Download as pdf or txt
Download as pdf or txt
You are on page 1of 9

Proposed Zoning Changes

M-NCPPC

Draft Concept Framework Plan (1.21.15)

M-NCPPC

Updated Concept Framework


A Wider Circle property
changed from mixed use
back to industrial

Stewart Ave connection


across tracks to Brookville
Rd changed to ped/bike

All connections around


Park changed to ped/bike
Allow for future mixed
use Floating zoning
option at owners request
once Purple Line is
Constructed

Land swap at south end


of Park removed

Quinton Rd connection
removed

M-NCPPC

Public Space Improvements

Stewart Ave connection


across tracks to Brookville
Rd changed to ped/bike
All connections around
Park changed to ped/bike

Land swap at south end


of Park removed
Quinton Rd connection
removed

M-NCPPC

Bikeway Concept

M-NCPPC

Woodside/16th Street Station Area


Existing Zoning

M-NCPPC

Proposed Zoning Changes

Residential Area
Existing Zoning

M-NCPPC

Proposed Zoning Changes

Brookville Rd/Lyttonsville Station Area


Existing Zoning

M-NCPPC

Proposed Zoning Changes

Industrial/Institutional Area
Existing Zoning

M-NCPPC

Proposed Zoning Changes

You might also like