Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

1.

70
2.20

1.50

2.00

2.20

2.70
2.50

2.00

PLAN (SUPPORT PIER NO.15)


0.20

PLAN (ANCHOR BLOCK NO.6)


-0.40

1.53
0.20

1.07

0.32

-0.

0.74

64
0.

40

Plum concrete with 40% plums

0.7

0.19

0.35

0.50

0.39

Plum concrete with 40% plums

0.37

0.35

0.11

0.31

2.20

0.1 m thick PCC


0.2 m thick flat soling
75 mm thick M15 blinding concrete

0.33

0.50

0.88

SECTION C - C

0.1 m thick PCC


0.2 m thick flat soling
75 mm thick M15 blinding concrete
Notes:
1. All dimensions are in m, level are in meters above sea level.
2. This drawing is to be read in conjunction with the following drawings:
TKMHP-PS-01, Penstock (Profile)
3. The mark, in volume, used for concrete shall be as follows:
M15 - 1:2:4 (cement : sand : coarse aggregate)
M25 - 1:1:2 (cement : sand : coarse aggregate)
PCC- 1:2:4 (cement : sand : coarse aggregate)

SECTION A - A

meters 0

1.5

2 meters

SCALE
ALL DIMENSIONS ARE IN m UNLESS OTHERWISE SPECIFIED.

POTENTIAL STUDY OF TAWA KHOLA MHP, TAPLEJUNG


TAWA KHOLA MICRO HYDROPOWER PROJECT,97 kW
Designed: Tawa Khola MHP Study Group, CIEG 2010
ANCHOR BLOCK
PLAN AND SECTION
SHEET 2 OF 2
Civil Drawings

Drawn:

Tawa Khola MHP Study Group, CIEG 2010

Checked:

Drawing No:

KATHMANDU UNIVERSITY
School of Engineering
Department of Civil and Geomatics Engineering
Tawa Khola MHP Study Group,CIEG 2010
Dhulikhel,Kavre

TKMHP-AB-02