Draft Su Rvey: SP Pecimen of Calcu Ulation: Draft Su Urvey: Proce Edures and C Calculation
Draft Su Rvey: SP Pecimen of Calcu Ulation: Draft Su Urvey: Proce Edures and C Calculation
pecimen of Calcu
ulation
As I have
h
promiseed you, I wriite down this post to expplain specim
men of Calcuulation in Drraft
Survey
y. Please alsso refer to the previous post
p Draft Suurvey : Proceedures and C
Calculation.
Ok, no
ow we could
d directly go
o to the point. The vesssel has alonngside at thee wharf in poort
to disccharge the grrain cargo. The
T Ships Particulars shhown :
Name of Vessel : MV. OCEA
AN BALL, Port of Reggistry (POR)) : Panama, Lenght Ovver
All (L
LOA) : 182.0
00 M, Leng
ght Between
n Perpendicuulars (LBP) : 179.00 M, Breath (B
B) :
32.20 M, Depth (D) : 17.15 M, Gross Tonnage (G
GT) : 28,3422 MT, Net Tonnage (N
NT)
: 17,66
64 MT, Summer Draft (SD) : 12
2.163 M, S
Summer Deadweight (D
DWT) : 52,9998
MT, Light Sh
hip (LS) : 7,780 MT,, Constant (CS) : 3200 MT, F
Fore Distannce
to Perp
pendicular (Fd)
(
: 1.70 M, Afterr Distance to Perpendiccular (Ad) : 9.45 M. S
See
Picturee :
The Su
urveyor cam
me onboard and
a made Draft Survey to determinne the quantiity of cargo on
arrivall. During in
nspection, sh
hes draft marks
m
and oothers data finds as thee followingss :
Forre Draft Port
P
(FP) : 10.79 M / Fore D
Draft Starbboard (FS) : 10.81 M
M.
Mid Draft Po
ort (MP) : 10.90 M / Mid Draft Starrboard (MS
S) : 11.03 M
M.
Aft Draft Port (AP) : 11.16 M / Aft D
Draft Starbooard (AF) : 11.19 M
M.
Density
of
Sea
Water
W
S
Sample
(Den)
1.0221.
Ballast Water (BW) : 265.00 Cubic Meter at Density 1.025, Fresh Water (FW) : 183.00
MT.
Fuel Oil (FO) : 612.00 MT, Diesel Oil (DO) : 161.00 MT, Lub Oil (LO) : 29.00 MT.
Apparent
Trim
(AT)
Am
Fm
11.175
10.800
0.375
M.
Length Between Mark (LBM) = LBP (Fd + Ad) = 179.00 (1.70 + 9.45)
= 167.85 M
Draft Correction to Distance to Perpendicular.
Fore Correction (Fc) = (Fd x AT) / LBM = (1.70 x 0.375) / 167.85 = 0.003798
= 0.004 M (rounded to 3 Decimals).
Mid Correction (Mc) = (Md x AT) / LBM = (0.00 x 0.375) / 167.85
= 0.000 M (Not Available)
Aft Correction (Ac) = (Ad x AT) / LBM = (9.45 x 0.375) / 167.85 = 0.021112
= 0.021 M (rounded to 3 Decimals).
True Draft and True Trim
Fore Draft Corrected (Fcd) = Fm + Fc = 10.800 + (-0.004) = 10.796 M.
Mid Draft Corrected (Mcd) = Mm + Mc = 10.965 + 0.000 = 10.965 M.
Aft Draft Corrected (Acd) = Am + Ac = 11.175 + 0.021 = 11.196 M.
True Trim (TT) = Acm Fcm = 11.196 10.796 = 0.400 M.
Final Draft Calculation
Fore and Aft Mean (FAm) = (Fcd + Acd) / 2 = (10.796 + 11.196) / 2 = 21.992 /2 = 10.996
M.
Mean of Mean Draft (MM) = (Mcd + FAm / 2) = (10.965 + 10.996) /2 = 21.961 / 2 =
10.9805 M.
Quarter Mean (MMM) = (MM + Mcd) /2 = (10.9805 + 10.965) /2 = 21.9455 /2 =
10.97275 M.
= 10.973 M.
Hydrostatic Table
Refer to the Table, we could obtain :
Displacement (Disp)
Disp at 10.970 M : 54,266.860 MT (DISP. FULL).
Disp at 10.980 M : 54,321.070 MT (DISP. FULL).
Disp at 10.973 M : 54,266.860 +[ {(10.973 10.970) / (10.980 10.970)} x (54,321.070
54,266.860)]
= 54,266.860 {(0.003 /0.010) x 54.210} = 54,266.86 + (0.3 x 54.210)
= 54,266.860 + 16.263 = 54,283.123 MT
Ton Per Centimeter (TPC)
TPC at 10.970 M : 54.210 MT (Below TPC on Table).
TPC at 10.980 M : 54.220 MT (Below TPC on Table).
TPC at 10.973 M : 54.210 +[ {(10.973 10.970) / (10.980 10.970)} x (54.220
54.210)]
= 54.210 {(0.003 /0.010) x 0.010} = 54.210 + (0.3 x 0.010)
= 54.210 + 0.003 = 54.213 MT.
Longitudinal Centre Flotation (LCF)
LCF at 10.970 M : 1.180 MT (Below LCF on Table).
LCF at 10.980 M : 1.190 MT (Below LCF on Table).
LCF at 10.973 M : 1.180 +[ {(10.973 10.970) / (10.980 10.970)} x (1.190 1.180)]
= 1.180 {(0.003 /0.010) x 0.010} = 1.180 + (0.3 x 0.010) = 1.180 + 0.003 = 1.183 M.
Momeent To Chan
nge Trim (M
MTC)
MTC
C = MTC 1 MTC 2.
MTC
C 1 = MMM
M + 0.5 = 10.973 + 0.5 = 11.473 M.
MTC
C 1 at 11.47
70 M : 709.9
910 (Below Table).
MTC
C 1 at 11.480
0 M : 710.0
060 (Below Table).
T
MTC
C 1 at 11.473
3 M : 709.91
10 +[ {(11.473 11.470 ) / (11.480 11.470)} x (710.060
709.91
10)]
= 709..910 {(0.003
3 / 0.010) x 0.150}
0
= 709
9.910 + (0.3 x 0.450) = 7709.610 + 0..045 =
709.95
55.
MTC
C 2 = MMM
M 0.5 = 10.973 0.5 = 10.473 M.
MTC
C 2 at 10.47
70 M : 686.4
460 (Below MTC on Taable).
MTC
C 2 at 10.480
0 M : 686.7
770 (Below MTC
M
on Tabble).
MTC
C 2 at 10.473
3 M : 686.46
60 +[ {(10.473 10.470 ) / (10.480 10.470)} x (686.770
686.46
60)]
= 686..460 {(0.003
3 /0.010) x 0.310} = 686.460 + (0.3 x 0.310) = 6686.460 + 0.0093 =
686.55
53.
So, MTC
M
= MTC
C 1 MTC 2 = 709.955 686.553 = 23.402.
**** From
F
the ab
bove resultss, we collecteed the data as follows:
Disp
p = 54,283.123 MT, Trrue Trim (TT
T) = 0.400 M
M, LBP = 1179.00 M,
TPC
C = 54.213, LCF = 1.18
83, MCT = 23.402.
First Trim
T
Correection (FTc))
FTc = (TT x TPC
C x LCF x 100)
1
/ LBP = (0.400 x 544.213 x 1.1883 x 100) / 179.000
= 256..35916 / 179
9.00 = 14.331615 = 14.332 MT.
Secon
nd Trim Corrrection (ST
Tc)
STc = (TT x TT x MTC x 50
0) / LBP = (0
0.400 x 0.4000 x 23.402 x 50) / 179.0000
= 185..536 / 179.00
0 = 1. 04589
99 = 1.046 MT.
M
Displa
acement Corrected to Trim
T
(DispT
T)
Disp
pT = Disp + (FTc + STc)) = 54,283.123 + (14.3322 + 1.046) = 54,283.1233 + 15.378
= 54,2
298.501 MT..
Densitty Correctio
on (Denc) <
Actu
ual Density (ADen)
(
= Saample Sea Water
W
Densityy = 1.021
We haave completeed the Initiall Draft Surveey, I hope it useful and see you in thhe next post.
Regard
ds,
Survey