Construction Project Management
Construction Project Management
Construction Project Management
MANAGEMENT
Presented By
Lal Sankar
Kiran Varghese K
R Sahadev
Nishanth R Babu
Jai Kishore Joshi
Chitrarth Moudgil
OVERVIEW
1.
2.
3.
4.
5.
6.
7.
8.
9.
Introduction
Steps In Project Management
Working With Project Teams
Project Initiation, Estimates & Budgeting
Project Planning & Scheduling
Construction Phase
Building Information Modeling
Case Studies
Project Management Software's
1. INTRODUCTION
Project Management Is Concerned With The Overall
Planning And Co-ordination Of A Project From
Conception To Completion Aimed At Meeting The
Stated Requirements And Ensuring Completion On
Time, Within Cost And To Required Quality Standards.
A project is a one-shot, time-limited, goal-directed, major
undertaking, requiring the commitment of varied skills and
resources.
Or
The art and science of coordinating people, equipment,
materials, money, and schedules to complete a specified
project on time and within approved cost.
FUNCTIONS OF MANAGEMENT
1.Planning
2. Organizing
3. Staffing
4. Directing
5. Controlling
3. PROJECT TEAMS
1. Each triangle in Figure
represents a team.
2. Regardless of the size
and number of teams,
there must be a single
head project manager to
make final decisions and
keep focus on the project.
CONFLICT MANAGEMENT
Due To The Dynamic Nature Of Project Environments,
It Is Inevitable That Conflicts Among Team Members
Will Arise.
Resolution of conflicts can lead to innovation and to
ideas about how to improve work efficiency.
DEVELOPING A CONSENSUS
6. CONSTRUCTION PHASE
The site management should be carried out through suitable site
organization structure with roles and responsibilities assigned to
the construction personnel for various construction related
functions. Safety management is one of the important
components of site management.
DURING THE TIME OF CONSTRUCTION:
TIME MANAGEMENT
Considering the importance of time in a project, it is desirable that
project is completed in the defined time schedule to get its fruitful
benefits. The system planned should cover total schedule of
completion with one or more construction agencies, number of
vendors, identification of total resources, timely availability of all
inputs, including critical ones, its processing during construction of
a project.
QUALITY MANAGEMENT
Quality of a project should be planned for all activities
from inception to completion. It is desirable that the
system planned gives adequate assurance and controls
that it shall meet project quality objectives. The system
shall cover review of existing requirements, subcontracting,
materials, processes and controls during
process, auditing, training of personnel, final inspection
and acceptance.
DESIGN PHASE
BIM allows a project team to make changes to the project at any
time during the design or documentation process without laborious,
low-value recoordination and manual checking work.
CONSTRUCTION PHASE
In the construction phase of the building lifecycle, BIM makes
available concurrent information on building quality, schedule, and
cost.
BIM also means that less time and money are spent on process and
administration issues in construction because document quality is
higher and construction planning better.
MANAGEMENT PHASE
BIM makes available concurrent information on the use or
performance of the building; its occupants and contents; the life of
the building over time; and the financial aspects of the building.
8.CASE STUDIES
1. BURJ AL ARAB
CONSTRUCTION TIME: 18 MONTHS
1.
2.
3.
4.
5.
6.
7.
8.
PHASE 2
Actual construction
it was all of the actual construction of the structure. The partners
used many new technologies to speed up construction and lower
the construction cost so the companies could earn more profit by
saving money in such places as labor and equipment
One new technology that was used was Cantilevers Top Climbing
Jump Form system for the main core area. Cantilever Pty Ltd,
Queensland, Australia designed and furnished the 300 ton
forming system.
The Forming A joint venture the companies undoubtedly
contributed
the most to the success of the project. The companies use of
value engineering, constructability, and preplanning and
planning that included all members of the group helped to
keep
2. BURJ KHALIFA
CONSTRUCTION TIME: 48 MONTHS
SEQUENCES OF CONSTRUCTION
MAJOR EQUIPMENTS
The process of selecting the right equipment to ensure delivery of
materials and workers effectively and efficiently is an art in its
own right. Selecting the optimal equipment and vertical
transportation system for construction requires ongoing analysis
and constant
modifications due to the dynamic nature of the project during its
construction life.
.
.
.
.
.
.
.
.