Professional Documents
Culture Documents
EA-787-F-0002 A-101 - (Sheet @A1)
EA-787-F-0002 A-101 - (Sheet @A1)
04
07
METALLIC FRAME
800
PRV
400
BLOCK WALL
METALLIC FRAME
HOSE REEL
F.F.L
02
05
600MM
INLET ASSEMBLY
DRY RISER
WET RISER
300MM
CONCEALED SPRINKLER
25 TEE
900MM
ELEVATION
PULL HANDLE
150 PIPE
ARCHITR
NIPPLE
25 DROP NIPPLE
25 x 15 REDUCER
FALSE CEILING
CEILING PLATE (ESCUTCHEON)
FALSE CIELING'
FINISH GROUND
LEVEL
600MM
65mm30M LONG
RUBBER HOSE REEL
65 LANDING VALVE TO
STRAP LOCKED WITH
COMMON KEY
FALSE CEILING
CEILING PLATE
(ESCUTCHEON)
WATER MOTOR
ALARM GONG
TO SYSTEM
DRAIN
BALL VALVE
PRESSURE GAUGE
(TYPICAL)
08
VARIABLE
IN-BUILT PRV
F.F.L
3Kg. CO 2 FIRE
EXTINGUISHER
SPRINKLER
DISTRIBUTON
PIPE
CHECK VALVE
DRAIN
ALL RIGHTS RESERVED. NO PART OF THIS DRAWING MAY BE REPRODUCED OR TRANSMITTED IN ANY FORMS BY ANY MEANS WITHOUT WRITTEN PERMISSION OF THE COPYRIGHT HOLDER.
03
06
09
ESCUTHEON PLATE
BRANCH LINE
CONC. WALL
PIPE SLEEVE
NIPPLE
TO SPRINKLER SYSTEM
BARANCH PIPE
PENDENT TYPE
SPRINKLER HEAD
CEILING LINE
SIDEWALL TYPE
SPRINKLER HEAD
BRANCH LINE
25 mm(1")
300
1m MINIMUM
KEY PLAN:
NOTES:
CLIENT:
UNITED BANK
LIMITED
DESCRIPTION
ARCHITECTURE CONSULTANT:
REV.
Z.ALI
DATE
SCALE
NTS
DATE
REVISION
FINAL TENDER
NOVEMBER 2015
A1
PROJECT:
M.Sajid Ali
DRAWN
ISSUE
DESIGN
S.ZIA
CHECKED
APPROVED
EA-787-F-0002
DRAWING NO.
TYPICAL DETAILS-01
FIRE FIGHTING LAYOUT
DRAWING TITLE:
787
PROJ CODE