Acceptance Report GPR6879 3G

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 15

SITE NAME GPR6879

SINGLE SITE ACCEPTANCE REPORT

SITE ON AIR DATE


DRIVE TEST DATE

7 Feb 2016

DRIVE TESTER NAME:

Shahrukh Hussain

REPORT PREPARED BY:

Nadir Khan

REPORT CHECKED BY:


SUBMISSION DATE:

10 Feb 2016

Table of Contents
1

INTRODUCTION.....................................................................................................................................3
1.1
1.2
1.3
1.4
1.5
1.6
1.7

AREA AND SITE OVERVIEW.................................................................................................................3


SITE INFORMATION DATA....................................................................................................................3
CELL INFORMATION DATA...................................................................................................................4
ALARMS CHECK..................................................................................................................................4
TRANSMISSION CHECK.......................................................................................................................4
FEEDER SWAP CHECK.........................................................................................................................4
SERVICES ACCESSIBILITY CHECK.......................................................................................................5

SUMMARY OF EVENTS:.......................................................................................................................5
2.1

CS SERVICES.......................................................................................................................................5

New BTS Site Integration Drive Test Report Template

2.2
3

PS SERVICES.......................................................................................................................................5

RADIO DESIGN PERFORMANCE CHECKS.....................................................................................6


3.1

COVERAGE PERFORMANCE SCANNER MODE...................................................................................6

Geographical View of the Drive Test with Legends..................................................6


Bar Charts of Legends.........................................................................................................6
3.2
QUALITY PERFORMANCE SCANNER MODE (EC/IO).........................................................................7
23.1
Geographical View of the Drive Test with Legends..................................................7
23.
Bar Charts of Legends.........................................................................................................7
BEST SERVER PLOT........................................................................................................................................8
23.
Geographical View of the Drive Test with Legends (SCANNER SC PLOT).......8
13.
13.2

HANDOVER PERFORMANCE:...........................................................................................................8
4.1
4.2
4.3
4.4
4.1

HANDOVER PERFORMANCE WITH IN SAME SITE...............................................................................8


HANDOVER PERFORMANCE ON DIFFERENT SITE................................................................................9
HANDOVER PERFORMANCE ON 2G (IRAT HO).................................................................................9
DRIVE TEST 3G LOCKED LONG CALL RSCP PLOT.............................................................................9
DRIVE TEST 3G LOCKED LONG CALL ECNO PLOT...........................................................................10

PS DATA PERFORMANCE CHECKS................................................................................................10

Throughputs in Tabular Form.................................................................................................................10


6

OSS MONITORING KPIS....................................................................................................................11


6.1
6.2
6.3
6.4
6.5
6.6
6.7

TRAFFIC CS......................................................................................................................................12
PAYLOAD..........................................................................................................................................13
SOFT HANDOVER..............................................................................................................................13
CSSR CS..........................................................................................................................................14
CSSR PS...........................................................................................................................................14
IRAT HOSR CS...............................................................................................................................15
IRAT HOSR PS................................................................................................................................15

2016-04-30

Confidential

Page2, Total15

New BTS Site Integration Drive Test Report Template

1 Introduction
1

Area and site overview

Site information data

Region

South

RNC ID

405

Site Name

GPR6879

Longitude (Decimal)

69.0517

Site ID

6879

Latitude (Decimal)

28.1824

Cluster

ZTE_Cluster_7_Khandh Kot

RNC Version

2016-04-30

Confidential

Page3, Total15

New BTS Site Integration Drive Test Report Template

Cell information data


Elements

Cell Name

Sector 1

Sector 2

Sector 3

GPR6879A

GPR6879B

GPR6879C

Cell ID

16879

26879

36879

Frequency

10662

10662

10662

LAC / RAC

830/09

830/09

830/09

226
1

227
1

228
1

Primary Scrambling Code


Number of Carrier

Alarms Check

Frequency (Carrier)

Sector1 CI

Alarms
type

Sector2 CI

Alarms type

Sector3 CI

Alarms type

Remark

10662

XXXXX
X

No

XXXXX
X

No

XXXXX
X

No

No

Transmission Check
Site ID

Transmission State

Remark

6879

Up

Feeder Swap Check


Sector

Feeder Swap Verification

Sector 1

OK

Sector 2

OK

Sector 3

OK

Services Accessibility Check


Functionality

Sector 1

Sector 2

Sector 3

AMR Call

OK

OK

OK

Voice Call MOC and MTC per sector

OK

OK

OK

SMS Services

OK

OK

OK

Video Call

OK

OK

OK

Video Call MOC and MTC per sector

OK

OK

OK

R99 UL

OK

OK

OK

HSPA+

OK

OK

OK

HSUPA

OK

OK

OK

Soft HO

OK

OK

OK

IRAT HO (3G TO 2G)

OK

OK

OK

3G to 2G Reselection

OK

OK

OK

2016-04-30

Confidential

Page4, Total15

New BTS Site Integration Drive Test Report Template


2G to 3G Reselection

OK

OK

OK

2 Summary of Events:
1.1

CS Services

Servic
e

Terminal

Call
Attempts

Calls
Established

Call
Drop

Call
Block

Voice

MO

10

10

Voice

MT

10

10

Video

MO

10

Video

MT

10

1.2

Successful
IRAT HOs

SMS
Attempts

Successful
SMS

IRAT
HO
Attempts
10

10

10

10

10

10

10

10

10

NA

NA

NA

NA

10

NA

NA

NA

NA

PS Services

Service

PDP
Activation
Attempts

PDP
Activation
Success

PS Session
Successfully
Completed

PS
Drops
Number

PS
Sessions
Establishe
d
3

R99 UL

R99 DL

Successful IRAT
HOs (2G>3G/3G->2G)
(Value from Stats)
x/x

HO
Attempts
Softer/Sof
t
x/x

Successful
HOs
Softer/Soft

IRAT HO
Attempts (2G>3G/3G->2G)
(Value from Stats)
x/x

x/x

x/x

x/x

x/x

HSDPA/HSPA+

x/x

x/x

x/x

x/x

HSUPA

x/x

x/x

x/x

x/x

2 Radio design performance Checks


2.1

Coverage performance Scanner mode

2.1.1 Geographical View of the Drive Test with Legends


Drive Test Plots: RSCP
Scan

2016-04-30

Average (dBm)

-69 dBm

Confidential

Page5, Total15

x/x

New BTS Site Integration Drive Test Report Template

2.1.2 Bar Charts of Legends

2.2

Quality performance Scanner Mode (Ec/Io)

2.2.1 Geographical View of the Drive Test with Legends


Drive Test Plots: Ec/Io
Scan

2016-04-30

Average (dB)

-7 dB

Confidential

Page6, Total15

New BTS Site Integration Drive Test Report Template

2.2.2 Bar Charts of Legends

Best Server Plot

2.2.3 Geographical View of the Drive Test with Legends (SCANNER SC


PLOT)
Drive Test Plots: Best Server
Scan

2016-04-30

Confidential

Page7, Total15

New BTS Site Integration Drive Test Report Template

3 Handover Performance:
Handover Performed on other site

Sector-A

OK

OK

OK

OK

OK

OK

Sector-B
Sector-C

2.3

Target Cell

16846
26846
36846

Handover Performance With in Same Site


Direction
Clockwise
Anti-Clockwise

2.4

Handover Performed on same Site

Site ID

Softer Handover Performance on Same Site


Sector 1 & 2 in AS
Sector 2 & 3 in AS
OK
OK
OK
OK

Sector 3 & 1 in AS
OK
OK

Handover Performance on Different Site


SHO Performance

2016-04-30

Confidential

Page8, Total15

New BTS Site Integration Drive Test Report Template


Target CI

2.5

Sector 1

Sector 2

Sector 3

15003

35750

36846

Handover Performance on 2G (IRAT HO)


Sector 1
Target CI

2016-04-30

IRAT Handover Performance on 2G


Sector 2

16879

26879

Confidential

Sector 3

36879

Page9, Total15

New BTS Site Integration Drive Test Report Template

2.6

Drive Test 3G locked Long call RSCP Plot

Drive Test 3G locked Long call EcNo Plot

2016-04-30

Confidential

Page10, Total15

New BTS Site Integration Drive Test Report Template

3 PS Data Performance Check


Throughputs in Tabular Form
Sec 1

Sec 2

Sec 3

KPIs
PSR99
(Kbps)

HSUPA
(Mbps)

HSDPA/HSPA+

PSR99
(Kbps)

HSUPA
(Mbps)

HSDPA/HSPA+

(MBPS)

PSR99
(Kbps)

HSUPA
(Mbps)

HSDPA/HSPA+

(MBPS)

PDP context activation SR

100%

100%

100%

100%

100%

100%

100%

100%

100%

PS Drop rate

0%

0%

0%

0%

0%

0%

0%

0%

0%

Throughput UL (max)
Throughput UL (mean)
Throughput
DL (max)
Throughput
DL (mean)

4.2
3.7

4.2

4.4

3.6

3.7

(MBPS)

FTP server
HTTP server

11.6

11.2

11.3

4.7

3.2

4.3

FTP server
HTTP server

2016-04-30

Confidential

Page11, Total15

New BTS Site Integration Drive Test Report Template

1 OSS Monitoring KPIs


3.1

2016-04-30

Traffic CS

Confidential

Page12, Total15

New BTS Site Integration Drive Test Report Template

Payload

Soft Handover

2016-04-30

Confidential

Page13, Total15

New BTS Site Integration Drive Test Report Template

CSSR CS

CSSR PS

2016-04-30

Confidential

Page14, Total15

New BTS Site Integration Drive Test Report Template

IRAT HOSR CS

IRAT HOSR PS

2016-04-30

Confidential

Page15, Total15

You might also like