Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Drilling Courses (January - May 2015)

Duration
(hours)

Dates

Fees
(TND)

Introduction to Petroleum Upstream

22 January, 2015

150

Fundamentals of Petroleum Geology + geological field


visit

24

From 23 to 26 January,
2015

600

Geophysics Overview

27 January, 2015

150

Reservoir Rocks and Fluid Properties

18

From 28 to 30 January,
2015

450

Pre-drilling Operations

3 February, 2015

150

Drilling Rig Components, Rig Sizing and Specification

18

Conceptual Well Design

18

Drill String and Down Hole Tools

12

Drilling Fluids and Solid Control

24

Drill Bits and Drilling Parameters

24

Casing and Cementing

18

Wellhead Equipment

12

Logging Operations

12

Well Control

24

Directional Drilling

21

Drilling Problems: Prevention and Solving

18

From 8 to 10 April, 2015

450

Underbalanced Drilling / Coiled Tubing Drilling

12

From 13 to 14 April, 2015

300

Drilling Special Operations (Drill Stem Test, Coring, Well


Abandonment Slimhole Drilling)

18

From 15 to 17 April, 2015

450

Offshore Drilling

15

From 27 to 17 April, 2015

375

Well Completion and Servicing

24

From 21 to 29 April, 2015

600

HSE Management & Risk Assessment Analysis

18

From 6 May and 8 May,


2015

450

Well Budget Evaluation/AFE

12

30 April and 1 May, 2015

300

2 weeks

From 13 May and 30May,


2015

Modules

Drilling Project (Well Architecture, Casing Calculations,


Fluids and Cementing Design, Chronology of Operations,
Presentation to a jury)
TOTAL

From 4 to 6 February,
2015
From 9 to 12 February,
2015
From 12 to 14 February,
2015
From 17 to 21 February,
2015
From 24 to 27 February,
2015
From 4 to 6 March, 2015
From 10 to 11 March,
2015
From 12 to 13 March,
2015
From 24 to 27 March,
2015
31 March, 1 April and
From 3 to 4 April, 2015

450
450
300
600
600
450
300
300
600
525

360 hours
+ 2 weeks project

Information and registration : Montassar 27 117 117

You might also like