Daily Highlights

Document No. FCIPL/PM/F/002

TANK PAD CONSTRUCTION WORK


At
Refinery and Petrochemicals Integrated Development (RAPID) Project P22
Weather: Sunny
S.No

Description
Today Progress

excavation and compaction tank pad 5110-T-001A 70 % (excavate slope)

excavation and compaction tank pad 5150-T-009A 5%

3
4
5

Page 1 of 4

Date:

Document No.
FCIPL/PM/F/002

DPR

PUNJ LLOYD SDN BHD.


Tank Pad Construction Works - Daily Construction Report
ACTIVITY

UOM

Scope

Previous

Progress Date : 4-Apr-16


Reporting Date : 3-Apr-16
Today's
Progress

Cumulative

Tank Pad Construction Works at RAPID TANK FARM PROJECT


TANK No. : 5110-T-001B

Civil
Excavation

1329.520

TANK No. : 5110-T-001A

Civil
Excavation

Page 2 of 4

864.20

66.48

930.680

3 OF 4

Site Equipment/Machinary Details

312321442.xlsx

25 ton
compactor

Plate
compactor

Piling Rigs

10 TRoller

Dumper

Excavator
7

Dozer

Numbers

Light Vehicle

Equipment/Machinary

JCB

In-Direct Manpower

Equipment

MAN-DAY

312321442.xlsx

Project
Coordinator
1

Excavator
Operator

General
Worker

16

Banksman

Surveyor

Rigger

QS

Light Vehicle
Driver

HSSE Manager

Site Engineer

Surveyor

Sr. Designer

Mason

Lead Planner

Construction
Manager
Rigger

Project
Manager

Designation
Foreman

Direct Manpower
Project
Director

MAN-DAY

Backhoe
Operator

Designation

Site Manpower Details


4 OF 4

In-Direct Manpower

Manpower Status