Professional Documents
Culture Documents
Meter Testing Calibaration
Meter Testing Calibaration
Meter Number
Input Box
Show button
Save Button
Process : while saving the record Update the test date in meter stock test
date column
And save the record in Newly created table
Populate above 4 fileds and maintain meter number ID in Meter
table column.