Download as xls, pdf, or txt
Download as xls, pdf, or txt
You are on page 1of 1

MAJU HOLDINGS SDN. BHD.

MH/ICL/003 (TF)Rev1

Project PROPOSED SERI KEMBANGAN INTERCHANGE AND TOLL Date of


PLAZA
Title:
Inspection
Location/ Unit :

Gridline/ Area: ...

Inspection Checklist for Turfing Works


No.

Item to be Inspect
MATERIAL & PRODUCT COMPLIANCE (Turves)

Status
OK(P) NOT OK(X)

MHSB

Remarks

HSSI

Material delivered as per specification (% of pure turves)


PREPARATION TO START TURFING WORKS

Check the turfing size 300mm x 300mm as per specification?

Check turves cut and shall be plant within 24hours? Healthy

Check the base area well prepared? Correct topsoil thickness


TURFING WORKS

Check suitable material to be used for top dressing? No gap

Check the turfing level: sunken or depression area to fill up

Check water sprayed upon completion of turfing work


TURFING WORKS AT SLOPE AREA

Check wood nailing used to hold the turves to the position?

Check the turfing arrangement? Nailing Patten?


POST-TURFING WORKS

10 Check overall turfing work visually acceptable


11 Check no vehicles enter or traspassing the turfed area
HYDROSEEDING & FIBRO MAT
12 Hydroseeding carried out properly with proper method
13 Fibromat installation properly done? Secured

Inspection Result & Status


Comments / Remarks:

Issued By MHSB:
Compan
.
Date of Inspection:

Name of HSSI Representative's


Compan
.
Date of Inspection:

You might also like