Code of Practice For Selection, Installation and Maintenance of Transformer
Code of Practice For Selection, Installation and Maintenance of Transformer
CODE OF PRACTICE
FOR SELECTION ,
INSTALLATION AND
MAINTENANCE OF
TRANSFORMER
Part 2
INSTALLATION
Guided by:
Mr. M R Manjunath.
INTRODUCTION
GENERAL
GUIDELINES
Exchange of
information
Interchangeability.
Isolation.
Provision for
draining oil.
Neutral connection
TRANSPORTATION
o
Rail transport.
Road transport.
Water transport.
INSPECTION
STORAGE
Quantity of
capacity
Vacuum pump
Liters/h
oil to be
2500
Up to 20000
liters
2500/1000v megger
5000
Up to 50000
liters
10000
More than
50000 liters
Lifting equipment
Oil purifier
Pvc wires
purified
Conservator
Tap changers
Dehydrating Breathers
1)WTI
2)OTI
Buchholtz relay
Explosion vent
Temperature indicators
INSTALLATION
Precautions
Handling
Facilities
for maintenance
Site preparation
a)Indoor sites
b)Outdoor sites
Foundation
Cables
Bushing
Precautions
against risk of
fire
Filling transformer with
oil
a)Drying of oil
Safety
precautions
CONCLUSION
Every
Prepared by:
BASAVARAJ S A
CHETHAN M B
HARSHA R K A
HITHESH C N
MADHUKUMAR