Professional Documents
Culture Documents
Firepumpapplicationdata PDF
Firepumpapplicationdata PDF
:
DATE:
SUPERSEDES:
DATE:
F43.130
JULY 15, 1997
F43.130
AUGUST 1993
PERFORMANCE REQUIREMENTS
TYPES OF FIRE PUMPS
Horizontal split case pumps
Horizontal split case double suction pumps
Vertical In-line centrifugal pumps
End suction single stage pumps
150
Head-capacity curve steepest
shape permissible
Shut-off
140
100
Rated
capacity
65
50
GPM
l/m
GPM
l/m
GPM
l/m
25
95
400
1514
2000
7570
50
189
450
1703
2500
9462
100
379
500
1892
3000
11355
150
568
750
2839
3500
13247
200
757
1000
3785
4000
15140
250
946
1250
4731
4500
17032
300
1136
1500
5677
5000
18925
50
100
150
200
PAGE 1 OF 7
All codes have one thing in common; they are based on some
kind of standards against which products are tested to see if the
products satisfy the Code. Codes in America have the force of
statutory law and nonconforming equipment can be removed,
forcibly if necessary and the purchaser takes the loss. It is
therefore general practice to write into the Codes specific
references to one or other of the several nationally recognized
testing laboratories such as UL, ULC and FM.
TESTING LABORATORIES
PAGE 2 OF 7
TYPE OF INFORMATION
U.S.
STOCK COMPANIES
NOTE:
NEW Fire Pumps shipped to site with incorrect pressures
due to errors must be returned to the manufacturer for
modifications and a new label.
CANADIAN STOCK
COMPANIES
FACTORY MUTUAL
COMPANIES (FM)
Underwriters Laboratories
Canada (ULC)
FM
(Engineering Division)
PUBLISHED
STANDARDS
NFPA 20
NFPA 20
APPROVED EQUIPMENT
LIST
Underwrites Laboratories
Fire Equipment List
FM Approval Guide
Underwriters Laboratories
Canada (ULC)
7 Crouse Road
Scarborough, Ontario
M1R 3A9
FACTORY MUTUAL
1151 Boston-Providence
Turnpike P.O. Box 9102
Norwood, Mass.
02062
LOCAL INSPECTION
GROUP
Insurers Advisory
Organization
(I.A.O.)
FM District Office
PAGE 3 OF 7
GENERAL
It is the responsibility of the manufacturer to establish and
maintain an effective Quality Control Program to assure that all
purchased parts, parts fabricated within the manufacturers
factory and finished pumps intended to bear the ULC/UL/FM
Listing Marks comply with the construction requirements
detailed in the individual sections of the Procedure Guides.
TEST TO BE CONDUCTED
The manufacturer conducts an operation test and a hydrostatic
pressure test on each Listed Fire Pump. The operation test is
conducted to determine the pump speed, horsepower input,
suction pressure and discharge pressure at zero flow (shutoff),
rated capacity and 150% rated capacity.
PAGE 4 OF 7
UL
ULC
Insurer
Insurance
Local
Advisory
Inspection Services
Organization
Office
Group
(I.A.O.)
(I.S.O.)
FM
Govt
Agency
FM
District
Office
Govt
District
Office
PAGE 5 OF 7
STEP 6
PAGE 6 OF 7
- 55 PSI
Stop Point:
Fire pump & Jockey Pump:
Start Point:
Jockey Pump:
= cut-in
= 100 PSI
Start Point:
Fire Pump:
= cut-in
= 95 PSI
= cut-out
= 110 PSI
+ 5 PSI
+ 5 PSI
= 110 PSI
Fire Pump:
Cut- in 95 PSI - Cut-out 110 PSI
Jockey Pump: Cut- in 100 PSI - Cut-out 110 PSI
Circulation Relief Valve to open at 110 PSI
Resume:
80
efficiency
60
head
40
BHP
20
40
20
250
500
750
1000
1250
1500
CAPACITY (USGPM)
S.A. Armstrong Limited
23 Bertrand Avenue
Toronto, Ontario
Canada, M1L 2P3
Tel; (416) 755-2291
Fax: (416) 759-9101