Download as pdf or txt
Download as pdf or txt
You are on page 1of 6

ASSIGNMENT 2

GROUP - 7
STRUCTURAL
DETIALING

3.2000

3.0000

3.0000

3.2000

3.5000

W1

F
W1

W2

3.5000

W2

W2

W2

W2

W2

3
3.0000

W2

3.5000

W2

W1

W1

GROUP ID'S
GROUP NO

FLOORS

G1

BASE, 1ST, 2ND, 3RD FLOOR

G2

4TH, 5TH, 6TH FLOOR

G3

7TH, 8TH , 9TH FLOOR

SCHDULE OF COLUMN AND SHEAR WALLS


LABEL

DESCRIPTION

GROUP

DETAILING ID

W1

SHEAR WALL

1,2,3

SHEAR WALL 1

W2

SHEAR WALL

1,2,3

SHEAR WALL 2

COLUMN

1,2,3

COLUMN 1

c/c spacing

c/c spacing
on each face

X
0.4500

2.5500

0.4500

on each face

ID - STRUCTURAL WALL 1
Plan Structural Detailing

c/c spacing

c/c spacing

on each face

Elevation of X-X Section


Shear wall : Span 3.45 m

ID -SHEAR WALL 1
All dimensions are in mm
Nominal cover = 40mm

M25 Concrete
Fe415 Steel

0.4500

2.7500

0.4500

0.4500

2.7500

0.4500

on each face

B
c/c spacing

c/c spacing

on each face

c/c spacing

0.4500

c/c spacing

on each face

X
on each face

3.0500

Fig1.Elevation of X-X Section


Shear wall : Span 3.65 m
0.4500

3.0500

0.4500

on each face

0.4500

Y
Fig.3.ID - STRUCTURAL WALL 2
Plan Structural Detailing
0.4500

c/c spacing

c/c spacing

ID -SHEAR WALL 2
on each face

Fig.2.Elevation of Y-Y Section


Shear wall : Span 3.95 m

All dimensions are in mm


Nominal cover = 40mm

M25 Concrete
Fe415 Steel

0.4500
0.4500

c/c spacing

0.4500

Fig.2.Section x-x of Column C

c/c spacing

ID -COLUMN 1
Fig.1.Elevation of Column

All dimensions are in mm


Nominal cover = 40mm

M25 Concrete
Fe415 Steel

1.5000
0.6000

0.4500

under each tie


0.4500

Pedestal
0.2000

at 150 mm spacing

1.5000
0.293

0.4500

0.3000
0.7000
1.5000

0.4340

PILE CAP
All dimensions are in mm
Nominal cover = 75 mm

M25 Concrete
Fe415 Steel

You might also like