PROJECT:

Water Supply System

LOCATION:

Don Ramon Roces Elementary School, Puerto Princesa City, Palawan

SUMMARY OF DETAILED ESTIMATE

ITEM NO.

ACTIVITY

UNIT

QTY

Clearance of the Site

L.S.

Excavation

cu.m

20

Installation of Pipes and Gate Valves

1 1/2" dia. PPR

pcs.

49

2" dia. PPR

pcs.

33

2" dia. PPR Elbow

pcs.

1 1/2" dia. PPR Tee

pcs.

2" dia. PPR Tee

pcs.

Teflon Tape U.S.A 3/4"

pcs.

10

Water Meter

pcs.

Gate Valve 2" Meco

pcs.

200cc Atlanta Solvent Cement

cans

10

1 1/2" x 2" Coupling Reducer

pcs.

2" dia. P.B Tubing

1m

97.8

# 120 Water Proof Sand Paper

pcs.

10

Total Material Cost:

30 % Labor
10% Contigency

TOTAL COST:

Back fill

cu.m

15

OVER ALL COST :

y, Palawan

TIMATE

TOTAL AMOUNT

UNIT COST

1500

1500

125

2500

202.8

9937.2

242

7986

98.2

392.8

100.3

300.9

160.1

160.1

25

250

1500

1500

415

415

150

1500

56

504

15

1467

15

150

24563

7368.9
2456.3

34388.2

66

OVER ALL COST :

990

39,378.20