Professional Documents
Culture Documents
Brigada Forms 2015
Brigada Forms 2015
SCHOOL ID:
SCHOOL ADDRESS:
(Please Check appropriate box)
Elementary )
Secondary
SCHOOL HEAD:
CONTACT NUMBER:
PTA PRESIDENT:
CONTACT NUMBER:
A. SCOPE OF REPAIR AND MAINTENANCE WORK COMPLETED BASED on SIP & DepEd Memo No. 41,
2015, Annex C (all accomplishments supported with pictures) (Please check appropriate column)
What was done?
Equipment
New
Construction
Replaced
1. Roofs/rain gutter
2. Walls/Ceilings
3. School Building Directory
4. Windows and Doors
5. Chairs/Desks Tables, and Blackboards
6. Comfort Rooms
7. Leaking Pipes
8. School Grounds/Landscaping
9. School Signs/signages
10. Electrical
11.Fire extinguisher (suspended outside)
12. School free from any sharp objects
13.Prepare directory of identified classroom
for evacuation
14. Drainage
15. Signages for on-going
construction/condemned buildings
16. Exit plan/signage of high story building
17 Post directory of emergency contact
18. Establish early warning devices in case of emergency
19.
20.
21.
22.
Total
G. ISSUES AND CONCERN (Describe briefly problems encountered and how resolve)
J. EVIDENCES / ATTACHMENTS
a. Photos (before, during and after
b. Photocopy of all completed BE forms:
1. Form 01 3. Form 03 5. Form 05
2. Form 02 3. Form 04 6. Form 06
J. EVIDENCES / ATTACHMENTS
a. Photos (before, during and after
b. Photocopy of all completed BE forms:
1. Form 01 3. Form 03 5. Form 05
2. Form 02 3. Form 04 6. Form 06
Prepered by:
____________________________________
Name of School Head with Signature
Date:
_________________
and
Designation
Submit this Report to Division Office on or before June 19, 2016 (Two (2) Folders)
___________
OL ID:
ACT NUMBER:
ACT NUMBER:
epEd Memo No. 41, s.
propriate column)
Replaced
Repaired
Repainted
ded)
Estimated Cost
Others
olunteers
Day
Day
3
4
ts, if needed)
Total Number
of Hours
Rendered
Day
5
Day
6
Total
Total Estimated
Costs
solve)
ers)
Date:
___________________