Download as pdf
Download as pdf
You are on page 1of 6
exo | Submission Date| Revi Details | Prepared By | Reviewed By | DAR PETROLEUM OPERATING COMPANY LIMITED. CORPORATION 005 CONTRACT No: DPOC/23/13-1193 PALOCH FPF DE-BOTTLENECKING PROJECT TIE-IN METHOD STATEMENT FOR FLANGED FACE AND SCREWED TIE-IN JOINTS REVISION RECORD CHINA PETROLEUM, DOCUMENT No.: ENGINEERING & CONSTRUCTION | DPOC-1193-PR-PIP- a | 2160603 T ‘Sibi for Approval] Blsmaniandin | Wang Boming inde, Tian f [METHOD OF STATEMENT (EET Face FOR PALOCH “SunCR, EM MERTOD STATIN —| occamacr ne Fonianceo enckano scrswen rican | DOCUMENT: Jom CONTENTS 1, DESCRIPTION. 2. RESPONSIBILITY. 24 Construction Manage. 22 QAIQC Engineer. 23. HSE Engineer 3. THEAN PLAN DETAILS. 4, TIE-IN METHOD STATEMENT: 4.1 Steps for flanged face tein jit. 4.2 Stop for serewed type tei 5. SAFETY: Le Se EE yomnrs. procsrisiemeons 1. DESCRIPTION ‘This Method Statement is generated to ensure that the TIE-IN works eatied out and comply with engineering design and standatd ofthe projet. And it also covers al tie-in schedule and detaled method statement 2. RESPONSIBILITY 2.4 Construction Manager > The constriction manager shall be responsible fr the provision ofall resoures for this job, He shall be responsible forthe management of HSE during installation operation and censure that experienced and qualified personnel are involved inthe execution of TIE-IN work at site He shall ensure the job i completed timely > He shall lisse with QAIQC department to facilitate witness point and hold point inspection by OWNER. 22 QAIQC Engineer > QA/QC and mechanical engner shall interpret the drawing related to the scope af work, supervises the site measurement, setting out control > tis a responsiblity of QA/QC personnel and mechanical engineer to ensure accuracy of| the location of TIE-N, Review each Tie-n schematic location on P&ID Review Piping Process & Piping Design “Mark or tag the selected Tie-In point. Draw sketch and take all requized measurements yryyy Determine locations of al exiting block valves, vents and deans > Detemnine the location ofall existing anchors and guides, Get plant personnel to sign off on all data collected in the fil. 23. HSE Engineer > HSE manager should be available wth full PPE sand fllow HSE regution as mentioned below. > Work pent should he available before starting the work > Safety engineer should teach about the work and safety procedures to all the teen team people. LU ana On DEVEEARAT =r Sp bop ee ef = == “ aap SO" UNE ‘ryPE_| vown | REMAI : ‘ree PID-2104-01 ‘4OS-40F-ET | 3108 RHE nw “oO more PID2160-01 AAG | oy a NO Pip-2102-01 | 2teso3KH-EY | s1ezeIeHET 7 NO Pip-2i7001 | 9013 30101 as yes pip-2170.01 | 9013 soma me ves Pip-2171-01 4100 NO 10 [mara | Poze [neraner [nossnrcr | = | ¥0 [rears | Maoaistor [2 | Sao sex | xo 2} ram | oaaa |*2B2 Lan sexo | 60 wo | Trap vooken Ans ‘on sceo | No. Pup2i6m02 — | 64591 4250, sero | No i 8 | apzin.a | 7OWAC- 34400 ScRD | NO . FP—Tieinby flange 'SCRD Tren by seo enon or stareweNt Protec Yom eaten ds RCT TEN METRO STATERENT |” occ A FourataraeasosneweD MeN | eas 4. TIE-LN METHOD STATEMENT: ‘The below documents shall be obeyed forthe Tie-In work, + Tesi Identification Number + Tien Procedure -DPOC-1193-PR-GEN-004, ‘+ Ewisting Line / Equipment Number #P&1Diagram «+ Related piping drawing. ‘© Now Line and isometric number. + Tien type and size 4.1 Steps for anged face tien joint « Identity the tein point a por the existing drawings. + Install te seafTaldings and remove the insulatons om the tie-in point with the permission «+ Put the valve t closed position of tein, and then remove the blind flange from the tien point and ensure no any leakage ocur + Connect the new header of tien spool as per design. + Clean both side of anges properly «+ Tiesin with existing valve by flange, gasket and corresponding bolts. + Before tightening dae bot, ensure the tightening range and apply proper tightening, + Recover the insulation at required area, ‘+ Remove seafoldings and clean the ste 42 Step for serewed type tie-in joint. + ent the tie-in point as per the existing drawings. «ntl he scffoldings and remove the insulatons on the tie-in point with the permission, + Put the valve at closed position of tein and then remove the blind or end cape rom the tien poin and ensure no any leakage cur. «+ Prepare the new branch of tesn as per design. «Tien with existing valve by threaded coupling with proper sealing agent. Tigh the threaded coupling as per required range «Recover the insulation at required are, “+ Remove scafoldings and clean the ste hoe ee jon S08 5. SAFETY: > Tien team should give the more importance of HSE conditions ad safety procedure. > HSE engineer should aware ofjob risk analysis. > Allteam shouldbe with involvement to the work without mental deviation. > All team members shall know the work sequence and safe operation with proper guidance > Technicians shall operate or bane the special components and valve properly. > Work permit should be available before starting the work > Firefighting system shall be kept near the working area > All workmen and sta should wear safety shoes and safety helmet. > Safety belt shall be providing tothe work men for working in higher elevation. > All workmen should wear safety hand gloves and safety gogales > Ensure that al iting tools and machineries in a good condition.

You might also like