Professional Documents
Culture Documents
SAIC-A-2001 Rev 0
SAIC-A-2001 Rev 0
SAIC NUMBER
DATE APPROVED
SAIC-A-2001
PROJECT TITLE
WBS / BI / JO NUMBER
EQUIPMENT ID NUMBER(S)
EQUIPMENT DESCRIPTION
REV. NO.
25-May-05
QR NUMBER
MECH-
CONTRACTOR / SUBCONTRACTOR
EQPT CODE
SYSTEM ID.
PLANT NO.
MH's SPENT
TRAVEL TIME
ITEM
No.
ACCEPTANCE CRITERIA
REFERENCE
A1
Proect Quality
Plan
A2
SAES-A-004,
Para. 5.6.1
A3
SAES-L-150
Para. 7.2
A4
G.I-2.102,
Para. 5.16
A5
Control of pressurization.
G.I-2.102,
Para. 5.16
A6
Test duration
SAES-L-150
Para. 5.12.2
A7
SAES-L-004,
Para. 5.6.1
A8
G.I-2.102,
Para. 5.8
A9
G.I-2.102,
Para. 5.4
G.I-2.102,
Para. 5.2 l
SAES-L-004,
Para. 5.6.1
G.I-2.102,
Para. 5.2 n
A13 Areas to be kept free of people during the test or location of barriers.
G.I-2.102,
Para. 5.11 to 5.14
G.I-2.102,
Para. 5.11
G.I-2.102,
Para. 5.6
G.I-2.102,
Para. 5.20
G.I-2.102,
Para. 5.21
Page 1 of 3
PASS
FAIL
N/A
RE-INSP DATE
SAIC-A-2001
PROJECT TITLE
ITEM
No.
A18
SAIC NUMBER
WBS / BI / JO NUMBER
REFERENCE
ACCEPTANCE CRITERIA
Safety Instruction Sheet (SIS) where required. (ie: Critical Plant Piping,
Vessels, Pipelines)
G.I.-2.102, Para.
5.2 t
G.I.-2.102, Para.
5.2 t
G.I-2.102,
Para. 5.21
SAES-A-004,
Para. 5.2
SAES-A-004,
Para. 6.3.2
Hydrotest at top of vessel shall be 1.5 times the MAWP for ASME Div. 1
vessels and 1.25 times the MAWP for ASME Div. 2 vessels.
SAES-A-004,
Para. 6.3.1
SAES-L-150,
Para. 7.4.3
A23
G.I-2.102,
Para. 5.17
G.I-2.102,
Para. 5.19
G.I-2.102,
Para. 5.5
The procedure contains Forms for recording the test, i.e: Pressure test
Report Form, ie; SATR-A-2001.
SAES-A-004,
Para. 5.6.1
SAES-A-004,
Para. 8.3
B1
B2
Test limits are indicated. (Note: For complex systems, test limits are
identified by Test numbers.)
G.I.-2.102,
Para. 5.2 a
B3
G.I.-2.102,
Para. 5.2 b
Page 2 of 3
SAES-L-310,
Sec . 7
DATE APPROVED
25-May-05
QR NUMBER
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
SAIC-A-2001
PROJECT TITLE
ITEM
No.
DATE APPROVED
WBS / BI / JO NUMBER
ACCEPTANCE CRITERIA
REFERENCE
B4
G.I.-2.102,
Para. 5.2 c
B5
G.I.-2.102,
Para. 5.2 d
B6
Indicates the test pressure and the test pressure limiting factor and/or
location of lowest rated component in determining the test pressure.
G.I.-2.102,
Para. 5.2 e
B7
G.I.-2.102,
Para. 5.2 f
B8
G.I.-2.102,
Para. 5.2 g
B9
G.I.-2.102,
Para. 5.2 m
B10
G.I.-2.102,
Para. 5.2 h
25-May-05
QR NUMBER
MECH-
CONTRACTOR / SUBCONTRACTOR
PASS
FAIL
N/A
RE-INSP DATE
REMARKS:
REFERENCE DOCUMENTS:
1. SAES-A-004, General Requirements for Pressure Testing, (30June, 2003),
2. SAES-L-150, Pressure Testing of Plant Piping and Pipelines, (30 September, 2003)
3. Saudi Aramco General Instruction, G.I.-2.102, Pressure Testing Safely, (22 July, 2001),
Contractor / Third-Party
Saudi Aramco
Construction Representative*
PMT Representative
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
T&I Witnessed
QC Record Reviewed
Work Verified
QC Inspector
PID Representative
Performed Inspection
QC Supervisor
Name, Organization,
Initials and Date:
Y = YES
Page 3 of 3