Amps X 10 PMI (Nom. kV=10, Plot Ref.

kV=10)
.5

10

50

100

500

1K

5K

1K

10K
1K

MT2
10 kV

500

500

TRAMO 2
R-BACKUS

O-->I

PMI
10 kV

100

100

TRAMO 3

50

50

SAM 1
10 kV

10

10

TRAMO 2
R-BACKUS - P
Trip 3

.5

.5

TRAMO 3
F-SAM1
Chance
Fuse Link (K)
6A

.1

R-BACKUS - 3P
7.217kA @ 10kV
(Asym)

.1

.05

.05
F-SAM1 - 3P
4.56kA @ 10kV
(Asym)

.01
.5

10

50

100

500

1K

Amps X 10 PMI (Nom. kV=10, Plot Ref. kV=10)


PMI - SAM1
Project:
Location:
Contract:
Engineer:

Coordinacion Playas del Sur


Caete
Luis Alata Contreras
Ing. Csar Chilet

Fault: Phase

5K

.01
10K

ETAP Star 12.6.0H

Seconds