Project Charter:
Custom House
Eric Hunt, Elise Hodges, Peter Hsiao, Vicky Hsu, Mia Quinn
Table of Contents
Introduction....................................................................................................................................2
High Level Project Purpose/Justification..............................................................................................................2
Project Scope.........................................................................................................................................................2
Key Stakeholders...................................................................................................................................................2
Project Budget/Cost...............................................................................................................................................3
Project Timeline....................................................................................................................................................3
Milestones & Delieverables..................................................................................................................................3
Approvals..............................................................................................................................................................3
Scope Statement.............................................................................................................................4
Scope of this Project..............................................................................................................................................4
Solution Overview.................................................................................................................................................4
Project Deliverables Overview & High Level Milestone Plan............................Error! Bookmark not defined.
Assumptions..........................................................................................................................................................5
3
Project Name: Custom House
Project Sponsor: Shawn Alborz.
Project Manager: Eric Hunt. Peter Hsiao. Vicky Hsu. Mia Quinn. Elise Hodges.
Introduction
High Level Project Purpose/Justification
Our purpose as the developer is to create a model home that provides spacious home designs
with high quality workmanship, energy saving construction and state-of-the-art architectural
designs for comfortable family living.
Project Scope
The scope of this project is a two story home with a wooden foundation (upper, cement as a
base) and stone walls. The timeline for it is 3 months and the projected Contractor cost is 1520%of the total Production Cost. Upon completion, the new property will include the following
as described in the listed specifications.
Lot size 1 acre
Energy efficient lighting
4800 sq/ft
Walk in closets
Two Story
State-of-the-art appliances
4 Bed
Granite Kitchen Counter Tops
3 Bath
Marble Bathroom Counter Tops
Fully Landscaped
Intercom system
Pool
Cable/Internet Ready
Hardwood Floors
Project Requirements
The house must be within 4800 square feet. The master bedroom will be 16x16 square ft, and the
other two will be 10x10 square ft. Kitchen, laundry room, and bathrooms will be fully appliance
with state-of-the-art equipment. Backyard will have an in-ground swimming pool along with a
patio. Front and backyard will be fully landscaped. There will be tile and wood floors throughout
the home, marble countertops in the bathroom and granite in the kitchen. This project has an
Expenditure of 300,000 dollars and must be built within 3 months of the start of project.
Key Stakeholders
The Key Stakeholders are listed below.
Construction
Architect
Shawn (sponsor)
Vendors
Suppliers
Government (monitoring water and drainage provision)
Homeowners association
Project Budget/Cost
The budget is $300,000.
Project Timeline
The project must be completed within three months of the initial start date. The following
includes a more detailed breakdown.
Week 1
Site
Preparation
Week 2-5
Footing
Foundation
and Framing
Week 6-8
The Guts:
Heating and
Cooling
Systems,
Insulation,
and Electrical
Week 9-11
Flooring and
Paint
Week 12
Fixture and
Appliances/final
Touches
As described above there is a three month time limit and the milestones and deliverables are as
follows in the table below.
Milestones
Blueprint
Foundation
Construction
Completion
Acceptance Review
Approvals
Project Sponsor Name and Signature:
Project Manager Name and Signature:
Deliverables
Completed and Approved
Footings Poured and Set
Foundation poured, block construction
complete, foundation set
Home and Garage exterior closed to
weather
Driveway and Landscape complete
Interior and exterior wiring complete
Drywall and Insulation added
Flooring installed
Interior and exterior plumbing complete
Interior and exterior painting and finish
complete
Walk through complete
Pass regulatory inspections
Approval signatures obtained
Scope Statement
Scope of this Project
The scope of this project is a two story home with a wooden foundation (upper, cement as a
base) and stone walls. The timeline for it is 3 months and the projected Contractor cost is 1520%of the total Production Cost. Upon completion, the new property will include the following
as described in the listed specifications.
Solution Overview
We are building the model home for the developer with the above specifications.
The chart below explains the different deliverables of our project and what falls
underneath each deliverable.
Custom
Home
Foundati
on
Blueprint
Attain
Permits
Complet
ed &
Approve
d
Footings
poured &
set
Home &
Garage
exterior
closed
Acceptan
ce
Review
Completi
on
Foundati
on
poured &
set
Drivewa
y&
Landsca
pe
Interior
&
exterior
wiring
Construc
tion
Drywall
&
insulatio
n added
Pass
Inspectio
ns
Walk
through
Flooring
installed
Interior
&
exterior
plumbin
g
Interior
&
exterior
painting
& finsh
Approval
Signatur
es
obtained
House
Complet
ed
Key Milestones
Blueprint
Foundation
Construction
Flooring
Completion
Walk through
Pass inspections
Acceptance Review
Approval Signatures
Target Date
January 1-7
January 7,
2015
January 7-31
January 17,
2015
January 31,
2015
February 1-March 15
February 11,
2015
February 18,
2015
February 23,
2015
March 1, 2015
March 7, 2015
Assumptions
In the project scope we are assuming that:
Materials will be readily available
Everything not included in the scope will not be a part of the project
Workers will work all their scheduled shifts
Employees will not go on vacation during the length of the project