
30 DETAIL OF NUT CYCLONE

HAL-KRS-MH19
HAL-KRS-MH20
HAL-KRS-MH20
HAL-KRS-MH21
HAL-KRS-MH22

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3

panjang conveyor

(16/04/15)

Re la yout workshop,kantor & Re la yout kernel statio n &


jala n
cpo storage

(16/04/15)
Re layout kernel station

Recovery tank tidak pakai

Section A-A & pipa ke pat fit


(02/03/15)
Tiang thresher & penutip
bro ndolan
(02/03/15)
Tiang thresher & penutip
bro ndolan
(02/03/15)
Tiang thresher & penutip
bro ndolan

14 ARRANGEMENT OF CLARIFICATION STATION (1 of 3)

18 ELEVVATION KERNEL RECOVVERY STATION (2 of 3)

31 DETAILS OF CRACKED MIXTURE CYCLONE LTDS N0.1 & LTDS N0.2

HAL-KRS-MH23

AS SHOWN

A3

32 ELEVATION OF FIBER TRANSPOTR DUCTING (1/2)


33 DETAIL OF FIBER TRANSPOTR DUCTING (2/2)
34 DETAILS OF 350 AIRLOCK
35 DETAIL OF FIBRE CYCLONE STRUCTURE (1/2)
36 DETAIL OF FIBRE CYCLONE STRUCTURE (2/2)
37 ELEVATION OF NUT TRANSPOR DUCTING (1/2)
38 DETAIL OF NUT TRANSPOR DUCTING (2/2)
39 DETAIL OF NUTS GRANDING (1/2)
40 DETAIL OF NUTS GRANDING (2//2)
41 INTERCONETING PLATFORM MAINTENANCE

HAL-KRS-MH24
HAL-KRS-MH24
HAL-KRS-MH25
HAL-KRS-MH26
HAL-KRS-MH26
HAL-KRS-MH27
HAL-KRS-MH27
HAL-KRS-MH28
HAL-KRS-MH28
HAL-KRS-MH29

1 : 170
AS SHOWN
1 : 10
AS SHOWN
AS SHOWN
1 : 55
AS SHOWN
1 : 25
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3
A3
A3
A3
A3
A3

HAL-PWH-MH01
HAL-PWH-MH02
HAL-PWH-MH03

AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3

IX. POWER HOUSE


1 DETAIL OF BACK PRESSURE VESSEL
2 DETAIL OF DIESEL SERVICE TANK
3 DETAIL OF DIESEL FUEL STORAGE TANK
X. WATER TREATMENT
1 6800 WATER CLARIFIER CAP. 100 M

HAL-RWT-MH01

AS SHOWN

A3

2 DETAILS OF PRESSURE SAND FILTER (2438 I/DIA x 1219mm S/L)

HAL-RWT-MH02

AS SHOWN

A3

3 OVERHEAD WATER TANK ( 70 M & 40 M ) (1 of 2)


4 OVERHEAD WATER TANK ( 70 M & 40 M ) (2 of 2)
5 DETAIL OF WATER BASIN CAP. 500 M

HAL-RWT-MH03
HAL-RWT-MH03
HAL-RWT-MH04

AS SHOWN
AS SHOWN
1 : 10

A3
A3
A3

HAL-BWH-MH01
HAL-BWH-MH02
HAL-BWH-MH03
HAL-BWH-MH04
HAL-BWH-MH05
HAL-BWH-MH06
HAL-BWH-MH07
HAL-BWH-MH08

AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN
AS SHOWN

A3
A3
A3
A3
A3
A3
A3
A3

(21/03/15)

(12/04/15)

(22/04/15)

(30/04/15)

(03/05/15)

1 ARRANGEMENT OF PORTAL STEEL STRUCTURE

HAL-MBS-01

1 : 450

A3

Wo rksho p pinda h posisi &


tambah gudang

Ha pus 1 kolom K, korido r


main building

Penambahan keteranga n
ga mba r AS Banguna n

CNP 150 diganti CNP 125 &


lebar boiler 22 m

inssued for tender

(21/03/15)

(12/04/15)

(30/04/15)

(03/05/15)

2 ELEVATION OF MAIN PROCESS BUILDING & STERILIZER

HAL-MBS-02

1 : 450

A3

Wo rksho p pinda h posisi &


tambah gudang

Ha pus 1 kolom K, korido r


main building

CNP 150 diganti CNP 125 &


lebar boiler 22 m

inssued for tender

(21/03/15)

(12/04/15)

(30/04/15)

(03/05/15)

3 ARRANGEMENT & SECTION OF ROOFING PLAN FOR MILL BUILDING

HAL-MBS-03

1 : 450

A3

Wo rksho p pinda h posisi &


tambah gudang

Ha pus 1 kolom K, korido r


main building

CNP 150 diganti CNP 125 &


lebar boiler 22 m

inssued for tender

(30/04/15)

(03/05/15)

4 DETAIL OF PORTAL-1 & PORTAL-2

HAL-MBS-04

1 :100

A3

XI. BOILER HOUSE


1 DETAIL OF BOILER STRUCTURE
2 DETAIL OF BOILER FEED TANK
3 DETAIL OF SOFTENER
4 DETAIL OF BOILER FUEL DISTRIBUTING CHAIN CONVEYOR
5 DEATAIL OF SHEEL & FIBRE SCRAPPER CONVEYOR
6 DETAIL OF VACUM DEARATOR
7 DEATAIL OF DEARATOR FEED TANK
8 DETAIL OF DEARATOR FEED TANK STRUCTURE
C. MAIN BUILDING (STRUCTURE)

5 DETAIL OF PORTAL-3 & PORTAL-4

HAL-MBS-05

1 :100

A3

6 DETAIL OF PORTAL-5 & PORTAL-6

HAL-MBS-06

1 :100

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

A3

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

7 DETAIL OF PORTAL-7 & PORTAL-8

HAL-MBS-07

1 :100

A3

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M
(02/03/15)

(22/04/15)

(30/04/15)

(03/05/15)

8 DEATAIL RAFTER NO. 1, NO.2 DAN DETAIL OF PORTAL-9

HAL-MBS-08

1 :100

A3

Detail 13 pena mba ha n pla t


pro teksi

Penambahan detail rafter

Go rdeng pakai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

9 DETAIL OF PORTAL-10

HAL-MBS-09

1 :120

A3

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

10 DETAIL OF PORTAL-11

HAL-MBS-10

1 :120

A3

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

11 DETAIL OF PORTAL-12

HAL-MBS-11

1 :120

A3

Go rdeng pa kai CNP 125 &


jara k gordeng 1,2 M

inssued for tender

(30/04/15)

(03/05/15)

12 DETAIL OF PORTAL-13

HAL-MBS-12

1 :130

A3

Go rdeng CNP 150 diganti


CNP 25 & leba r bo iler 22 M

inssued for tender

13 DETAIL OF PORTAL-14

HAL-MBS-13

1 :130

A3

Go rdeng CNP 150 diganti


CNP 25 & leba r bo iler 22 M

inssued for tender

(30/04/15)

(03/05/15)

14 DETAIL OF PORTAL-15

HAL-MBS-14

1 :130

A3

(30/04/15)

15 DETAIL OF PORTAL-1A & PORTAL-2A

HAL-MBS-15

1 : 110

A3

16 DETAIL & SECTION A, B, C & No.1

HAL-MBS-16

AS SHOWN

A3

17 DETAIL & SECTION No.3, No. 4 & No.5

HAL-MBS-17

AS SHOWN

A3

18 DETAIL & SECTION No.6, No. 7, No.8, N0.9 & No.10

HAL-MBS-18

AS SHOWN

A3

19 DETAIL & SECTION No.11, No. 12, No. 13 & Canopy

HAL-MBS-19

AS SHOWN

A3

20 DETAIL & SECTION BRACING

HAL-MBS-20

AS SHOWN

A3

21 DETAIL & SECTION CREMONA

HAL-MBS-21

AS SHOWN

A3

HAL-MB-CV01

1 :450

A3

Go rdeng CNP 150 diganti


CNP 25 & leba r bo iler 22 M

inssued for tender

(03/05/15)

inssued for tender

(30/04/15)
Go rdeng CNP 150 diganti
CNP 125
(30/04/15)
Anchor bolt 19 & base pla t
14 T HK
(12/04/15)
jack R00f T = 1 M
(03/05/15)
inssued for tender
(22/03/15)

(03/05/15)

Protection Roof detail N0. 13

jack Roof T= 1 M

inssued for tender


(03/05/15)
inssued for tender
(03/05/15)
inssued for tender

(12/04/15)

(01/04/15)
(03/05/15)
detail sa mbungan tiang
inssued for tender
struktur
(22/04/15)
(03/05/15)
Penambahan detail rafter No.
inssued for tender
14 & 15

D. MAIN BUILDING (FOUNDATION)


1 ARRANGEMENT OF MILL BUILDING FOUNDATION
2 DETAIL MAIN BUILDING FOUNDATION (1/3)

HAL-MB-CV02

AS SHOWN

A3

3 DETAIL MAIN BUILDING FOUNDATION (2/3)

HAL-MB-CV02

AS SHOWN

A3

4 DETAIL CONCRETE WALL MAIN BUILDING (3/3)

HAL-MB-CV02

AS SHOWN

A3

E. MACHINERY CIVIL WORKS


I. FRUIT RECEPTION STATION FOUNDATION
1
FRIUT RECEPTION FOUNDATION LAY OUT
2
LOADING RAMP FONDATION
3
TRANSFER CARRIAGE PIT
4
WINCH FOUNDATION
5
BOLLARD FOUNDATION
II. STERILIZER STATION
1
STERILIZER FOUNDATION
2
BLOWDOWN FOUNDATION & CONDESATE PIT
III. THRESHING STATION
1
THRESHING & PRESSING STATION FOUNDATION
2
BUNCH CONVEYOR & TIPPLER FOUNDATION
3
INCINERATOR FOUNDATION
IV. CLARIFICATION STATION
1
CLARIFICATION FOUNDATION
2
DETAIL OF SLUDGE PIT
3
DETAIL PARIT CLARIFIKASI
V. OIL STORAGE
1
OIL STORAGE TANK FOUNDATION
2
OIL LOADING SHEED FOUNDATION
3
DESPATCH PUMP HOUSE
VI. KERNEL STATION
1
KERNEL RECOVERY STATION FOUNDATION
VII. STEAM STATION
1
BOILER FIRING PLATFORM FOUNDATION
2
ARR. OF REINFORCING BAR FOR BOILER FOUNDATION
3
BOILER FOUNDATION
VIII. POWER PLAN
1
POWER STATION FOUNDATION
IX. CLARIFICATION STATION
1
BOILER WATER TREATMENT FOUNDATION
2
ARR. WATER TREATMENT PLAN FOUNDATION
3
RAW WATER INTAKE
4
WATER TREATMENT PUMP HOUSE
5
RAW WATER INTAKE PUMP HOUSE
6
CLARIFIER WATER BASIN CAP. 260 M
7
RECERVOIR PUMP HOUSE
F. OFFICE & WEIGHBRIDGE
1
LAYOUT & VIEW (OFFICE & WEIGHBRIDGE)
2
3
4

ARRANGEMENT & SECTION FOUNDATION (OFFICE & WEIGHBRIDGE)


SECTION & DETAIL OFFICE FOUNDATION
SECTION & DETAIL WEIGHBRIDGE FOUNDATION

E. EFFLUENT TREATMENT SYSTEM


1
EFFLUENT TREATMENT FOUNDATION
F. AUXILIARY BUILDING
1
2
3
4
5
6
7
8

GATE & FENCING


MUSHOLLA
GUARD HOUSE
TOILET BLOCK
ROAD MILL
MILL DRAINAGE
SUPERVISOR ROOM
POWER HOUSE BUILDING

G. SCHEMATIC DIAGRAM
1
2
3
4

SINGLE LINE DIAGRAM FOR WATER PIPE


SINGLE LINE DIAGRAM FOR SLUDGE & OIL PIPE
STEAM PIPING LINE
SINGLE LINE DIAGRAM ELECRICAL
ESTIMASI TOTAL SHEET DRAWING

(12/04/15)

(30/04/15)

(03/05/15)

(04/05/15)

For Approval

Lebar boiler house = 22M

inssued for tender

Instalasi pipa air hujan

(30/04/15)
Size anchor bolt
(30/04/15)
Size anchor bolt
(03/05/15)
inssued for tender

(03/05/15)
inssued for tender
(03/05/15)
inssued for tender