JO

Project: 2 x 250, MW Thermal Power Plant

OWNER: BECL

Description:AUXILLARY STEAM PIPING TO TURBINE GLAND SEALING


WELDING ELECTRODE & FILLER : 70S 2 +7018-1
Joint No.

Sr.
No.

ID

Size

FITUP

No

Joint
Type

Material
Specification

DIA

THK

ASP-TGS

21

SA106GRC

88.9

5.49

12/10/2014

ASP-TGS

22

SA106GRC

88.9

5.49

12/10/2014

ASP-TGS

23

SA106GRC

88.9

5.49

12/10/2014

ASP-TGS

24

SA106GRC

88.9

5.49

12/11/2014

ASP-TGS

25

SA106GRC

88.9

5.49

2/15/2015

ASP-TGS

26

SA106GRC

88.9

5.49

12/11/2014

ASP-TGS

27

SA106GRC

88.9

5.49

2/15/2015

ASP-TGS

28

SA106GRC

88.9

5.49

12/11/2014

ASP-TGS

29

SA106GRC

88.9

5.49

12/11/2014

10

ASP-TGS

30

SA106GRC

88.9

5.49

2/15/2015

Fitup Date

UBEL

BHEL

BECL

11

ASP-TGS

31

SA106GRC

114

5.49

12/11/2014

12

ASP-TGS

32

SA106GRC

88.9

5.49

2/15/2015

13

ASP-TGS

33

SA106GRC

88.9

5.49

12/11/2014

14

ASP-TGS

34

SA106GRC

88.9

5.49

2/13/2015

15

ASP-TGS

35

SA106GRC

88.9

5.49

2/13/2015

16

ASP-TGS

36

SA106GRC

88.9

5.49

2/13/2015

17

ASP-TGS

37

SA106GRC

88.9

5.49

2/13/2015

18

ASP-TGS

38

SA106GRC

88.9

5.49

2/13/2015

19

ASP-TGS

39

SA106GRC

88.9

5.49

2/13/2015

20

ASP-TGS

40

SA106GRC

88.9

5.49

2/2/2015

UBEL
NAME
SIGNATURE
DATE

JOINT HISTORY SHEET


Client : BHEL

Contractor: UBEL
Drawing No: 1-80-349-18331

PREHEAT TEMP : 100C

WELDING PROCESS: GTAW + SMAW


Radiography Test

WELD VISUAL
Welder No.

Welding Date

W-05

12/12/2014

W-05

12/12/2014

W-05

12/12/2014

W-05

12/13/2014

W-11

2/16/2015

W-05

12/12/2014

W-11

2/16/2015

W-05

12/12/2014

W-05

12/12/2014

W-11

2/16/2015

UBEL

BHEL

BECL

REP NO-1

Report Date

Result -1

REP NO-2

Report Date-2

Result-2

W-05

12/12/2014

W-11

2/16/2015

W-05

12/12/2014

W-11

2/15/2015

W-11

2/15/2015

W-11

2/15/2015

W-11

2/15/2015

W-11

2/15/2015

W-11

2/15/2015

W-11

2/4/2015

BHEL

BECL/TCE

WPS NO:1003
REPORT NO:

ELDING PROCESS: GTAW + SMAW


Radiography Test
UT Report No. &
Date

Result

PWHT
Report
No.

PWHT Date

Remarks

DELETED

BECL/TCE

JO
Project: 2 x 250, MW Thermal Power Plant

OWNER: BECL

Description:AUXILLARY STEAM PIPING TO TURBINE GLAND SEALING


WELDING ELECTRODE & FILLER : 70S 2 +7018-1
Joint No.

Sr.
No.

ID

Size

FITUP

No

Joint
Type

Material
Specification

DIA

THK

EXT-LPH1

J021

SA106GRC

609.60

9.53

7/11/2014

EXT-LPH1

J022

SA106GRC

609.60

9.53

7/11/2014

EXT-LPH1

J023

SA106GRC

813.00

10.00

7/13/2014

EXT-LPH1

J024

SA106GRC

813.00

10.00

7/13/2014

EXT-LPH1

J025

SA106GRC

813.00

10.00

7/14/2014

EXT-LPH1

J026

SA106GRC

813.00

10.00

7/8/2014

EXT-LPH1

J027

SA106GRC

813.00

10.00

7/16/2014

Fitup Date

UBEL

BHEL

BECL

EXT-LPH1

J028

SA106GRC

813.00

10.00

7/16/2014

EXT-LPH1

J029

SA106GRC

813.00

10.00

7/18/2014

10

EXT-LPH1

J030

SA106GRC

813.00

10.00

7/18/2014

UBEL
NAME
SIGNATURE
DATE

JOINT HISTORY SHEET


Client : BHEL

Contractor: UBEL
Drawing No: 1-80-330-17947

PREHEAT TEMP : 100C

WELDING PROCESS: GTAW + SMAW


Radiography Test

WELD VISUAL
Welder No.

Welding Date

W-06

7/12/2014

W-06

7/12/2014

W-06

7/14/2014

W-19

7/14/2014

W-06

7/16/2014

W-06

7/9/2014

W-06

7/18/2014

UBEL

BHEL

BECL

REP NO-1

Report Date

Result -1

7/10/2014

ACC

REP NO-2

Report Date-2

Result-2

W-06

7/18/2014

W-06

7/20/2014

W-06

7/20/2014

BHEL

BECL/TCE

WPS NO:1003
REPORT NO:

ELDING PROCESS: GTAW + SMAW


Radiography Test
UT Report No. &
Date

Result

PWHT
Report
No.

PWHT Date

Remarks

BECL/TCE

JO
Project: 2 x 250, MW Thermal Power Plant

OWNER: BECL

Description:EXTRACTION STEAM TO LP HEATER 3


WELDING ELECTRODE & FILLER : 70S 2 +7018-1
Sr.
No.

Joint No.

Joint
Type

Material
Specification

ID

No

EXT-LPH3

01

EXT-LPH3

02

EXT-LPH3

Size

FITUP
Fitup Date

DIA

THK

UBEL

SA106GRC

508.00

12.70

7/7/2014

SA106GRC

508.00

12.70

7/7/2014

03

SA106GRC

508.00

12.70

7/7/2014

EXT-LPH3

04

SA106GRC

508.00

12.70

7/6/2014

EXT-LPH3

05

SA106GRC

508.00

12.70

7/9/2014

EXT-LPH3

06

SA106GRC

508.00

12.70

7/9/2014

EXT-LPH3

07

SA106GRC

508.00

12.70

7/9/2014

EXT-LPH3

08

SA106GRC

508.00

12.70

7/10/2014

EXT-LPH3

09

SA106GRC

508.00

12.70

7/11/2014

BHEL

BECL

10

EXT-LPH3

10

SA106GRC

508.00

12.70

7/11/2014

11

EXT-LPH3

11

SA106GRC

508.00

12.70

7/11/2014

12

EXT-LPH3

12

SA106GRC

508.00

12.70

7/7/2014

13

EXT-LPH3

13

SA106GRC

508.00

12.70

7/7/2014

14

EXT-LPH3

14

SA106GRC

508.00

12.70

7/7/2014

15

EXT-LPH3

15

SA106GRC

508.00

12.70

7/8/2014

16

EXT-LPH3

16

SA106GRC

508.00

12.70

7/2/2014

17

EXT-LPH3

17

SA106GRC

508.00

12.70

7/9/2014

18

EXT-LPH3

18

SA106GRC

508.00

12.70

7/9/2014

19

EXT-LPH3

19

SA106GRC

508.00

12.70

7/3/2014

20

EXT-LPH3

20

SA106GRC

508.00

12.70

7/3/2014

21

EXT-LPH3

21

SA106GRC

508.00

12.70

7/3/2014

UBEL

NAME
SIGNATURE
DATE

JOINT HISTORY SHEET


Client : BHEL

Contractor: UBEL
Drawing No: 1-80-332-18265

PREHEAT TEMP : 100C

WELDING PROCESS: GTAW + SMAW


Radiography Test

WELD VISUAL
Welder No.

Welding Date
UBEL

W-19

7/7/2014

W-19

7/7/2014

W-19

7/10/2014

W-19

7/12/2014

W-19

7/13/2014

W-06

7/13/2014

W-19

7/21/2014

W-06

11/29/2014

W-19

7/5/2014

BHEL

BECL

REP NO-1

Report Date

Result -1

7/10/2014

ACC

REP NO-2

Report Date-2

Result-2

W-06

7/14/2014

W-06

7/12/2014

W-06

7/9/2014

W-06

7/11/2014

W-19

7/4/2014

W-06

7/11/2014

W-06

7/10/2014

W-19

7/4/2014

W-06

7/9/2014

W-19

7/7/2014

W-19

7/7/2014

W-19

7/7/2014

BHEL

96

12/8/2014

ACC

7/10/2014

ACC

BECL/TCE

WPS NO:1003
REPORT NO:

ELDING PROCESS: GTAW + SMAW


Radiography Test
UT Report No. &
Date

Result

PWHT
Report
No.

PWHT Date

Remarks

BECL/TCE