Section B - B: Potential Study of Tawa Khola MHP, Taplejung Tawa Khola Micro Hydropower Project, 97 KW Gravel Trap
Section B - B: Potential Study of Tawa Khola MHP, Taplejung Tawa Khola Micro Hydropower Project, 97 KW Gravel Trap
00
6.00
0.15
3.00
1459.016 m
1 in 60 Slope
1457.591 m
Flushing Canal
Outlet Zone
3
1
1459.016 m
0.50
1458.716 m
NWL
1458.041 m
1458.096 m
2.50
Inlet Zone
HFL
1459.016 m
Headrace Canal
0.90
1 in 3 Slope
Flood
Canal
0.46
3.00
1458.341 m
Settling Zone
0.40
1458.341 m
1457.266 m
0.40
NWL 1456.944 m
0.40
1:10
1:10
1456.516 m
0.80
1456.516 m
0.80
3.00
0.80
Spillway Chute
1.30
SECTION B - B
Flushing Gate
4.00
PLAN
0.40
0.46
F.B. (0.3 m)
1459.016 m
1459.016 m
3.00
1459.016 m
HFL 1458.716 m
HFL
1458.716 m
NWL
1458.041 m
1458.341 m
Spillway Crest Level (1458.096 m)
NWL 1458.041 m
1:350
1:1000
1458.096 m
2.50
3.00
1.00
0.40
1457.591 m
1457.266 m
1
NWL 1456.944 m
1:10
1:60
5.00
1456.516 m
Sediment Storage
6.00
0.1 m thick PCC
0.2 m thick flat soling
75 mm thick M15 blinding concrete
0.80
0.15
Flushing Gate (0.6 m X 0.6 m)
meters 0
1.5
3.00
0.80
Spillway Chute
1.40
SECTION C - C
SECTION A - A
Notes:
1. All dimensions are in m, level are in meters above sea level.
2. This drawing is to be read in conjunction with the following drawings:
TKMHP-HW-01, Headworks (Plan)
3. The mark, in volume, used for concrete shall be as follows:
M15 - 1:2:4 (cement : sand : coarse aggregate)
M25 - 1:1:2 (cement : sand : coarse aggregate)
PCC- 1:2:4 (cement : sand : coarse aggregate)
1:30
1456.397 m
2
SCALE
5 meters
Drawn:
Checked:
Drawing No:
KATHMANDU UNIVERSITY
School of Engineering
Department of Civil and Geomatics Engineering
Tawa Khola MHP Study Group,CIEG 2010
Dhulikhel,Kavre
TKMHP-HW-04