Halfaya Oil Field Surface Facility Phase 3 Project

PetroChina
Halfaya

DOC.NO.: HFY3-3125-CIV-TQ-0003

Page 1 / 2

Technical Query
: GTH
: PetroChina International Iraq FZE
Iraq Branch
Reference : HFY3-SD-CIV-DW-01108/01110,
AASHTO
From
To

Contract No.
Attention
Issued Date
Discipline

:
:
:
:

HFY-CON/F&C0592-0616
PMT/PMC
2/Apr/2015
CIV

Subject: CLARIFICATION FOR CULVERT


CONTRACTOR
Description:
There is discrepancy in the statement of notes in the reference drawings, where it states 140 kN and 280 kN
(different value in different notes) as concentrated load induced from vehicle for culvert slab design. Our
understanding is that, wheel load corresponding to 140 kN shall be applicable for design purpose, whereas
AASHTO shows a maximum wheel load of 16 kip = 71 kN for class H20-44 loading (Please refer attachment
1 ) . Please advise if our understanding is correct / advise otherwise.
Affected Disciplines:
HSE

Process

Plot Plan

Mechanical

Instrument

Electrical

Piping

Civil/Structure

Affected Document/Drawing:

HFY3-SD-CIV-DW-01108/01110

Where is the attachment? To be enclosed with TQ.

Recommended Solution:
----------

Indicate potential impact: NO


SOW Change

Cost

Schedule

Re-Hazop If Yes, need Project Change Order Request

Originator
Print Name

Discipline Lead

Ariffin Musa

Project Manager

Ariffin Musa

Signature
04/04/2015

Date

04/04/2015

CUSTOMER
PMT/PMC Comment:
To be resubmitted.

Confirm if project scope, cost or schedule affected?


Change Request required

Yes

No

Proceed with Modification

Yes

No

Discipline
Print Name

Ariffin Musa

Yes

If Yes, implement Change Order Procedure

Engineering Manager
Ariffin Musa

Signature
Date

04/04/2015

No

04/04/2015

Project Manager