This presentation and its enclosures and appendices has been prepared by Heerema Fabrication Group exclusively for information purposes.
Recipients of this presentation may not reproduce, redistribute or pass on, in whole or in part, the presentation to any other person without any approval
of Heerema Fabrication Group.
Why do we go Offshore?
Why do we go Offshore?
Living Q
Drilling
Topside
Jacket
Foundation
Type of Structures
Tubular structure
Founded with open steel tubular piles
Water depth 30 200 m (max 400m)
Tubular structure
Founded with open steel tubular piles
Water depth 30 200 m (max 400m)
waves)
Tubular structure
Founded with open steel tubular piles
Water depth 30 200 m (max 400m)
period
Compliant towers
Tubular structure
Founded with open steel tubular piles
Water depth up to 600 m
Compliant towers
Tubular structure
Founded with open steel tubular piles
Water depth up to 600 m
Installed by Launch
Topside by Lifting or Float-over
Compliant towers
Tubular structure
Founded with open steel tubular piles
Water depth up to 600 m
Installed by Launch
Topside by Lifting or Float-over
Natural period >> Wave period (high energy
waves)
Deflections up to 3 m at deck level
Wave spectrum
period
Gravity Base
Gravity Base
Floating structure
Pre-tensioned to the foundation to reduce
movements
Sensitive to topside load fluctuations
Floating structure
Pre-tensioned to the foundation to reduce
movements
Sensitive to topside load fluctuations
Water-depth up to 1500 m
Ursa TLP
1195 m
Eiffel Tower
300 m
Floating structure
Pre-tensioned to the foundation to reduce
movements
Sensitive to topside load fluctuations
Water-depth up to 1500 m
Installed by Floating
Floating structure
Pre-tensioned to the foundation to reduce
movements
Sensitive to topside load fluctuations
Water-depth up to 1500 m
Installed by Floating
Wave spectrum
period
SPAR
SPAR
SPAR
Wave spectrum
period
FPSO
Shipshape floating
Held in position by a Mooring
Used for processing and storage
Subsea development
Subsea development
Installation
Before
After
After
Before
Temporary conditions
Load-out
Transport
Installation
Removal
In place Strength
In place Fatigue
Accidental Boat impact
Temporary Lift and Transport
Dutch .achievements
Heerema Marine Contractors
HMC World Leader T&I Contractor
Fixed Platforms and
Facilities Development
Floating Facilities
Subsea Infrastructure
and Pipelines
36
Dutch .achievements!
Heerema Fabrication Group
HFG EPC Contractor
Engineering
Jackets
Topsides
Oil&Gas / Renewables
On-Shore facilities
Thank you