Presentation of Liuming Jing #75
Voltage rise:
The big issue when connecting DG to
distribution system

Reference papers

1. Voltage rise -the big issue when connecting embedded


generation to long 11KV overhead lines.

2. Optimal Decentralized Voltage control for distribution


systems with inverter based distributed generators

Problem
Reference paper: Voltage rise -the big issue when connecting embedded generation to
long 11KV overhead lines.
The connection of a generator to an 11KV overhead line causes an excessive voltage rise,
there are several techniques that can be employed to alleviate the situation, for example:
1.Reduce the primary substation voltage
2.Allow the generator to import reactive power
3.Install auto transformers
4.Increase the conductor size
5.Constrain the generator at times of low demand

How to solve the problem


Reference paper: Optimal decentralized voltage control for distribution systems with
inverter-based distributed generators.