CBP Final
CBP Final
CBP Final
Excavation &
04 . Construction
First
Level
Strut
First
Level
Strut
Installation of
Steel Strut
of Underground
Structure
Second
Level
Strut
Lowest
Level
Strut
Base
Slab
them to a minimum.
Formation
Level
05 . Construction
06 . Backfilling &
of Underground
Structure
Proposed
Underground
Structure
Reinstatement
Reinstated
Road
Roof Slab
Backfill
Completed
Underground
Structure
Side
Wall
Hoarding
Diverted
Road
October 2004
First
Level
Strut
Construction
Site
CONSTRUCTION OF
CONTIGUOUS BORED
PILE WALL
01 . Installation of
02 . Excavation &
Retaining Wall
Retaining
Wall
First
Level
Strut
Installation of
Steel Strut
Refer to 03.
Augering of Borehole
CONSTRUCTION OF
CONTIGUOUS BORED PILE WALL
Refer to 05.
Concreting of Borehole
Refer to 02.
Installation of Casing
Safety Measures
Inconveniences
Noise and vibrations are generated when the casing is driven in and
they are installed correctly and safely before the excavation can proceed
from one level to the next level. In addition, our engineers monitor the
to the public.
01 .
03 .
02 .
04 .
Augering of Borehole
Installation of Casing
05 .
06 .
Concreting of Borehole
07 .
Extraction of Casing
Repetition of Process
VibroHammer
VibroHammer
Wooden Peg
Steel
Cage
Auger
Cross-Section View
Casing
Position of
Bored Pile to
be Constructed
Casing
Design
Depth
100-200mm
Cross-Section View
Design
Depth
Bentonite
Slurry
Casing
Casing
Design
Depth
Design
Depth
Completed
Contiguous
Bored Pile Wall
Casing
Cross-Section View
Concrete
Design
Depth
Concrete
Design
Depth
Design
Depth
100-200mm