Professional Documents
Culture Documents
PCC Poles Manufacturing Cost
PCC Poles Manufacturing Cost
Cement
Stone Chips
Sand
Earth Wire
Hardwood
Water
Electricity
Labour
Staff Cost
Other Cost
Monthly Rent
Other Increamental Chrg
Labor
Profit
Total
9.50 Kg
70.00 Kg
5.50 CFT
4.00 CFT
0.80 Kg
25.00 Per Nos
270.00
36.4 Per
5.4 Per
23 Per
33 Per
58 Per
Kg
Kg
CFT
CFT
Kg
Approx
Total
345.80
378.00
126.50
132.00
46.40
7.00
1035.70
18%
186.43
10%
103.57
1325.70
100
1460
1360
1333.333