S L. N o Item Date of Submission From HO Date of Submission To Client For Approval (KIOCL Ref)

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

S

L.
N
o
1

Item
Long stub drawings for S1N, TA3N and DE

Date of
submission
from HO

Date of submission
to Client for
approval (KIOCL ref)

15.04.2016
28.04.16 /L-079
(Submitted with
approval of TD of tower
received 25.04.16)

ITP of Tower

18.04.2016

HWF clarification and type test report from


MOSDORFER

19.04.2016

21.04.16 /L-76

Revised drawings for TA1N

22.04.2016

03.05.16 /L-40 R2/L-41


R2

NGK revised type test plan along with


pollution test

25.04.2016

03.06.16 /

AMWAJ documents

25.04.2016

03.05.16/L-086
(Submitted along with
NFOC& JB)

Revised drawings for TA2N

27.04.2016

03.05.16 / L-43R2/L42R2

TA3N revised drawings

29.04.2016

04.05.16 /L-58R1/L59R1

Vibration study for Vibration dampers for


OPGW

29.04.2016

03.05.16 /L-85

10

Third Party Inspection CV's for OPGW


(additional)

30.04.2016

11

Approved Type test report of OPGW

02.05.2016

12

Third Party Inspection CV's for Hardware


fittings

04.05.2016

13

NGK details for Type test schedule

04.05.2016

02.05.16/L-84

5th or 6th May